Widgie Annual Report 2023
Released
Released
Announcement PDF
ANNUAL
REPORT
2023
CONTENTS
About Widgie Nickel
01
Chairman’s Letter
04
Review Of Operations
05
ESG Report
21
Directors’ Report
31
Auditors Independence Declaration
50
Independent Auditors Report
51
Directors’ Declaration
55
Consolidated Statement Of Profit Or Loss
And Other Comprehensive Income
56
Consolidated Statement Of Financial Position
57
Consolidated Statement Of Changes In Equity
58
Consolidated Statement Of Cash Flows
59
Annual Mineral Resource Statement
92
Schedule Of Mining Tenements
94
Shareholder Information
95
Corporate Directory
98
ABOUT WIDGIE
NICKEL LIMITED
Widgie holds a unique consolidation of a
vast
240km²
prospective
economy
package
nickel,
metal
of
highly
lithium
and
new
prospects
within
the
prolific Eastern Goldfields nickel sulphide
belt
situated
proximal
to
significant
infrastructure.
Existing Mineral Resources of 170kt of
nickel have been defined to underpin
Widgie's aim to be a standalone Nickel
producer with significant upside potential.
A maiden lithium Resource declared with
exciting upside potential.
With
dedicated
technical,
human
and
financial resources Widgie Nickel intends
to build on the work completed on the Mt
Edwards Project to date which provide a
sound
basis
for
mining
studies
to
evaluate the development of a long life
low carbon Nickel production centre.
Advancing nickel and lithium Resources towards
production
Providing Critical metals for a cleaner future and
growing decarbonisation
Confirmed presence of copper, cobalt and PGM
offers further value potential
1
FARADAY LITHIUM
OPPORTUNITY COMES TO THE
FORE
Following discovery of rock chips grading up to 3.70%
Li 2O in October 2022 the Company fast tracked its
exploration and development activities at the Faraday
Lithium deposit which has seen the deposit evolve to be
on the cusp of development less than a year from time of
discovery hitting key milestones along the way:
October 2022 – Discovery of high grade rock chips and
surface mapping
November 2022 – Lithium exploration drilling commences
January 2023 – Completion of initial exploration drilling
program
February 2023 – Offtake discussions commence for DSO
March 2023 – Declaration of maiden resource
May 2023 – Mining proposal lodged with DMIRS
March 2023 - Metallurgical testwork confirms robust upgrade and ability to produce saleable concentrate
August 2023 – Faraday mining proposal conditional approval received from DMIRS subject only to
completion of a flora survey and clearance as prescribed under the Aboriginal Cultural Heritage Act
2021
2
WIDGIE SCOPING STUDY
High grade nickel discovery Eastern Limb at Widgie Townsite
Exploration success. Gillett South and Gillett North Extension
Exploration review highlights potential nickel channels at Widgie South yet to be drill tested
Resource infill drilling completed on all deposits
1Mt of inferred resource converted to Indicated as at 30 June 2023
Metallurgical testwork commenced
Geotechnical data capture complete
Design work commenced
3
Widgie Nickel Limited
CHAIRMAN’S LETTER
Dear Shareholder
It has been an eventful year for your Company with many significant achievements
made, building on the progress from the Company's inaugural year. The Company
has been diligently working towards achieving the objectives set out in our
Prospectus with a few welcome but unexpected surprises along the way that have
further reinforced the value proposition of our 100% owned Mt Edwards project.
Against waning sentiment towards nickel the Company remained focused on building the investment case,
however with exploration success discovering a spodumene rich pegmatite outcropping on the Company's
tenure this provided a new avenue for the Company to create value.
The year was an eventful one with many highlights and regular news flow, with some twenty market sensitive
announcements made throughout the year.
Worthy of special mention is the discovery of Faraday, its delineation and the fast-tracking of the Company's
lithium development in less than twelve months is quite remarkable. This coupled with the later discovery of
the adjacent Trainline mineralisation augurs well for a development pathway in the forthcoming year.
Up until the end of the financial year the Company has continued to invest significantly in drilling with over
100,000 meters of Reverse Circulation and Diamond drilling completed since ASX listing. The results of this
drilling provides Widgie with increased confidence in its Resource base for its feasibility studies. This will allow
the Company to further develop its nickel development strategy, not limited to development of a single mining
operation, but to consider the project in a more cost-effective manner achieving economies of scale with
multiple mines operating concurrently. An expanded standalone operation with a purpose built, bespoke
processing facility designed to maximise recoveries and minimise operating costs per tonne. This will enable
the Company to maximise revenues through the potential for sale to multiple counterparties achieving higher
levels of payability, whether that be for the contained nickel and/or the increasingly valuable by-products.
Widgie has prudently managed the proceeds of its initial $24m equity raising, however with the increased drill
requirements associated with the lithium endowment the Company took the opportunity to bolster its cash
reserves during the year by raising an additional $12 million and importantly attracting high quality institutional
investors. The Company welcomes Virtue Investments Corporation as our new major shareholder and the
continued support of the other participants supportive of the Company’s endeavours.
I am happy to report that Steve Norregaard and the team have navigated these challenges and generated
significant positive momentum that places us in a great position for the year ahead. The inherent value of the
Company from a market perspective may well have retracted, however there remains much latent value that I
am firmly of the view will rise to the surface as the year evolves and the Company’s progress advances.
On behalf of the Board, I’d like to thank you for your continuing support and interest in the Company. We look
forward to another exciting year ahead.
Andrew Parker
Non-executive Chairman
4
Widgie Nickel Limited
Review of Operations
REVIEW OF OPERATIONS
The directors of Widgie Nickel Limited (“Company” and “Widgie”) present the Company’s financial report for the
Company and its controlled entities (“Consolidated Entity” and “Group”) for the year ended 30 June 2023.
Increased confidence in Resources, new discoveries and Lithium opportunity
comes to the fore
Mt Edwards Nickel and Lithium Project (Widgie 100%)
Widgie controls a dominant ~240 square kilometre land package over the prolific nickel producing
Widgiemooltha Dome located 80km south of Kalgoorlie in Western Australia.
Ideally positioned adjacent to key infrastructure with an already established Mineral Resource base of some
170kt of contained nickel over 12 separate deposits, the Company plans to advance its Mt Edwards Nickel
Project through to initial low capital cost development in addition to carrying out ongoing exploration searching
for more high-grade sulphide nickel in the region.
Increased confidence from the results from the Resource development infill, extension programs and
exploration success have emboldened Widgie to commence a Scoping Study for a larger nickel mining
operation than was previously planned including consideration of a standalone processing plant located onsite.
In just over 8 months from rock chip discovery to mining permitting the emergence of the Faraday Lithium
deposit and the potential for direct shipping ore presents the Company with a real near-term mining
development opportunity to realise a return on the deposit. This has potential to provide funding to advance
and pursue the Company’s larger nickel development activities and aspirations.
Table 1 – Mt Edwards Project Nickel Mineral Resources
Indicated
Deposit
Gillett
Widgie 3
Widgie Townsite
Munda
Armstrong
132N
Cooke
Inco Boundary
McEwen
McEwen Hangingwall
Mt Edwards 26N
Zabel
TOTAL
Inferred
TOTAL Resources
Tonne
(kt)
Nickel
(%)
Tonne
(kt)
Nickel
(%)
Tonne
(kt)
Nickel
(%)
Nickel
Tonnes
915
1.6
1,183
1.69
630
34
1.8
2.9
272
3,034
1.94
1.7
643
626
1,293
508
15
426
154
464
1,133
1,916
871
53
8,102
1.3
1.5
1.5
1.9
4.7
1.9
1.3
1.2
1.4
1.4
1.4
2.0
1.4
1,558
626
2,476
508
645
460
154
464
1,133
1,916
871
325
11,136
1.5
1.5
1.6
1.9
1.9
2.0
1.3
1.2
1.4
1.4
1.4
2.0
1.5
23,400
9,160
39,300
9,398
12,200
9,050
2,003
5,590
15,340
26,110
12,400
6,360
170,311
Mineral Resources quoted using a 1% Ni block cut-off grade. Small discrepancies may occur due to rounding.
5
Widgie Nickel Limited
Review of Operations
Figure 1 – Location map of Widgie’s Project Area – Mt Edwards
Faraday Lithium deposit - Lithium opportunity comes to the fore
Following discovery of rock chips grading up to 3.70% Li2O in October 2022 the Company fast tracked its
exploration and development activities at the Faraday Lithium deposit which has seen the deposit on the cusp
of development less than a year from time of discovery hitting key milestones along the way:
October 2022 – Discovery of high grade rock chips and surface mapping
November 2022 – Lithium exploration drilling commences
January 2023 – Completion of initial exploration drilling program
February 2023 – Offtake discussions commence for DSO
March 2023 – Declaration of maiden resource
6
Widgie Nickel Limited
Review of Operations
March 2023 - Metallurgical testwork confirms robust upgrade and ability to produce saleable
concentrate
May 2023 – Mining proposal lodged with DMIRS
August 2023 – Faraday mining proposal conditional approval received from DMIRS subject only to
completion of a flora survey and clearance as prescribed under the Aboriginal Cultural Heritage Act
2021
Table 2 – 2023 Faraday Maiden Mineral Resource Estimate at a 0.30% Li2O grade cut-off
Lithium Resources (0.3% cut-off)
Deposit
Faraday
TOTAL
Indicated
Tonne Li2O
(kt)
(%)
105
0.65
105
0.65
Inferred
Tonne Li2O
(kt)
(%)
376
0.58
376
0.58
TOTAL Resources
Tonne Li2O
Li2O
(kt)
(%)
Tonnes
481
0.59
2939
481
0.59
2,939
Notes
•
•
Tonnes and grades have been rounded to reflect the relative uncertainty of the estimate
Faraday Mineral Resource is contained within tenement M15/102
The Faraday-Trainline Lithium Project area is located on Mining Lease M15/102, 4km west north-west of the
Widgiemooltha townsite. Access is via the Coolgardie-Norseman Rd, 63km south of Coolgardie. Faraday and
Trainline are central to Widgie’s Mt Edwards Project, covering a significant land holding within the “Lithium
Corridor” between Mt Marion to the north and Pioneer Dome to the south (Figure 2).
Figure 2 - Regional Geology showing Faraday and Trainline Lithium Project location, and surrounding lithium
Projects
7
Widgie Nickel Limited
Review of Operations
Further exploration work has demonstrated that there is significant potential upside to the Company’s lithium
resources at Faraday and surrounds. In July 2023 Widgie announced it had unearthed a new near surface lithium
prospect directly to the north of the Faraday Lithium Deposit. The new prospect is named Trainline.
In addition, at the Faraday deposit itself, 80 metre step out drilling to the west downdip demonstrated that
mineralisation continues at depth. Overall, the drill results indicate strong potential to increase lithium
resources. Further XRD analysis indicates that spodumene* is the exclusive lithium bearing mineral.
The drilling results at Trainline and Faraday included:
Trainline Discovery:
•
23MERC118
and
incl.
•
23MERC114
•
23MERC113
Incl.
Incl.
2m @ 0.86% Li2O from 4m
9m @ 0.82% Li2O from 17m
4m @ 1.19% Li2O from 22m
10m @ 0.68% Li2O from 43m
7m @ 0.79% Li2O from 43m
7m @ 0.61% Li2O from 30m
3m @ 0.94% Li2O from 30m
Faraday Extension:
•
23MERC129
•
23MERC131
and
Incl.
and
•
23MERC132
and
Incl.
1m @ 0.89% Li2O from 23m
3m @ 0.63% Li2O from 92m
3m @ 0.63% Li2O from 99m
1m @ 1.20% Li2O from 100m
4m @ 0.47% Li2O from 105m
2m @ 0.55% Li2O from 130m
5m @ 0.69% Li2O from 137m
3m @ 0.87% Li2O from 137m
*XRD mineral identification of 16 samples, identifies spodumene as the exclusive lithium bearing mineral
Figure 3 - Plan view of Faraday - Trainline Lithium Project. Displaying drill location and cross cutting dolerite
intrusive.
8
Widgie Nickel Limited
Review of Operations
New Nickel discoveries – exploration success
Following the discovery of Gillet North in the prior year, Widgie has continued to enjoy exploration success with
the drill bit during the current year with exciting discoveries to the south of Gillett, Widgie Townsite and at
Munda.
A nickel Mineral Resource upgrade is targeted for the current half on the back of these strong results.
Gillett
In July 2023 significant nickel mineralisation intercepts outside of current Gillett Resource confirmed:
23MERCD057 extends Gillett mineralisation 270m to the south of the current Resource
23MEDD007 extends Gillett mineralisation 120m to the north of the current Resource
23MERCD027 confirms high-grade core of the Gillett North target
Widgie South remains open to the north and south of the current Resources
Drilling has increased Resource confidence for future mining studies
Significant nickel intercepts include:
Gillett:
Infill
23MERCD004 12.0m @ 1.97% Ni from 192m
Incl
7.90m @ 2.55% Ni from 194.1m
Exploration 23MERCD057 7.00m @ 1.14% Ni from 295m
Exploration 23MEDD007
2.12m @ 1.33% Ni from 218m
Gillett North:
Exploration 23MERCD027 13.2m @ 1.68% Ni from 278.88m
Incl
2.51m @ 4.36% Ni from 289.57m
Figure 4 - Gillett and Gillett North long section looking North East – 2023 drilling intercepts highlighted
In May 2023, Widgie announced significant results at the Gillett Resource and surrounding areas, proving that
mineralisation continues to the south of Gillett, an area previously considered “closed off”.
Significant nickel intercepts included:
9
Widgie Nickel Limited
Review of Operations
23MERCD017
30m @ 1.17% Ni, 0.14% Cu, 0.03% Co, 0.04 g/t Au, 0.11 g/t Pd, 0.09 g/t Pt from 214.0m
Inc.
5.0m @ 2.07% Ni, 0.29% Cu, 0.06% Co, 0.13g/t Au, 0.25g/t Pd, 0.22g/t Pt from 214.0m
and
11m @ 1.57% Ni, 0.18% Cu, 0.05% Co, 0.03g/t Au, 0.10g/t Pd, 0.11g/t Pt from 232.0m
23MERCD010 4.31m @ 1.14% Ni, 0.16% Cu, 0.04% Co, 0.04 g/t Au, 0.17 g/t Pd, 0.09 g/t Pt from
225.67m
and
4.35m @ 2.77% Ni, 0.39% Cu, 0.08% Co, 0.22g/t Au, 0.31g/t Pd, 0.17g/t Pt from
233.99m
23MERCD022 7.41m @ 1.63% Ni, 0.20% Cu, 0.05% Co, 0.04 g/t Au, 0.25 g/t Pd, 0.11 g/t Pt from
214.0m
These excellent drilling results to the north and south of the Gillett resource has extended the known nickel
mineralisation to approximately 1.5km strike with infill drilling further increasing the confidence within the
Resource. The 2023 Gillett Mineral Resource Estimate (MRE) update due to commence in August 2023 will
include the maiden addition of the Gillett North discovery. Figure 4 demonstrates the 2023 drilling where hole
23MERCD057 extends the Gillett mineralisation 270m to the south of the current resource and is interpreted to
be on the flank of the mineralised nickel channel. This hole will be utilised to conduct a downhole
electromagnetic (DHEM) survey to vector future drilling to the core of the mineralised nickel channel.
Gillett North infill drilling confirms the presence of high-grade nickel sulphide mineralisation (23MERCD027) on
the western limb of the Gillett anticline. Recent structural interpretation suggests Gillett North is the
continuation of the Gillett mineralised channel system (ref Figure 5). The mineralisation from Gillett has rolled
over the Gillett antiform onto the western limb of the fold that represents the Gillett North mineralisation.
Figure 5 - Schematic of Widgie South geology and mineralisation positions
10
Widgie Nickel Limited
Review of Operations
Figure 6 illustrates the current 2023 drilling of Gillett and Gillett North in plan view and section locations.
Figure 6 – Plan view of Gillett showing drilling and locations of sections
11
Widgie Nickel Limited
Review of Operations
Figure 7 – Drilling being undertaken at the Gillett Deposit
Widgie Townsite
Significant nickel mineralisation intercepts at Widgie Townsite confirms:
High-grade nickel discovery on Eastern Limb of Widgie Townsite Syncline
Drilling to deliver increased Resource confidence for future mining studies at Widgie Townsite
High grade continuity at Widgie Townsite extends at depth
New Eastern Transitional mineralisation identified
Significant nickel intercepts include:
Eastern Limb:
MEDD069
29.0m @ 1.66% Ni from 79m
Incl.
5.0m @ 3.23% Ni from 88m
Widgie Townsite:
MEDD061
30.85m @ 1.59% Ni from 435m
Incl.
13.43m @ 2.74% Ni from 449.7m
And
3.36m @ 3.27% Ni from 471.3m
23MERCD039
14.0m @ 2.73% Ni from 509m
Incl.
11.03m @ 3.19% Ni from 511m
23MERCD038
1.04m @ 5.49% Ni from 479.6m
Eastern Transitional:
23MERCD039
43.0m @ 0.69% Ni from 65m
23MERCD038
22.0m @ 1.02% Ni from 36m
A detailed structural review is underway to enhance the understanding of Widgie South.
12
Widgie Nickel Limited
Review of Operations
Figure 8 - Widgie Townsite long section looking Northeast - Significant intercepts shown
Infill
In regard to infill drilling from viewing Figure 8, MEDD061 and 23MERCD039 confirm the high-grade
mineralisation plunge at Widgie Townsite that remains open at depth. Importantly MEDD061 shows an
exceptionally wide mineralisation intercept of 30.9m @ 1.59% Ni including 13.4m @ 2.74% Ni from 435m and
3.36m @ 3.27% Ni from 471.3m. 23MERCD039 is immediately down plunge of MEDD061 which enforces the
down plunge continuity of the high-grade mineralisation at Widgie Townsite returning 14.0m @ 2.73% Ni.
13
Widgie Nickel Limited
Review of Operations
Figure 9 – Plan view of Widgie Townsite and newly discovered Eastern Limb and Tranistional Mineralisation
Zone. Displaying drill collar locations and section locations
Transitional Mineralisation
The near surface transitional intercepts (illustrated in Figure 8) from 23MERCD038, 23MERCD039,
23MERCD041, MEDD057, MEDD032, and MEDD062 have intercepted broad zones of transitional mineralisation
at the base of oxidisation which collectively appear continuous representing a significant plume of
mineralisation located off the known Widgie Townsite basal contact.
These intercepts were discovered in the RC pre-collars after being identified through routine XRF analysis, with
drilling not specifically targeting this newly discovered mineralisation. A further resampling campaign in nearby
pre-collars confirms the extent of mineralisation from holes drilled to date.
Further work is underway to consider the potential deeper source of this mineralisation. No drilling exists to the
east of this, thus presenting as an excellent exploration target.
Eastern Limb
MEDD069, further to the south, provides a new significant target on the basal contact on the Eastern Limb of
the Widgie Townsite Syncline returning 29m @ 1.66% Ni from 79m, including 5m @ 3.23% Ni. The Eastern Limb
was untested due to previous drill angles being sub-parallel to the contact of the Eastern Limb (Figure 9 and
10). However, MEDD069 has highlighted the potential for a new nickel channel. This area will be subjected to
further drill testing with drilling to be orientated from west to east as opposed to east to west.
14
Widgie Nickel Limited
Review of Operations
Figure 10– Widgie Townsite cross section showing high grade MEDD069 upon the now highly prospective
Eastern Limb of Widgie Townsite Synform
Munda
On 26 June 2023, Widgie was pleased to announce it had received high-grade assay results from its recently
completed drilling campaign at the Munda nickel deposit. High grade nickel mineralisation intercepts included:
MEDD026
12.46m @ 2.05% Ni from 329.6m
Incl.
6.06m @ 3.20% Ni from 336.0m
MERC163
1m @ 4.35% Ni from 59m
MERC167
6.12m @ 4.39% Ni from 246.25m
Incl.
2.55m @ 7.08% Ni from 249.45m
Additionally, further exploration success was achieved, with basal nickel mineralisation discovered 200 metres
to the east of Munda deposit:
MERC259
6m @ 0.81% Ni from 115m
Incl.
2m @ 1.12% Ni from 115m
The Company sees Munda as a complimentary satellite operation to the proposed Mt Edwards nickel operation,
which will be centred at Widgie South and is currently the subject of feasibility studies. Given the existing
significant nickel endowment, Munda with its high tenor mineralisation and low contaminant levels has
potential to contribute high-quality ore to a larger scale, and/or longer life operation. The Munda mineral
resource currently stands at 508kt @ 1.9% Ni for 9,398t of contained nickel @ 1% Ni cut-off (or 320kt at 2.2% Ni
for 7,040t of contained nickel @ 1.5% Ni cut-off).
15
Widgie Nickel Limited
Review of Operations
Reinterpretation of the Munda 3D geological model has highlighted parallel high-grade mineralised shoots not
previously understood. The Munda infill drilling will aid in increasing the confidence of the future resource reestimate increasing the proportion of Indicated resources at Munda for future economic studies.
Enticingly, Munda remains open at depth and exploration success with MERC259 (6m at 0.81% Ni) 200m to the
east of Munda’s M4 mineralised shoot unlocks a significant search space for further Munda style mineralisation
shoots to be discovered. Further work is required to fully understand the context of MERC259 mineralisation.
Figure 11 – Munda longsection looking South – 2023 Geology interpretation with historic significant intercepts
Increased confidence in Resources
Gillett
As discussed above, subsequent and ongoing exploration success since the release of the below Gillett
Resource in January 2023 is expected to result in Resource growth at Gillett in the forthcoming Resource reestimate schedule for H1 FY2024.
The January 2023 MRE expanded the Gillett Mineral Resource by 20% to 1.56 million tonnes at 1.5% nickel,
equating to 23,400 tonnes of contained nickel between 80 and 350 metres below surface.
In addition, 60% of the Gillett Resource is now upgraded to the higher confidence Indicated category.
Importantly, for the first time, the Gillett Resource now quantifies the Palladium and Platinum endowment, with
Pd (0.17g/t) and Pt (0.08g/t) (equating to 8,515oz Pd and 4,007oz Pt).
16
Widgie Nickel Limited
Review of Operations
Table 3 - Gillett Mineral Resource Estimate at various nickel grade cut-offs
Mineral Resource Classification
Indicated
Inferred
TOTAL
Cut-off (Ni %)
Tonnes
(kt)
Ni %
Ni tonnes
1
915
1.6
14,800
1.5
449
2.1
9,400
2
186
2.5
4,700
1
643
1.3
8,600
1.5
151
2.1
3,200
2
24
2.5
600
1
1,558
1.5
23,400
1.5
698
2.1
12,600
2
350
2.5
5,300
Infill results at Gillett, Widgie 3, and Widgie Townsite reaffirm confidence in the MRE and will be used in
conjunction with the current drilling to re-estimate these Resources, to improve and expand geological
confidence.
Figure 12 –Widgie South long section looking East- Significant intercepts
Armstrong Resource Upgrade and Scoping Study
The Armstrong Deposit is on the cusp of being development ready, but will now be incorporated into a Scoping
Study for a broader standalone nickel operation incorporating the Widgie South deposits and 132N. The
Scoping Study for the larger longer life mining operations seeks to unlock substantially more value from
Widgie’s entire Resource base.
In November 2022, Widgie announced a new Mineral Resource Estimate incorporating Platinum-Group
Elements (PGEs) for the Armstrong deposit (“Armstrong”).
The new estimate included information derived from an additional 11,610m of new drilling across 38 holes,
which allowed for a detailed reinterpretation of the geology and mineralisation. Indicated Resources at
Armstrong have been increased to 630,000t @ 1.8% nickel for 11,500t Ni, with 98% of the Resource now within
17
Widgie Nickel Limited
Review of Operations
the higher confidence Indicated category, compared to 83% previously. The Resource now also quantifies the
Palladium + Platinum + Gold (3E) endowment with Au (0.2g/t), Pd (0.4g/t) and Pt (0.2g/t) = 0.8g/t 3E (contained
metal equating to 4,100oz Au, 8,300oz Pd and 4,100oz Pt).
Table 4 - Armstrong Mineral Resource Estimate at a 1% nickel cut-off, October 2022
Class
Tonnes
(kt)
Ni
(%)
Indicated
Inferred
Total
630
15
645
1.8
4.7
1.9
Ni
metal
(t)
11,500
700
12,200
Au
(ppm)
As
(ppm)
Co
(ppm)
Cu
(ppm)
Fe
(%)
MgO
(%)
Pd
(ppm)
Pt
(ppm)
S
(%)
0.2
0.2
0.2
330
260
320
250
500
260
1,330
2,220
1,350
8.3
9.4
8.3
25
19
25
0.4
0.6
0.4
0.2
0.1
0.2
2.1
1.3
2.0
Note: totals may not sum due to rounding
The Mineral Resource Estimate followed Widgie completing a maiden scoping study for the Armstrong deposit
(see ASX announcement dated 26 October 2022 - Scoping Study Highlights Potential of Armstrong Mine).
The scoping study detailed that at then spot assumptions of $US22,000/t Ni and AUD/USD exchange rate of
0.63 Armstrong would deliver free cash flows between $67.8 million and $68.7 million. Even at conservative
base case assumptions of $US18,500/t Ni and 0.70 AUD/USD the project is robust with free cash flows between
$20.8 million and $26.4 million. Current Nickel price compares favourably at approximately $20,000US/t Ni and
0.65USD/AUD.
Figure 13 – An aerial view of the Armstrong open pit
Metallurgy and Marketing
The Company engaged WOOD Engineers to carry out metallurgical evaluation of both the Company’s nickel and
lithium assets.
Nickel work centred around the Armstrong deposit with work ongoing to determine the most appropriate
flowsheet. Significant advancements have been made to maximise recovery using a bespoke flowsheet whilst
having the added benefit of enabling unique processes to be tested to minimise contaminants that are
considered penalties in mineral concentrates. Work remains ongoing with the intent of progressively testing
each resource using this flowsheet to confirm the applicability of the chosen flowsheet to all Widgie resources.
Lithium testing has confirmed acceptable recoveries are readily achievable using Heavy liquid separation (a
proxy for Heavy media separation). Initial results using flotation show great promise with excellent +80%
18
Widgie Nickel Limited
Review of Operations
recoveries achievable at concentrate grades in excess of 6%. Further testwork is ongoing by the Company in
addition to potential offtake discussions.
Future Work
The Company seeks to progress and complete offtake negotiations for its Faraday Lithium Resource. Subject
to satisfactory completion of the foregoing and finalisation of the remaining approvals the Company is hopeful
to commence mining of Faraday during the 2023/2024 financial year.
On the Nickel front, completion of the Scoping Study on an expanded and standalone mining and processing
operation incorporating the Widgie South deposits, Armstrong and 132N is expected in the first half and subject
to a positive outcome this will progress to a full feasibility study.
On completion of the final Resource development and infill drill programs re-estimation of calculation of
Resources for all 6 Resources drilled during the previous 18 months will subsequently feed into the full
feasibility study.
In addition, the Company will have an ongoing targeted exploration effort on both nickel and lithium.
Approvals
Government approvals are in place for planned exploration activities at prospects across Mt Edwards including;
Armstrong, 132N, Munda and Widgie South (Widgie Townsite, Gillett and Widgie 3).
Government approvals allowing dewatering of the Armstrong pit and clearing requirements are also in place
with approval for proposed mining of a “starter pit” at Faraday pending as at years end.
Fund raising – Strongly supported placement
A little under two years since the Company’s listing on the Australian Securities Exchange (ASX code: WIN) the
Company completed its first additional capital raising in May 2023. The raising was a strongly supported $12
million placement at $0.26 per share to fund the continued growth and development of the Mt Edwards Project.
The placement received strong support from new and existing institutional and sophisticated investors
including the introduction of Virtue Investments Corporation (VIC) as a 9.9% shareholder. VIC is a subsidiary of
Ascend Global Investment Fund SPC (AGIF SPC) – Strategic SP.
VIC Rights
Whilst VIC holds at least a 5% equity, securities or convertible interest in Widgie, VIC will have a first right of
refusal in relation to future debt financing. In addition, the Company will use its best endeavours to facilitate
VIC’s participation in future equity offers. These rights are subject at all times to prevailing ASX Listing Rules
and compliance with applicable laws.
Where VIC holds at least a 9.5% interest in Widgie, and if Widgie seeks to expand its Board of Directors, the
Company will consider in good faith the appointment of one VIC representative to the Board.
Competent Person Statement
The information in this report that relates to exploration results is based on and fairly represents information and
supporting documentation compiled by Mr William Stewart, who is a full-time employee of Widgie Nickel Limited.
Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335). Mr Stewart
has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Rese
Share your feedback