WIN Metals Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
1
ASX Announcement
ASX:WIN
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
27 January 2026
December 2025 Quarterly Report
Highlights
• Completed a transformational Scoping Study at the Butchers Creek Gold Project, confirming a
9-year Life of Mine with forecast production of approximately 200koz of gold, underpinned by
strong operating margins, high-grade feed, and a simple, conventional processing flowsheet
delivering robust project economics, based on a gold price assumption of A$5,385 per ounce.
• Delivered exceptional drilling results at the Radio Gold Project, confirming shallow and depth
extensions of high-grade gold mineralisation at the Repeater Prospect, located approximately
100m north of the main Radio mineralised body and now interpreted as its northern continuation,
with standout intercepts including 1m @ 33.95g/t Au, 2m @ 30.58g/t Au (including 1m @ 50.8g/t
Au) and 1m @ 10.11g/t Au from ~100m, highlighting a system that remains open and largely
untested at depth.
• High-grade mineralisation at Radio extended both down-dip and along strike, including 2m @
5.21g/t Au from 102m (25RDRC093), located approximately 20m beyond the current 10 Level
development, confirming high-grade mineralisation continues south beyond existing mine
development and supporting the definition of a maiden Mineral Resource at Repeater and near-
term development optionality.
• Successfully completed a A$5.5 million capital raising on 12 December 2025, with shares
issued at 3.5 cents per share, strengthening the Company’s balance sheet and funding ongoing
drilling at the Radio Gold Project, advancement of the Butchers Creek Gold Project, and general
working capital.
View our hub and signup to receive updates from our InvestorHub:
https://investors.winmetals.com.au/
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to present its Quarterly activities report
for the period ended 31 December 2025.
2
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
“This quarter marks an important step forward for WIN as we continue to build momentum across our gold
portfolio. The completion of the Butchers Creek Scoping Study highlights the quality and development
potential of that asset, while the outstanding drilling results at Radio continue to validate our geological
model and confirm the high-grade nature of the system.
With strong grades emerging both at Repeater and along strike at Radio Main, we are increasingly confident
in the opportunity to grow our gold inventory and progress Radio toward near term development options.
Combined with the successful capital raising completed during the quarter, the Company is well funded
and well positioned to advance its key projects and deliver ongoing value for shareholders.”
BUTCHERS CREEK GOLD PROJECT (100% WIN)
Kimberley Region, Western Australia
Scoping Study
During the Quarter, WIN completed a Scoping Study for the Butchers Creek Gold Project1
, confirming the
technical and financial viability of developing a standalone open pit and underground gold operation with
an on-site processing facility.
Key outcomes of the Scoping Study include (based on a gold price assumption of A$5,385 per ounce):
• Life of Mine: 9 years
• Ore processed: 3.29Mt @ 2.0g/t Au
• Recovered gold: ~200koz
• Average production: ~33kozpa during steady state operations
• Peak production: ~37koz in Year 5
• Pre-production capital: A$142 million
• Free cash flow: A$288 million (pre-tax)
• NPV (8%): A$143 million (pre-tax)
• IRR: 25% (pre-tax)
• AISC: A$3,032/oz
• Payback period: Approximately 3.5 years from commencement of production
The Study is based on the existing Butchers Creek Mineral Resource only, which demonstrates the
potentialto develop a conventional gold operation comprising open pit and underground miningsupported
by a 600ktpa CIL processing plant and associated infrastructure, a simple processing flowsheet and an
open pit strip ratio of approximately 11.8. The robust financial outcomes reflect strong operating margins
derived from high-grade feed, with the Project generating meaningful free cash flow over the Life of Mine
at a gold price assumption of A$5,385 per ounce.
The Scoping Study also confirms that the Project benefits from low technical complexity, with no
requirement for novel processing methods, and highlights opportunities to further enhance value through
optimisation of mine scheduling, potential incorporation of the nearby Golden Crown deposit, and
1
ASX:WIN “Butchers Creek Gold Project Delivers Robust Scoping Study” Released 12 November 2025
3
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
additional resource growth from continued exploration. These opportunities will be assessed as the
Project progresses to the next level of technical evaluation.
The Company has commenced preliminary work streams to advance permitting pathways, stakeholder
engagement and further technical studies aimed at improving confidence levels and refining development
options.
The Scoping Study is a preliminary technical and economic assessment completed to a scoping level of
accuracy of approximately ±40% and does not support the estimation of Ore Reserves. The production
target is based on a combination of Indicated (approximately 96%) and Inferred (approximately 4%)
Mineral Resources. While the inclusion of Inferred Mineral Resources is not material to the financial
viability of the Project, there is no certainty that further exploration will result in the conversion of Inferred
Resources to Indicated or Measured categories.
Figure 1: Butchers Creek open pit cut back design
Figure 2: Butchers Creek underground mine design
4
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 3: Site Layout
Table 1: Project Financial Sensitivity Analysis
Gold Price A$/oz $3,846 $4,615 $5,385 $6,154 $6,923
Payback first gold production Month N/A 56 41 35 32
Max negative cashflow A$M -164 -142 -142 -142 -142
Free cash flow A$M -9 131 288 436 585
NPV 8% pre-finance, pre-tax A$M -54 45 143 241 339
IRR pre-tax % N/A 14 25 34 42
RADIO GOLD PROJECT (100% WIN)
Southern Cross Region, Western Australia
WIN’s maiden drilling programs at the Radio Gold Project delivered consistently strong results during the
Quarter, confirming the presence of high‑grade gold mineralisation across the Repeater, Radio Main and
Radio South areas and reinforcing the Project’s near term development potential.
5
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Repeater Prospect
Drilling at Repeater has defined a coherent, shallow high‑grade system interpreted as the northern
continuation of the historic Radio deposit, separated by a mafic dyke. The program has both infilled and
extended mineralisation, with new intercepts demonstrating excellent continuity from surface to more
than 100m vertical depth and confirming the lodes remain open down‑dip and along strike.
Notable intercepts reported during the Quarter include2,3,4
:
• 2m @ 30.58g/t Au from 25m, including 1m @ 50.8g/t Au (25RDRC108)
• 1m @ 33.95g/t Au from 27m (25RDRC055)
• 1m @ 30.65g/t Au from 51m (25RDRC040)
• 2m @ 13.95g/t Au from 26m (25RDRC037)
• 1m @ 15.53g/t Au from 36m (25RDRC103)
• 1m @ 14.00g/t Au from ~70m (25RDRC063)
• 1m @ 11.40g/t Au from 46m (25RDRC102)
• 1m @ 10.11g/t Au from ~100m (25RDRC082)
These results confirm multiple stacked, high‑grade lodes with strong down‑dip continuity and support the
interpretation of a plunging high‑grade shoot capable of underpinning a maiden Mineral Resource at
Repeater. The shallow nature of much of the mineralisation, immediately adjacent to existing Radio mine
infrastructure, positions Repeater as a potential near term source of high‑grade ore for both open pit and
underground mining scenarios.
Radio Main and Southern Extensions
Extensional RC drilling south of existing development at Radio Main has confirmed that high‑grade
mineralisation continues beyond the current 10 Level ore drive. A highlight intercept of 2m @ 5.21g/t Au
from 102m in hole 25RDRC093, located approximately 20m in front of the existing development,
demonstrates clear scope to extend the mine footprint along strike.
These results, together with historical production of approximately 71,000oz at 38g/t Au, confirm that
Radio remains a highly endowed, under explored high‑grade gold system with substantial potential for
resource growth at depth and along strike.
Next Steps at Radio
On the back of the strong drilling outcomes achieved during the Quarter, WIN has commenced work
programs to:
• Integrate Repeater, Radio Main and Radio South drilling into updated 3D geological and grade
models to support Mineral Resource estimation.
• Define a maiden Mineral Resource at Repeater and Radio South and refine the existing model at
Radio Main to support mine design and scheduling studies.
2
ASX:WIN “Outstanding First Drill Results at Radio Gold Project” Released 5 November 2025
3
ASX:WIN “High Grade Extensional Hits Confirm Growth at Radio Gold Project” Released 2 December 2025
4
ASX:WIN “Repeater Continues to Deliver Shallow High Grade Results” Released 8 December 2025
6
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
• Assess near‑term restart options for underground mining and evaluate low‑cost open pit
opportunities over largely unmined near‑surface mineralisation.
Figure 4: Repeater long section looking north west. Call outs hole ID, x m at xx g/t Au
7
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 5: Repeater drill section A-'A against preliminary optimised pit shell outline looking north east (+/- 5m section
window)
MT EDWARDS NICKEL PROJECT (100% WIN)
No field work was carried out at Mt Edwards during the reporting period. Minor metallurgical testing on
creating PCAM from nickel sulphide concentrates was carried out during the Quarter with results
outstanding as at the end of the Quarter.
FARADAY-TRAINLINE LITHIUM PROJECT (100% WIN)
Metallurgical test work comprising flotation testing of pegmatite aiming to reject iron and concentrate
lithium and rubidium rich feldspars was ongoing during the Quarter. No test results of note were received
during the Quarter
CORPORATE
Funding
As at 31 December 2025, WIN Metals reported a cash balance of $5.934 million. Detailed information
regarding the Company’s cash flows and movements for the Quarter is available in the accompanying
Appendix 5B.
8
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Capital Raising
On 12 December 2025, WIN successfully completed a A$5.5 million capital5
raising through the issue of
new fully paid ordinary shares at 3.5 cents per share, together with one free attaching option for every two
shares issued, subject to shareholder approval. The placement was oversubscribed and strongly
supported by existing and new sophisticated investors.
The attaching options will be exercisable at $0.07 per share with a two-year expiry, with shareholder
approval to be sought at a General Meeting expected to be held on 28 January 2026. GBA Capital acted as
Lead Manager to the placement.
Funds raised will be applied to the second phase of drilling and resource definition activities at the Radio
Gold Project, drilling and evaluation work at the Golden Crown deposit to support future studies at the
Butchers Creek Gold Project, and general working capital to support the Company’s growth strategy.
Annual General Meeting
WIN held its Annual General Meeting on 26 November 2025 will all resolutions put to the meeting passed
on a poll.
Table 2: Corporate information as at 31 December2025
ASX code WIN Board of Directors & Management
Quoted Ordinary shares on issue: 857,091,636 Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue: - Andrew Parker – Independent Non-Executive Chairman
Unlisted Options ($0.036 to $0.35): 229,711,101 Felicity Repacholi - Independent Non-Executive Director
Unlisted Performance Rights 12,353,000 Scott Perry - Independent Non-Executive Director
Share price range last 12 months: $0.013 to $0.068
Share price at end of Quarter: $0.034 Company Secretary - Graeme Scott
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled
$1,553,552 Details of exploration activities undertaken during the Quarter are as described above and in
this section.
ASX Listing Rule 5.3.2: The Company confirms there were nomining production anddevelopment activities
undertaken during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial
percentage interest held in those Tenements at the end of the Quarter is included in the Table at the end
of this as Appendix 1.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter
totalled $159,499. The payments were in respect of salaries and superannuation paid to the executive
director and directors’ fees payable to the non-executive directors.
5
ASX:WIN “WIN Well Funded Towards Gold Production Following Placement” Released 12 December 2025
9
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
About WIN Metals
WIN Metals (ASX: WIN) is a mineral exploration company holding 360km2
of granted tenure in the Southern
Goldfields and Kimberley regions of Western Australia. WIN’s mineral endowment includes gold, nickel
and lithium resources within the Company’s extensive tenure.
The Mt Edwards Nickel and Faraday-Trainline Lithium Projects are situated near Widgiemooltha,
approximately 80km south of the regional centre of Kalgoorlie-Boulder and 30km south of Kambalda. The
Mt Edwards Nickel Project is a collection of eleven (11) nickel deposits with a total mineral resource of
12.7Mt @ 1.43% Ni for 180,900t of contained nickel6
. The Faraday-Trainline Lithium Project has a reported
mineral resource of 1.96Mt at 0.69% Li2O7
.
The Butchers Creek Gold Project is located 30km southeast of Halls Creek in the Kimberley region of
Western Australia. It is a historic gold production centre hosting a global mineral resource of 5.6Mt at
1.98g/t Au for 359,000oz8
of gold. Previous mining operations at Butchers Creek produced 52,000 ounces
of gold between 1995 and 1997.
WIN recently acquired the Radio Gold Project in September 2025, located 8km north of Bullfinch,
approximately 38km northwest of Southern Cross and about 400km east of Perth in the Yilgarn region of
Western Australia. Over its production life, the Radio mine has produced approximately 71,000 ounces at
an exceptionally high grade of 38g/t AuError! Bookmark not defined..
Table 3: WIN Metals Butchers Creek Gold Mineral Resource Estimates
Deposit Last Update Resource Classification Tonnes (Mt) Au g/t Contained Gold (Oz)
Butchers Creek Apr-25
Indicated 3.58 2.24 258,000
Inferred 1.65 1.18 63,000
Golden Crown Jun-21 Inferred 0.40 3.10 38,000
Total Indicated + Inferred 5.63 1.98 359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t Au cut-off below 150m of
surface. Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
Table 4: WIN Metals Mt Edwards Nickel Mineral Resource Estimates
Deposit
Indicated Inferred TOTAL Resources
Tonne (Mt) Nickel (%) Tonne (Mt) Nickel (%) Tonne (Mt) Nickel (%) Nickel Tonnes
Gillett* 2.27 1.35 0.87 1.16 3.14 1.30 40,770
Widgie 3* 0.51 1.34 0.22 1.95 0.73 1.53 11,200
Widgie Townsite* 1.65 1.60 0.85 1.38 2.50 1.53 38,260
Armstrong* 0.95 1.45 0.01 1.04 0.96 1.44 13,820
132N 0.03 2.90 0.43 1.90 0.46 2.00 9,050
Cooke 0.15 1.30 0.15 1.30 2,000
Inco Boundary 0.46 1.20 0.46 1.20 5,590
McEwen 1.13 1.35 1.13 1.35 15,340
McEwen Hangingwall 1.92 1.36 1.92 1.36 26,110
6
ASX:WIN “Sale of non-core assets yield $1.4M for WIN to advance gold Assets” Released 1 July 2025
7
ASX:WIN “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
8
ASX:WIN “WIN advances Butchers Creek towards development following resource update” Released 16 April 2025
10
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Deposit
Indicated Inferred TOTAL Resources
Tonne (Mt) Nickel (%) Tonne (Mt) Nickel (%) Tonne (Mt) Nickel (%) Nickel Tonnes
Mt Edwards 26N 0.87 1.43 0.87 1.43 12,400
Zabel 0.27 1.94 0.05 2.04 0.33 1.96 6,360
TOTAL 5.68 1.48 6.97 1.39 12.66 1.43 180,900
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni cut- off. Tonnes and
grade have been rounded to reflect the relative uncertainty of the estimates.
Table 5: WIN Metals Mt Edwards Lithium Mineral Resource Estimates
Deposit
Measured Indicated Inferred TOTAL Resources
Tonne (kt) Li2O (%) Tonne (kt) Li2O (%) Tonne (kt) Li2O (%) Tonne (kt) Li2O (%) Li2O Tonnes
Faraday 550 0.75 250 0.66 220 0.61 1,020 0.7 7,100
Trainline - - 780 0.69 160 0.63 940 0.68 6,300
TOTAL 550 0.75 1,020 0.68 390 0.62 1,960 0.69 13,500
Reported above a cut-off grade of 0.30% Li2O to a depth of 310mRL (65m below surface) and 0.50% Li2O below 310mRL to 250mRL. Tonnes and
grade have been rounded to reflect the relative uncertainty of the estimates.
Figure 6: WIN’s Gold, Nickel and Lithium Project Locations
11
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Competent Person Statement – WIN Metals
The information in this announcement that relates to mineral resource estimates and exploration results
is based on information reviewed, collated and fairly represented by Mr William Stewart, who is a full-time
employee of WIN Metals Ltd. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member
no 224335). Mr Stewart has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Stewart consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears. Additionally, Mr Stewart confirms that the entity is not aware of any new information or
data that materially affects the information contained in the ASX releases referred to in this report.
Forward Looking Statements
This announcement contains forward-looking statements which represent expectations, intentions, or
projections about future events and performance. These statements are subject to known and unknown
risks, uncertainties, and assumptions, many of which are outside the control of WIN Metals Ltd and its
directors or management. Words such as 'may', 'could', 'believes', 'estimates', 'targets', 'expects', and
'intends', and similar expressions, are intended to identify such forward-looking statements.
Such statements are not guarantees of future results and are based on current economic, regulatory, and
operating conditions as well as assumptions regarding future events which are, at the date of this
announcement, believed to be reasonable. Actual results and developments may differ materially from
those expressed or implied in these statements. Accordingly, undue reliance should not be placed on any
forward-looking statements. Except as required by law or the ASX Listing Rules, WIN Metals Ltd does not
undertake any obligation to update or revise forward-looking statements to reflect any changes in
circumstances or events that occur after the date of this announcement.
Summary Information
This announcement has been prepared by WIN and includes information regarding WIN’s disclosure of
results to the ASX.
This announcement should also be read in conjunction with WIN’s other periodic and continuous
disclosure announcements lodged with the ASX, which are available at www.asx.com.au and available on
WIN’s website at www.winmetals.com.au.
Table 6: Reference documents included in this announcement
Number Announcement Date ASX Company Announcement Title
1 12-Nov-25 WIN Butchers Creek Gold Project Delivers Robust Scoping Study
2 5-Nov-25 WIN Outstanding First Drill Results at Radio Gold Project
3 2-Dec-25 WIN High-Grade Extensional Hits Confirm Growth at Radio Gold Project
4 8-Dec-25 WIN Repeater Continues to Deliver Shallow High Grade Results
5 12-Dec-25 WIN WIN Well Funded Towards Gold Production Following Placement
6 1-Jul-25 WIN Sale of non-core assets yield $1.4M for WIN to advance gold Assets
7 8-Nov-23 WIN 375% Growth in Faraday-Trainline Lithium Mineral Resource
8 16-Apr-25 WIN WIN advances Butchers Creek towards development following resource update
12
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Compliance Statement
TheCompany confirms it is notaware of anynewinformation or data thatmaterially affects the information
included in the original market announcement(s), and in the case of estimates of Mineral Resources that
all material assumptions and technical parameters underpinning the estimates in the relevant
announcement continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified
from the original announcement.
Approved by: The Board of Directors
-ENDS-
For further details please contact:
Steve Norregaard
Managing Director
WIN Metals Ltd
steve@winmetals.com.au
0472 621 529
13
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Appendix 1 – Tenement Interests
The changes in the Company’s tenement interests during the Quarter and as at 31 December 2025 are as
reflected in the table below. The Company has an interest in the following projects and tenements in Western
Australia:
Project Name Licence Name Beneficial Interest Status
Radio M77/0633 100% Live
Radio P77/4492 100% Live
Radio L77/0081 100% Live
Radio L77/03731
100% Pending
Butchers Creek E80/6085 100% Pending
Butchers Creek E80/6086 100% Pending
Butchers Creek E80/4856 100% Live
Butchers Creek E80/4874 100% Live
Butchers Creek M80/0655 100% Pending
Butchers Creek E80/4976 100% Live
Butchers Creek M80/0656 100% Pending
Butchers Creek E80/5059 100% Live
Butchers Creek E80/5584 100% Live
Butchers Creek E80/5660 100% Pending
Butchers Creek M80/0106 97% Live
Butchers Creek M80/0315 97% Live
Butchers Creek M80/0418 100% Live
Butchers Creek M80/0651 100% Pending
Butchers Creek P80/1839 Surrendered Converted M80/0651
Butchers Creek P80/1854 100% Live
Butchers Creek M80/0653 100% Pending
Butchers Creek P80/1855 100% Live
Butchers Creek M80/0654 100% Pending
Butchers Creek P80/1884 100% Pending
Butchers Creek E80/6171 100% Pending
Butchers Creek M80/06591
100% Pending
Butchers Creek M80/06601
100% Pending
Mt Edwards M15/87 100% (*) Live
Mt Edwards M15/699 100% (#) Live
Mt Edwards P15/6362 100% (#) Live
Mt Edwards P15/6387 100% (#) Live
Mt Edwards P15/6539 100% (#) Pending
Mt Edwards E15/1749 100% (#) Live
Mt Edwards P15/6570 100% (#) Live
Mt Edwards P15/6612 100% Live
Mt Edwards L15/0426 100% Pending
Mt Edwards M15/45 100% (^) Live
Mt Edwards M15/46 100% (^) Live
Mt Edwards M15/48 100% (^) Live
Mt Edwards M15/74 100% (#) Live
Mt Edwards M15/75 100% (#) Live
Mt Edwards M15/77 100% (^) Live
Mt Edwards M15/78 100% (^) Live
Mt Edwards M15/79 100% (^) Live
Mt Edwards M15/80 100% (^) Live
Mt Edwards M15/94 100% (^) Live
Mt Edwards M15/96 100% (#) Live
Mt Edwards M15/97 100% (#) Live
Mt Edwards M15/99 100% (#) Live
14
December 2025 Quarterly Report
27 January 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Project Name Licence Name Beneficial Interest Status
Mt Edwards M15/100 100% (#) Live
Mt Edwards M15/101 100% (#) Live
Mt Edwards M15/102 100% (#) Live
Mt Edwards M15/103 100% (^) Live
Mt Edwards M15/105 100% (^) Live
Mt Edwards L15/102 100% Live
Mt Edwards M15/478 100% (^) Live
Mt Edwards M15/633 100% (^) Live
Mt Edwards M15/653 100% (#) Live
Mt Edwards M15/693 100% (^) Live
Mt Edwards M15/698 100% (#) Live
Mt Edwards M15/1271 100% (#) Live
Mt Edwards L15/254 100% Live
Mt Edwards E15/989 100% (^) Live
Mt Edwards L15/280 100% Live
Mt Edwards E15/1505 100% Live
Mt Edwards E15/1507 100% Live
Mt Edwards E15/1576 100% (#) Live
Mt Edwards E15/1583 100% (#) Live
Mt Edwards P15/6092 Surrendered -
Mt Edwards E15/1553 100% (#) Live
Mt Edwards L15/0478 100% Live
* Lithium Mineral rights only, ^Nickel Mineral rights only,#
No gold interest,1
New tenement applications made during the Quarter.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 15
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
WIN METALS LTD
ABN Quarter ended (“current quarter”)
77 648 687 094 31 DECEMBER 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs – net of project allocations (147) (370)
(e) administration and corporate costs (303) (472)
1.3 Dividends received (see note 3) - -
1.4 Interest received 12 23
1.5 Interest and other costs of finance paid - (1)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives –
R&D Tax incentive
- -
1.8 Other (provide details if material) (2) 80
1.9 Net cash from / (used in) operating
activities
(440) (740)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - (50)
(c) property, plant and equipment (12) (463)
(d) exploration & evaluation (1,554) (3,015)
(e) investments - -
(f) other non-current assets –
Bonds/security deposits
(2) (4)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 16
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements 500 500
(c) property, plant and equipment 5 5
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(1,063) (3,027)
3. Cash flows from financing activities
5,526 7,876
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options 17 20
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(359) (526)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings (4) (10)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
5,180 7,360
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
2,257 2,341
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(440) (740)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,063) (3,027)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
5,180 7,360
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 17
+ See chapter 19 of the ASX Listing Rule
Share your feedback
Discover