Munda Agreement with Auric Mining Ltd yields $1.2m (Updated)
Released
Released
Announcement PDF
ASX Announcement
ASX:WIN
23 July 2024
Munda Agreement with Auric Mining Ltd yields
$1.2m+ for WIN (Updated)
Re-release including Competent Person and Compliance Statement
Highlights
•
Key aspects comprising the transaction with Auric Mining Ltd (Auric) include:
o
Divestment of Nickel and Lithium rights to 150m below surface 1 over a portion of M15/87 to Auric
Mining Ltd. Divesting 127,000t at 1.69% Ni resource for 2,140t of contained nickel metal 2.
o
Transfer of non-core tenure including P15/5905 & P15/5906, MLA15/1889, P15/6408, ELA15/1864,
ELA15/1929 and ELA 15/1665.
o
Provides access to in-pit water for mining operations.
•
Transaction nets a minimum $1.2m to WIN over the next 12 months.
•
Consideration payable by Auric to WIN Metals as follows:
o
$100,000 deposit paid
o
$600,000 to be paid at settlement
o
$300,000 to be paid 1 December 2024
o
$200,000 to be paid 1 June 2025
o
Ongoing access fees for water usage
Win Metals Managing Director and CEO, Mr Steve Norregaard, commented:
"Our Munda nickel resource doesn’t feature in the short to medium term horizon for development as part of
our larger Mt Edwards Project. The nickel resource lies predominantly below the level divested in favour of our
gold rights partner Auric. This deal achieves key objectives for both parties in realising value for WIN in the
short term and divesting ourselves of some lower value or non-key tenements whilst providing Auric a clear
runway for the proposed development of its Munda Gold Project. A win-win for both parties.
“We have done a logical deal whilst retaining access to the greater proportion of the nickel mineralisation and
depth extensions which exist below the -150mRL from surface exclusion zone and retain our 100% interests
in nickel and lithium over greater than 50% of the mining tenement in question. A clear and sensible deal to
allow both co-tenants to carry on with their respective businesses minimising interference/interplay.
“Preserving the value of our nickel project remains foremost in our plans, however, in the case of Munda, the
remaining resource will, as a result of this transaction, ultimately be able to be accessed at a much lower
capital cost and be available for exploitation in a timeframe that more fits an anticipated appreciation of the
underlying commodity value and our longer-term view for project development.”
1
Munda topographic surface nominally 385mRL
2
2019 Munda nickel MRE Neometals ASX announcement “Additional Nickel Resources at Mt Edwards” 13 November 2019. Reported at
1% cut-off above 235mRL
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
1
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Auric Mining Managing Director, Mr Mark English, commented:
“We now have greater control over our destiny for open pit gold mining at the Munda Gold Project.
“Buying the nickel and lithium rights from WIN Metals down to the 235m RL (which is approximately 150m
below surface) and having sole rights to an agreed area means we have now taken another major step forward
to commencing a trial pit at Munda.
“There’s not much water around Widgiemooltha, so as part of this transaction we are acquiring access to
stored water in the 132 North pit from WIN, removing a significant obstacle for us.
“WIN Metals has been pragmatic about the negotiation. We have reached a highly satisfactory agreement for
Auric shareholders.
“We’ve moved Munda along rapidly this year and this hurdle has been removed. We are planning to mine a
trial pit in Q1 2025.”
Figure 1 Munda Project - Mineral Rights Boundaries (MGA94_51S)
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) and Auric Mining Ltd (ASX: AWJ) are pleased to
announce that the two parties have successfully executed a Binding Term Sheet on 22 July 2024 for the partial
sale of WIN’s nickel, lithium and other associated metals rights to a depth in relation to an excised area within
M15/87, referred to as Munda. M15/87 is a small mining tenement comprising part of WIN’s broader Mt
Edwards Project.
For the nickel rights component the price agreed was $1.0 Million with a total initial transaction value under
the Binding Term Sheet of $1.2 million.
WIN has divested its nickel and lithium rights down to 235mRL or 150m in depth, being Auric’s Rights Area, on
tenement M15/87, a granted mining lease which contains Auric’s Munda Gold Project and WIN’s Munda nickel
resource (Figure 1). WIN retains rights within the Auric Rights Area after a period of 8 years to access the
Company’s nickel resources below 235mRL via access from the proposed open pit Auric is planning to
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
2
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
excavate. In the event that mining of the open pit is continuing at this point, WIN reserves the right to access
and co-operate within the open pit confines at that time, thus not impinging on WIN’s proposed plans for its
nickel development.
WIN has allowed access rights for Auric to source water from mining lease M15/101 132N Open Pit on an
exclusive basis for 3 years, thereafter until the expiration of 8 years on a non-exclusive basis, with WIN
reserving rights to access water from the same source for any proposed works associated with its FaradayTrainline lithium development. Auric will pay an ongoing access fee based on water consumption of $1.50 per
cubic metre for water access to WIN during the 8-year term of the agreement.
As part of the deal WIN has divested a series of exploration and prospecting tenements and associated
applications, thereby rationalising the Company’s tenure in the Widgiemooltha Dome region for $25,000 plus
other fixed assets totalling $45,000.
WIN has received a non-refundable deposit of $100,000 as at signing of the Binding Term Sheet.
At settlement of the transaction, targeted on or before 29 July 2024, Auric will pay WIN a further $600,000, with
additional payments of $300,000 on 1 December 2024 and $200,000 on 1 June 2025.
Table 1: Acquisition costs in AWJ/WIN Binding Term Sheet (ex GST)
Nickel rights
$1,000,000
Lithium rights
$30,000
Other tenements
$25,000
Fixed assets
$45,000
Water access rights
$100,000
$1,200,000
TOTAL
The Munda Agreement splits the current Munda MRE2 above and below 235mRL. as is quantified in Table 2
below.
Table 2: Munda Nickel Mineral Resource Split by Rights Holder
Deposit
Munda
Rights Holder
Auric Mining
WIN Metals
Total Resource
Reference
Level
+235mRL
-235mRL
Inferred Resources
Tonne (kt)
Nickel (%)
127
381
508
1.69
1.91
1.85
Nickel
Tonnes
2,140
7,260
9,400
Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
WIN Metals Total Nickel Mineral Resource inventory now stands at 13.04Mt at 1.45% Ni for 188,160t of
Nickel as shown in Table 3 below.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
3
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Table 3: WIN Metals Total Nickel Mineral Resources
Indicated
Deposit
Inferred
TOTAL Resources
Tonne
(kt)
Nickel
(%)
Tonne
(kt)
Nickel (%)
Tonne
(kt)
Nickel
(%)
Nickel
Tonnes
Gillett*
2,267
1.35
871
1.16
3,138
1.30
40,770
Widgie 3*
512
1.34
222
1.95
734
1.53
11,200
Widgie Townsite*
1,649
1.60
853
1.38
2,502
1.53
38,260
Armstrong*
959
1.45
10
1.04
959
1.44
13,820
132N
34
2.90
426
1.90
460
2.00
9,050
Munda
381
1.91
381
1.91
7,260
Cooke
154
1.30
154
1.30
2,000
Inco Boundary
464
1.20
464
1.20
5,590
McEwen
1,133
1.35
1,133
1.35
15,340
McEwen Hangingwall
1,916
1.36
1,916
1.36
26,110
Mt Edwards 26N
871
1.43
871
1.43
12,400
Zabel
TOTAL
272
1.94
53
2.04
325
1.96
6,360
5,693
1.48
7,355
1.42
13,038
1.45
188,160
All Resources have previously 3 been reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which
are reported at 0.7% Ni cut-off. Munda Mineral Resource has been reported below 235mRL to reflect WIN’s
proportionate ownership following the divestment.
Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
Competent Persons Statement
The information in this report that relates to the Mineral Resource Reporting of the Munda nickel deposit in Table 2 of
this announcement is based on and fairly represents information and supporting documentation compiled by Mr
William Stewart, who is a full-time employee of WIN Metals Ltd. Mr Stewart is a member of the Australian Institute of
Metallurgy and Mining (member no 224335). Mr Stewart has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Stewart consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Compliance Statement
The Company confirms it is not aware of any new information or data that materially affects the information included
in the original market announcement(s), and in the case of estimates of Mineral Resources that all material
assumptions and technical parameters underpinning the estimates in the relevant announcement continue to apply
and have not materially changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original announcement.
3
2024 Widgie Townsite MRE Widgie Nickel ASX announcement “Widgie Townsite Mineral Resource Update” 29 January 2024.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
4
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Forward Looking Statements
This announcement includes forward-looking statements that are only predictions and are subject to known
and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the
control of WIN Metals Ltd, the directors and the Company’s management. Such forward-looking statements
are not guarantees of future performance.
Examples of forward-looking statements used in this announcement include use of the words ‘may’, ‘could’,
‘believes’, ’estimates’, ‘targets’, ’expects’, or ‘intend’ and other similar words that involve risks and
uncertainties. These statements are based on an assessment of present economic and operating conditions,
and on a number of assumptions regarding future events and actions that, as at the date of announcement,
are expected to take place.
Actual values, results, interpretations or events may be materially different to those expressed or implied in
this announcement. Given these uncertainties, recipients are cautioned not to place reliance on forwardlooking statements in the announcement as they speak only at the date of issue of this announcement.
Subject to any continuing obligations under applicable law and the ASX Listing Rules, WIN Metals Ltd does
not undertake any obligation to update or revise any information or any of the forward-looking statements in
this announcement or any changes in events, conditions or circumstances on which any such forward-looking
statement is based.
Approved by: The Board of Directors
-ENDS-
For further details please contact:
Steve Norregaard
Media Enquiries
Managing Director
Fiona Marshall
WIN Metals
White Noise Communications
steve@winmetals.com.au
fiona@whitenoisecomms.com
0472 621 529
0400 512 109
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
5
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
About WIN Metals
WIN Metals (ASX: WIN) is a mineral exploration company holding 240km2 of granted mining tenure across the
highly prolific Widgiemooltha Dome with exposure to the critical metals nickel and lithium.
The Company is developing its Mt Edwards Nickel Project which is a unique collection of twelve (12) deposits
with a total Mineral Resource Estimate of 13.04 Mt @ 1.45% Ni for 188,160t.
WIN Metals also holds the Faraday-Trainline Lithium Project, a shovel ready Project with a Mineral Resource
Estimate of 1.96 Mt at 0.69% Li2O*. The deposit shows substantial expansion potential with mineralisation
open at depth with potential for repeat stacked pegmatites.
The Company’s tenure is located just 80km south of the major regional centre of Kalgoorlie in Western
Australia, 30km south-west of Kambalda.
*The information that relates to the JORC Mineral Resource Estimates for Mt Edwards Nickel Project and Faraday-Trainline Lithium
Deposit is extracted from the Company’s ASX Announcements: 29 January 2024 and 8 November 2023 which are available to view on
the Company’s website: www.winmetals.com.au
WIN Metals Project Map
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
6
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling
Not applicable as no new data
is being reported.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g., ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases,
more explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g., submarine nodules) may
warrant disclosure of detailed information.
Drilling
Techniques
Drill type (e.g., core, reverse circulation, open- hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g., core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Not applicable as no new data
is being reported.
Drill
Sample
Recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Not applicable as no new data
is being reported.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Not applicable as no new data
is being reported.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
7
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 1 Sampling Techniques and Data
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
If core, whether cut or sawn and whether quarter, half or
all core taken.
Not applicable as no new data
is being reported.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Not applicable as no new data
is being reported.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
Nature of quality control procedures adopted (e.g.,
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
Verification
of sampling
and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
Not applicable as no new data
is being reported.
The use of twinned holes
The verification of significant intersections by either
independent or alternative company personnel.
Discuss any adjustment to assay data
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
8
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 1 Sampling Techniques and Data
Location of
data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Not applicable as no new data
is being reported.
Specification of the grid system used
Quality and adequacy of topographic control
Data
spacing and
distribution
Data spacing for reporting of Exploration Results
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Not applicable as no new data
is being reported.
Whether sample compositing has been applied
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
Not applicable as no new data
is being reported.
Sample
security
The measures taken to ensure sample security
Not applicable as no new data
is being reported.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
Not applicable as no new data
is being reported.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
9
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 2 Reporting of Exploration Results
Criteria
JORC Code Explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
Munda Deposit is located on M15/87
which is held by Widgie Gold Pty Ltd, a
wholly owned subsidiary of Auric
Mining. Auric Mining holds all mineral
rights except for nickel and lithium
outside the Auric Rights Area as
illustrated in figure 1 in the body of the
announcement held by Mt Edwards
Critical Metals (WIN Metals).
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
As set out in the body of the
announcement Auric Mining will
assume all mineral rights within the
Auric Rights Area at Munda from
surface to a vertical depth of 150m,
above 235mRL. WIN Metals retains
Nickel and Lithium rights below a
vertical depth of 150m of surface,
below 235mRL within the Auric Rights
Area. Rights holder conditions are set
out within the body of the
announcement.
There are no known impediments to
mining in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
Early exploration (1967-1995) focused
on nickel.
WMC (1996-1998) recognised gold
potential and drilled for both nickel and
gold including 81 diamond and RC
holes in the current resource area.
Resolute (1999-2000) optioned the
project from WMC, drilled 37 holes and
excavated a small trial mine with ore
carted to the Chalice gold plant.
Titan Resources (2005-2006),
Consolidated Nickel (2006-2007),
Eureka Mines (2016) and Estrella
Resources (2019) all undertook drilling
programmes focused on the current
Mineral Resource area.
Widgie Nickel carried infill drilling from
2021 to 2023 to increase the level of
geological confidence of the Munda
Nickel Resource.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
10
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 2 Reporting of Exploration Results
Geology
Deposit type, geological setting and style of
mineralisation.
The geology at Munda consists of a
mafic‐ultramafic belt bound to the west
by metasediments and to the east by
granites.
The nickel sulphide mineralisation at
the Munda deposit is predominantly
associated with the basal contact of a
komatiitic ultramafic (Widgiemooltha
Komatiite) with the underlying Mt
Edwards Basalt. The mineralisation is
found within embayments in the
komatiite‐basalt contact interpreted to
be thermal erosion channels caused by
the flow of hot ultramafic lava. Sheet
flow facies zones flanking and
gradational to channel facies are
thinner, texturally and chemically well‐
differentiated and less magnesian than
channel flow facies.
Depth of complete oxidation varies
from 5 to 80 metres below the natural
surface but is typically around 30m
metres in depth.
Drill hole
information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
Not applicable as no new data is being
reported.
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
11
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 2 Reporting of Exploration Results
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g., cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Not applicable as no new data is being
reported.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results
Not applicable as no new data is being
reported.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Not applicable as no new data is being
reported.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
Not applicable as no new data is being
reported
Other
substantive
exploration
data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
– size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics potential deleterious or
contaminating substances.
Not applicable as no new data is being
reported
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g., ‘down hole length, true width not
known’).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
12
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 2 Reporting of Exploration Results
Further work
The nature and scale of planned further work (e.g.,
tests for lateral extensions or large scale step out
drilling.
Additional drill will be required to
further define the gold and mineral
resources.
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
There is the potential of trail mining pit
being excavated by Auric Mining for
gold. Who will evaluate the economic
viability of larger open pit mining
operation.
Section 3 Estimation and Reporting of Mineral Resources
Criteria
JORC Code explanation
Commentary
Database
integrity
Measures taken to ensure that data has not been
corrupted by, for example, transcription or keying
errors, between its initial collection and its use for
Mineral Resource estimation purposes.
Not applicable as previously
reported.
Data validation procedures used.
Site visits
Comment on any site visits undertaken by the
Competent Person and the outcome of those visits.
Not applicable as previously
reported.
If no site visits have been undertaken indicate why
this is the case.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the
geological interpretation of the mineral deposit.
Not applicable as previously
reported.
Nature of the data used and of any assumptions
made.
The effect, if any, of alternative interpretations on
Mineral Resource estimation.
The use of geology in guiding and controlling Mineral
Resource estimation.
The factors affecting continuity both of grade and
geology.
Dimensions
The extent and variability of the Mineral Resource
expressed as length (along strike or otherwise), plan
width, and depth below surface to the upper and
lower limits of the Mineral Resource.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
Not applicable as previously
reported.
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
13
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
23 July 2024
Section 3 Estimation and Reporting of Mineral Resources
Estimation and
modelling
techniques
The nature and appropriateness of the estimation
technique(s) applied and key assumptions, including
treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of
extrapolation from data points. If a computer assisted
estimation method was chosen include a description
of computer software and parameters used.
Not applicable as previously
reported.
Description of how the geological interpretation was
used to control the resource estimates.
Discussion of basis for using or not using grade
cutting or capping.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate takes
appropriate account of such data.
The assump
Share your feedback
Discover