June 2024 Quarterly Report
Highlights
•
WIN Metals Ltd changed its name from Widgie Nickel Limited effective from 1 July 2024 1, the name change
reflects the Company’s multi commodity portfolio and its focus on critical metals.
•
The Company confirmed receipt of a $1.17m Research and Development (R&D) Tax Incentive refund in relation
to the 2022/2023 financial year.
•
A pro-rata non-renounceable entitlement offer was announced on 16 April 2024 (Offer), the Company received
applications under the Offer for 21,194,774 Shares at the issue price of $0.04 per Share (New Shares) raising
gross proceeds of $847,791 2 3.
•
Post Quarter end announcement of partial divestment of its Munda (M15/0087) tenement interests and other
peripheral tenements and assets for an initial $1.2m 4.
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to present its Quarterly Activities Report for the
period ended 30 June 2024.
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
"It has been a busy quarter on the corporate front for WIN, and we thank our shareholders for their support of our
entitlement offer completed during the period.
“Our discussions with potential off-takers are ongoing, following a number of promising meetings in Europe where
WIN participated in a delegation of Australian critical metals companies, marketing the investment case for this
select group of critical minerals explorers and developers to European off-takers, investors and OEMs.
“As reported in the Entitlement Offer Prospectus, we continue to look for diversified assets to unlock value for our
shareholders with due diligence on alternatives progressing. We look forward to bringing news to market as this
unfolds.”
Mt Edwards Nickel Project
WIN controls a dominant ~240 km2 land package over the prolific nickel-producing Widgiemooltha Dome in
Western Australia. The Mt Edwards Nickel Project is positioned adjacent to key infrastructure, located just 80km
south of the major regional centre of Kalgoorlie, 30km south-west of Kambalda and along strike to the north from
Wyloo’s Cassini Nickel mine (Figure 1).
The Mt Edwards Nickel Project is comprised of 12 separate deposits with a total Mineral Resource Estimate of
13.04Mt grading 1.45% nickel for 188,160 tonnes (following completion of the Munda tenement divestment
transaction referred to above).
In early March 2024, the Company released a Scoping Study on the Mt Edwards Nickel Project 5. WIN commissioned
the Scoping Study for the purpose of carrying out a preliminary assessment of the technical and financial viability
ASX Announcement 3 July 2024 – Change of Company Name
ASX Announcement 16 April 2024 – Non-Renounceable Rights Issue to Raise up to $4m
3
ASX Announcement 15 May 2024 – Results of Rights Issue and Shortfall Notice
4
ASX Announcement 23 July 2024 – Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN
5
ASX Announcement 7 March 2024 – Standalone Mt Edwards Project Scoping Study
1
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
1
June 2024 Quarterly Report
31 July 2024
of a standalone nickel mining and processing operation. A successful outcome justifying ongoing development of
the project.
No exploration activities at the Mt Edwards Nickel Project were reported during the June Quarter. Fieldwork was
limited to rehabilitation of surface disturbance, the result of drilling activities over the previous 18 months.
A key outcome from the March Scoping Study was identifying the opportunity to add further value to the project by
mitigating “post mine gate costs” such as concentrate penalties and transport costs, which for the Mt Edwards
project were significant. In doing this the Company will materially improve costs and the “payability” of the primary
output, nickel improving the underlying project viability.
The opportunity to process nickel concentrates onsite to initially produce nickel sulphate and thereafter to make
battery precurser or pCAM fits ideally with planned giga factory inputs in Europe. pCAM (NCM) is the primary battery
cathode material of choice for the European car industry (comprising nickel, cobalt and manganese) and as such
represents a real opportunity for WIN to partner with a downstream giga factory participant or OEM keen to secure
a low carbon, ethically sourced and verifiable electric battery component.
To this end the Company has engaged leading metallurgical laboratory and process engineering firm Simulus
Engineers to carry out POX (Pressure Oxidisation testwork) on nickel concentrates produced from ongoing flotation
testwork to determine key operating cost and capital cost data with a view to demonstrating the viability of the Mt
Edwards project to support the fully integrated mine, concentrator/POX/pCAM concept. Testing has been
scheduled to commence in early August with analysis and reporting to a scoping study level standard to match the
March 2024 Scoping Report to follow. Key outcomes will be concluded in the December 2024 quarter.
Planning for subsequent levels of feasibility was advanced with activity to be governed by prevailing commodity and
capital market sentiment which have unfortunately deteriorated markedly during the previous three quarters.
Of note, the decision by BHP to pause production from all Nickel West operations until a review in early 2027,
announced on the 11th of July 6 post the end of the Quarter is seen as indicative of the current industry dynamics,
demonstrating a need for a change in approach to combat the structural changes implemented in competing
markets, notably Indonesia.
WIN is exploring opportunities to leverage off dormant infrastructure resulting from this BHP closure that may
represent a capital or operating saving to our proposed project.
Australian Trade and Investment Commission (Austrade) European Delegation
In early June WIN Metals was welcomed by the Australian Trade and Investment Commission (Austrade) as part of
the delegation of Australian Critical Minerals project proponents to the UK, France and Germany.
The meetings provided a forum to receive first hand insights into the European EV evolution, the players, the
government views, the rate of uptake and the opportunities for WIN Metals within mainstream Europe.
The opportunity to meet in person with key industry participants was invaluable with key takeaways from meetings
held in London, Paris and Berlin being:
•
•
•
•
•
•
6
Electric vehicle (EV) costs are a key impediment to the rate of uptake in Europe and North America.
A substantial component of the cost of an EV is the battery (25-35%).
Batteries are currently sourced exclusively from Asia with little visibility in cost, origin of components and
ESG credentials.
The EU are introducing compulsory battery passport verification of country of origin of all components
within the next 1-2 years.
EU countries are pushing ahead with internal battery making capacity to achieve visibility in cost and
ratifying battery ESG and environmental credentials.
EU/US/Australia have free trade agreements and strong unilateral governmental support for establishing a
fully integrated battery industry.
BHP ASX Announcement 11 July 2024 - Western Australia Nickel to temporarily suspend operations
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
2
June 2024 Quarterly Report
31 July 2024
•
•
Australia is seen as an excellent business partner, by all, given our abundance of natural resources and
strong ESG and environmental credentials.
To be a viable business partner cost competitiveness remains a key requirement for participation in the
European battery supply chain.
Members of the delegation - WIN Managing Director, Steve Norregaard (centre).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
3
June 2024 Quarterly Report
31 July 2024
Figure 1: Location map of Mt Edwards Nickel Project
* All Resource stated at 1% Ni lower cut, other than Armstrong, Widgie Townsite, Widgie 3 and Gillett at 0.7% Ni lower cut
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
4
June 2024 Quarterly Report
31 July 2024
Table 1: WIN Metals Total Nickel Mineral Resources
Indicated
Deposit
Inferred
TOTAL Resources
Tonnes
Nickel
Tonnes
Nickel
Tonnes
Nickel
Nickel
(kt)
(%)
(kt)
(%)
(kt)
(%)
(t)
Widgie Townsite
Widgie 3
1,649
512
1.60
1.34
853
222
1.38
1.95
2,502
734
1.53
1.53
38,260
11,200
Gillett
Armstrong
2,267
949
1.35
1.45
871
10
1.16
1.04
3,138
959
1.30
1.44
40,770
13,820
34
2.90
426
381
154
464
1.90
1.91
1.30
1.20
460
381
154
464
2.00
1.91
1.30
1.20
9,050
7,260
2,000
5,590
McEwen
McEwen Hangingwall
1,133
1,916
1.35
1.36
1,133
1,916
1.35
1.36
15,340
26,110
Mt Edwards 26N
Zabel
272
1.94
871
53
1.43
2.04
871
325
1.43
1.96
12,400
6,360
TOTAL
5,683
1.48
7,355
1.42
13,038
1.45
188,160
132N
Munda-*
Cooke
Inco Boundary
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni
cut- off. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates. * Munda Mineral Resource
has been reported below 235mRL to reflect WIN’s proportionate ownership following the divestment.
Faraday-Trainline Lithium Project
The Faraday-Trainline Lithium Project is located in the “Lithium Corridor” between Mt Marion to the north and
Pioneer Dome to the south in Widgiemooltha, Western Australia. The project hosts the Faraday-Trainline Lithium
Deposit as well as four additional prospects in Farson, Atomic 3, Voyager and Gemini.
In November 2023, the Faraday-Trainline lithium Mineral Resource Estimate (MRE) was upgraded to 1.96Mt @
0.69% Li2O (0.30% Li2O cut-off) including a high-grade, near surface zone of 373kt @ 1.00% Li2O (0.85% Li2O cutoff) 7, with a Measured and Indicated Mineral Resources total of 1.57Mt @ 0.71% Li2O.
No exploration activities at the Faraday-Trainline Lithium Project were reported during the June Quarter.
Metallurgical testwork remains ongoing to confirm overall metallurgical recoveries across the entire resource.
Given the deterioration in the underlying commodity price, testwork outcomes have been modified to consider
potential byproduct recoveries and to gain an understanding of the value that may accrue to these byproducts.
Market research currently being carried out will be taken into consideration in ongoing work.
Nickel and Lithium expenditure/activities have slowed, in essence, to match minimum expenditure commitments
on WIN’s tenure.
7
ASX Announcement 8 November 2024 – 375% Growth in Faraday-Trainline Lithium Mineral Resource
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
5
June 2024 Quarterly Report
31 July 2024
Figure 2: WIN Metals lithium deposits and surrounding lithium prospects
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
6
June 2024 Quarterly Report
31 July 2024
Corporate
As at 30 June 2024, WIN held $1.69m cash at bank. Full details regarding the Company’s cash movements during
the Quarter can be found in the attached Appendix 5B.
Subsequent to the end of the Quarter the Company has entered into a transaction with Auric Mining Ltd for the
partial divestment of its Munda (M15/0087) tenement interests and other peripheral tenements and assets for an
initial $1.20m (refer ASX announcement on 23 July 2024). Deposits totalling $100,000 have been received, with a
$600,000 payment due on settlement and the remaining balance payable in two tranches being $300,000 payable
on 1 December 2024 and $200,000 payable on 1 June 2025.
During the Quarter the Company received $1.17 million for its Research and Development (R&D) Tax Incentive
refund related to the 2022/2023 financial year.
On 16 April 2024, WIN announced its intention to launch a Rights Issue to raise up to $4 million2. The Offer was for
1 fully paid ordinary share in the capital of the Company (Share) for every 2.9795 Shares held by eligible
shareholders registered at the record date, together with 1 free attaching unlisted option (New Option) for every 2
Shares subscribed for and issued, exercisable at $0.07 each on or before 31 October 2025.
The Company received applications under the Offer for 21,194,774 Shares at the issue price of $0.04 per Share
(New Shares) raising gross proceeds of $847,7913.
The Company also issued 10,597,504 New Options.
The Shortfall Offer is a separate offer made pursuant to the prospectus dated 18 April 2024 (Prospectus) 8 and may
remain open for up to three months following the closing date of the Rights Issue (Shortfall Offer). The issue price
for each Share to be issued under the Shortfall Offer is at the same price at which New Shares have been offered
under the Offer. Successful applicants under the Shortfall Offer will also be entitled to New Options on the same
terms as under the Offer.
Effective from 1 July 2024 Widgie Nickel Limited changed its name to WIN Metals Ltd following approval at the
General Meeting of Shareholders held the same day1.
Corporate information as at 30 June 2024:
ASX code
WIN
Board of Directors & Management
Quoted Ordinary shares on issue:
319,156,043
Restricted Ordinary shares on issue:
-
Andrew Parker – Independent Non-Executive Chairman
Unlisted Options ($0.04 to $0.40):
30,904,080
Felicity Repacholi - Independent Non-Executive Director
Unlisted Performance Rights
1,649,000
Scott Perry - Independent Non-Executive Director
Share price range last 12 months:
Steve Norregaard – Managing Director & CEO
$0.021 to $0.244
Share price at end of Quarter:
$0.023
Company Secretary:
Market cap (at $0.023):
$7.34m
Graeme Scott
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled $719,848
Details of exploration activities undertaken during the Quarter are as described above and in this section.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development activities
undertaken during the Quarter.
8
ASX Announcement 18 April 2024 – Rights Issue Prospectus
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
7
June 2024 Quarterly Report
31 July 2024
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial percentage
interest held in those Tenements at the end of the Quarter is included in the Table at the end of this as Appendix 1.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter totalled
$147,500. The payments were in respect of salaries and superannuation paid to the executive director and
directors’ fees payable to the non-executive directors.
Approved by: Board of WIN Metals Ltd
-ENDSFor further details please contact:
Media Enquiries:
Steve Norregaard
Fiona Marshall
Managing Director
White Noise Communications
WIN Metals
fiona@whitenoisecomms.com
steve@winmetals.com.au
0400 512 109
0472 621 529
Competent Person Statement
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation compiled by Mr William Stewart, who is a full-time employee of WIN
Metals Ltd. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335). Mr
Stewart has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Compliance Statement
The information in this report are extracted from the ASX Announcements listed in the table below, which are also
available on the Company’s website at www.winmetals.com.au and the ASX website www.asx.com under the code
WIN.
23 July 2024
Munda Agreement with Auric Mining Ltd yields $1.2m for WIN
3 July 2024
Change of Company Name
15 May 2024
Results of Rights Issue and Shortfall Notice
18 April 2024
Rights Issue Prospectus
16 April 2024
Non-Renounceable Rights Issue to Raise up to $4m
7 March 2024
Standalone Mt Edwards Project Scoping Study
8 November 2023
375% Growth in Faraday-Trainline Lithium Mineral Resource
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the market announcements continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have not
been materially modified from the original market announcements.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
8
June 2024 Quarterly Report
31 July 2024
Forward Looking Statement
Caution regarding Forward Looking Information. This document contains forward looking statements concerning
WIN Metals Ltd. Forward looking statements are not statements of historical fact and actual events and results may
differ materially from those described in the forward-looking statements as a result of a variety of risks,
uncertainties, and other factors. Forward looking statements in this document are based on WIN's beliefs, opinions
and estimates as of the dates the forward-looking statements are made, and no obligation is assumed to update
forward looking statements if these beliefs, opinions, or estimates should change or to reflect other future
developments.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
9
June 2024 Quarterly Report
31 July 2024
Appendix 1 – Tenement Interests
There were no changes in the Company’s tenement interests during the Quarter other than an application for
miscellaneous licence L15/0478. As of 30 June 2024, the Company has an interest in the following projects and
tenements in Western Australia:
Project Name
Licence Name
Beneficial Interest
Status
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
M15/87*
M15/699
P15/5905*
P15/5906*
M15/1899*
P15/6362
P15/6387
E15/1665*
P15/6408*
P15/6539
E15/1749
E15/1929*
E15/1864*
P15/6570
P15/6612
L15/0426
M15/45
M15/46
M15/48
M15/74
M15/75
M15/77
M15/78
M15/79
M15/80
M15/94
M15/96
M15/97
M15/99
M15/100
M15/101
M15/102
M15/103
M15/105
L15/102
M15/478
M15/633
M15/653
M15/693
M15/698
M15/1271
L15/254
E15/989
L15/280
E15/1505
E15/1507
E15/1576
E15/1583
P15/6092
E15/1553
L15/0478
100% (**)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100%
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (^)
100% (^)
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (^)
100% (^)
100%
100% (^)
100% (^)
100% (#)
100% (^)
100% (#)
100% (#)
100%
100% (^)
100%
100%
100%
100% (#)
100% (#)
100% (#)
100% (#)
100%
Live
Live
Live
Live
Pending
Live
Live
Pending
Live
Pending
Live
Pending
Pending
Live
Live
Pending
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Pending
* Tenure subject of the divestment/partial divestment to Auric Mining as announced post Quarter on 23 July 2024
**Lithium and Nickel Mineral rights only, ^Nickel Mineral rights only, # No gold interest
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
10
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
WIN METALS LTD
ABN
Quarter ended (“current quarter”)
77 648 687 094
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 JUNE 2024
Current quarter
$A’000
Full Year (12
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs – net of project allocations
(249)
(680)
(e) administration and corporate costs
(117)
(1,148)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
9
153
1.5
Interest and other costs of finance paid
(1)
(6)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives –
R&D Tax incentive
1,176
1,176
1.8
Other (provide details if material) – sale of
plant and equipment
-
118
1.9
Net cash from / (used in) operating
activities
818
(387)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(207)
(720)
(10,234)
-
-
(d) exploration & evaluation
(e) investments
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 11
Current quarter
$A’000
Consolidated statement of cash flows
(f)
-
(2)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(720)
(10,443)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
848
848
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
1
1
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(100)
(100)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(19)
(73)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
730
676
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
863
11,845
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
818
(387)
2.2
other
non-current
Bonds/security deposits
assets
–
Full Year (12
months)
$A’000
Proceeds from the disposal of:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 12
Consolidated statement of cash flows
Current quarter
$A’000
Full Year (12
months)
$A’000
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(720)
(10,443)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
730
676
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
1,691
1,691
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
1,691
863
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,691
863
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
97
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
51
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 13
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
67
67
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
67
67
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
3 x 3 year secured finance lease agreements with Toyota Finance for Toyota Hilux vehicles
commencing October 2021, January 2022 and March 2022 respectively at 2.9% pa.
1 x 3 year secured finance lease agreement with Toyota Finance for an Isuzu truck at
5.59% pa commencing December 2022.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9) – excluding
the R&D Tax incentive receipt
(358)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(720)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,078)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,691
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1,691
1.57
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as
“N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: No, the company is currently partially defraying its cost base by providing
rehabilitation and exploration services to other companies in the Widgiemooltha region.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 14
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: In July 2024 the Company entered into a transaction with Auric Mining Ltd which
will net WIN a minimum $1.2m within the next 12 months. In addition, the Company
maintains its full ASX listing rule 7.1 and 7.1A placement capacity.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, refer the Company’s funding activities described at 8.8.2 above.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
..................31 July 2024.................................................................
Authorised by: ..........The Board.........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s
activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do
so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting St
Share your feedback
Discover