Widgie Nickel Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
30 October 2023
September 2023 Quarterly Report
Highlights
•
•
All mining approvals at Faraday received following finalisation of the Botanical Survey and
Cultural Heritage Survey allowing mining to proceed.
Confirmatory QAQC testwork instigated by the Company demonstrated that the assay method
utilised for the programs of drilling that informed the Mineral Resource Estimate underestimated
the lithium grade at Faraday by up to 63%.
Lithium
•
•
•
All samples from the program are being re-assayed using the correct fusion assay method, with
an updated Mineral Resource Estimate to be completed soon after receipt of results.
Updated Mineral Resource expected to increase with a materially higher grade at Faraday and
larger size through the addition of Trainline to the north.
Drilling highlights from the quarter include:
23MERC338: 12m @ 0.99% Li2O from 31m
incl 9m @ 1.15% Li2O from 31m
Nickel
•
•
Exploration throughout the Quarter has led to a number of high-grade nickel hits, which have
unlocked significant mineral resource growth potential at a number of the Company’s nickel
projects across its broader Mt Edwards Nickel Project.
Drilling highlights for the quarter include:
23MERCD112: 9.14m @ 10.44% Ni, 0.75% Cu, 0.13% Co, 1.93g/t 3PGE from 330m
incl 2.61m @ 18.88% Ni, 0.48% Cu, 0.23% Co, 0.65g/t 3PGE from 335.44m
Widgie Nickel Ltd (ASX: WIN) (“Widgie” or “the Company”) is pleased to present its Quarterly Report
for the period ended 30 September 2023.
Widgie Nickel’s Managing Director and CEO, Mr Steve Norregaard, commented:
“It was a milestone quarter for the Company, which saw us take some great strides towards the
commencement of mining at our Faraday-Trainline Lithium Project.
“Our two-pronged attack of Lithium and Nickel look closer to becoming a reality as our Nickel
exploration continues to strike high-grade nickel right across our multi-faceted Mt Edwards Nickel
Project.
“In the forthcoming quarter, we look forward to receiving our re-assayed lithium results as we continue
to expand the mineral resources across our portfolio and progress our various projects towards
development.”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
1
September 2023 Quarterly Report
30 October 2023
Shovel-ready High-Grade Lithium Project
Following further exploration across the Quarter and the finalisation of the Botanical and Cultural
Heritage Surveys, mining is now set to proceed at the Faraday-Trainline Lithium Project.
The Company satisfied all the conditions necessary to begin mining over the proposed mining footprint
area with lodgement of the Botanical Survey and receipt of the final report on the Aboriginal Cultural
Heritage Survey carried out on M15/102 with neither survey noting any issues.
The Company also instigated confirmatory QAQC testwork which demonstrated the assay method
utilised for a program of drilling that previously informed the Mineral Resource Estimate has
underestimated the grade by on average 29%. Widgie has re-assayed 651 samples using a fusion
method. A further 2,150 assays are now being re-assayed to complete the process. Based on the initial
findings, it is expected that an updated Mineral Resource Estimate for Faraday-Trainline will result in
a materially higher lithium grade. 1
Lithium Exploration Success
Widgie unveiled its Trainline prospect in July when it unearthed the new near surface lithium prospect
directly to the north of the Faraday Lithium Deposit (figure 2).
At the Faraday deposit itself, 80 metre step out drilling downdip to the west demonstrated that
mineralisation continues at depth. Overall, the drill results indicate strong potential to increase lithium
resources # . Further XRD analysis indicates that spodumene* is the exclusive lithium bearing mineral.
The drilling results at Trainline and Faraday included:
Trainline Discovery:
• 23MERC118
and
incl
• 23MERC114
incl
• 23MERC113
incl
1
2m @ 0.86% Li2O from 4m
9m @ 0.82% Li2O from 17m
4m @ 1.19% Li2O from 22m
10m @ 0.68% Li2O from 43m
7m @ 0.79% Li2O from 43m
7m @ 0.61% Li2O from 30m
3m @ 0.94% Li2O from 30m
ASX Announcement – 27 September 2023 “Higher grade Lithium to come on the cusp of being shovel ready at Faraday”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
2
September 2023 Quarterly Report
30 October 2023
Figure 1 - Regional Geology showing the Faraday-Trainline Lithium Project location, and surrounding lithium projects
Faraday Extension:
• 23MERC129
and
• 23MERC131
incl
and
• 23MERC132
and
incl
1m @ 0.89% Li2O from 23m
3m @ 0.63% Li2O from 92m
3m @ 0.63% Li2O from 99m
1m @ 1.20% Li2O from 100m
4m @ 0.47% Li2O from 105m
2m @ 0.55% Li2O from 130m
5m @ 0.69% Li2O from 137m
3m @ 0.87% Li2O from 137m
# Maiden Faraday resource 481,000t at 0.59% Li2O at 0.3% Li2O cut-off
*XRD mineral identification of 16 samples, identifies spodumene as the exclusive lithium bearing mineral
These discoveries came less than four months after Widgie announced its maiden Mineral Resource
Estimate at Faraday (refer to ASX release dated 29 March 2023).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
3
September 2023 Quarterly Report
30 October 2023
The Faraday-Trainline Lithium Project area is located on Mining Lease M15/102, 4km west north-west
of the Widgiemooltha township. Access is via the Coolgardie-Norseman Rd, 63 kilometres south of
Coolgardie. Faraday and Trainline are central to Widgie’s Mt Edwards Project, covering a significant
land holding within the “Lithium Corridor” between Mt Marion to the north and Pioneer Dome to the
south (Figure 1). 2
Widgie also undertook flowsheet development test work and achieved 81.0% lithium recovery to a 6.3%
Li 2 O flotation concentrate. Mineralisation from the Faraday-Trainline project responds well to heavy
liquid separation and even better to finer sizing by direct flotation after the removal of magnetic
particles and slimes. The work also delivered elevated grades of rubidium of up to 0.7% in some
process streams with a strong association to potassium feldspar noted. 3
Following exploration drilling during the Quarter, post-quarter on 2 October 2023 Widgie announced a
boost to the scale and grade of its Faraday-Trainline Lithium Project.
Figure 2 - Plan view of recent Trainline (blue wireframe) infill drilling and Faraday mineral resource to the south
2
3
ASX Announcement: 4 July 2023 “New Lithium Discoveries Position Widgie for Resource Growth”
ASX Announcement 2 August 2023 “Faraday Metallurgical Testwork – Excellent Flotation Response”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
4
September 2023 Quarterly Report
30 October 2023
Image 1 - Faraday drill core under UV light, Red/Orange – Spodumene (Lithium bearing mineral LiAlSi2O6)
The results from infill drilling to a 40m by 40m spacing has confirmed near surface, high-grade
mineralisation at the Trainline lithium prospect. The results outperformed those from the first batch of
results from the maiden drilling across the area, which are subsequently being re-assayed.
Drill density and mineralisation continuity now will allow a Resource to be estimated.
Drilling Highlights include4:
23MERC338
incl
23MERC339
Incl
12m @ 0.99% Li2O from 31m
9m @ 1.15% Li2O from 31m
15m @ 0.85% Li2O from 37m
9m @ 1.01% Li2O from 42m
•
23MERC333
incl
8m @ 0.97% Li2O from 36m
5m @ 1.30% Li2O from 38m
•
23MERC334
incl
and
5m @ 0.88% Li2O from 34m
2m @ 1.68% Li2O from 37m
8m @ 0.67% Li2O from 45m
incl
23MERC336
incl
23MERC340
incl
23MERC341
incl
23MERC366
and
4m @ 1.06% Li2O from 45m
10m @ 0.72%Li2O from 46m
5m @ 0.88% Li2O from 48m
12m @ 0.66% Li2O from 54m
4m @ 1.07% Li2O from 54m
7m @ 0.62% Li2O from 66m
2m @ 0.99% Li2O from 68m
1m @ 2.15% Li2O from 21m
10m @ 0.72% Li2O from 38m
•
•
•
•
•
•
The Company continues to progress offtake discussions for its Faraday-Trainline Lithium project.
4
ASX Announcement – 2 October 2023 “Drilling Delivers High-grade Lithium at Trainline”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
5
September 2023 Quarterly Report
30 October 2023
Lithium Advisory Panel
The Company has formed a Lithium advisory panel to advance the Company’s lithium interests with the
benefit of the expertise of Chris Reed and Mike Tamlin. Chris is currently Managing Director of
Neometals (ASX:NMT) and was instrumental in the acquisition and subsequent development of Mt
Marion, today one of Australia’s largest hard rock lithium operations. Mike is Head of Lithium at
Neometals and is a metallurgist with significant commercial experience in lithium. He developed the
chemical spodumene trade between Australia and China starting in the 1990s and has had senior roles
in lithium projects in global lithium hard rock, chemical processing and brine resource development.
Continuing High-grade Nickel Growth
Exploration throughout the Quarter has led to a number of high-grade nickel hits, which have unlocked
mineral resource growth potential over a number of the Company’s nickel deposits(figure 3).
Figure 3 - Mt Edwards nickel deposits
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
6
September 2023 Quarterly Report
30 October 2023
132N
In September, the Company reported exceptionally high-grade broad nickel mineralisation at 132N
(figure 4).
The results revealed:
•
23MERCD112
incl
9.14m @ 10.44% Ni, 0.75% Cu, 0.13% Co, 1.93g/t 3PGE from 330.00m
2.61m @ 18.88% Ni, 0.48% Cu, 0.23% Co, 0.65g/t 3PGE from 335.44m
132N is located on Mining Lease M15/101, 6km north-west of the Widgiemooltha township. Access is
via the Coolgardie-Esperance Highway, 63km south of Coolgardie.
132N lies to the north of the Widgiemooltha Dome, a double plunging anticlinal structure cored by a
deformed granitoid. The pre-deformation stratigraphy at 132N consists of a basaltic footwall and
ultramafic hanging wall with minor sediment units found within the footwall basalt unit.
Figure 4 - Long section of 132N Deposit, 23MERCD112 intercept 9.14m @ 10.44% Ni
Widgie Townsite
Exploration during the Quarter confirmed a high-grade nickel discovery on the Eastern Limb of the
Widgie Townsite syncline in addition to the work confirming high-grade continuity at depth (figure 5).
New Eastern Transitional mineralisation was identified in pre-collars of holes destined to intersect
Townsite at dept. Given the multitude and tenor of these results the prospectivity of this area at depth
in a fresh rock setting is very promising and bodes well for further exploration success.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
7
September 2023 Quarterly Report
30 October 2023
Significant nickel intercepts from exploration during the Quarter include:
Eastern Limb:
•
MEDD069
29.0m @ 1.66% Ni from 79m
incl
5.0m @ 3.23% Ni from 88m
Widgie Townsite:
•
•
MEDD061
30.85m @ 1.59% Ni from 435m
incl
13.43m @ 2.74% Ni from 449.7m
and
3.36m @ 3.27% Ni from 471.3m
23MERCD039 14.0m @ 2.73% Ni from 509m
incl
•
11.03m @ 3.19% Ni from 511m
23MERCD038 1.04m @ 5.49% Ni from 479.6m
Eastern Transitional:
•
•
23MERCD039 43.0m @ 0.69% Ni from 65m
23MERCD038 22.0m @ 1.02% Ni from 36m
A detailed structural review continues to enhance the Company’s understanding of the Project and its
nickel endowment. 5
Figure 5 - Widgie Townsite long section looking Northeast - Significant intercepts shown
5
ASX announcement: 27 July 2023 “Widgie Townsite Grows Legs – High-grade Nickel Hits”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
8
September 2023 Quarterly Report
30 October 2023
Widgie 3
Significant nickel mineralisation was confirmed during the Quarter at the Widgie 3 Nickel deposit. The
mineralisation remains open at depth with increasing grade interpreted down plunge with thick
intercepts of high-grade nickel sulphide and PGE mineralisation established (figure 6).
The results received will help form a Mineral Resource update in the near term with increased Resource
confidence.
Widgie is aiming for the work to ultimately feed into the feasibility studies with the goal of a more
substantive nickel mining operation incorporating the Widgie South deposits (comprising Widgie 3,
Widgie Townsite, Gillett and Gillett North), Armstrong and 132N feeding a standalone nickel
concentrator. 6
Figure 6 - Widgie 3 Long Section looking North East – 2023 drilling intercepts highlighted
6
ASX Announcement: 8 September 2023 “High-Grade Widgie 3 Nickel Results”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
9
September 2023 Quarterly Report
30 October 2023
Notable significant nickel intercepts across the period include:
•
23MERCD073
incl
15.47m @ 3.17% Ni, 0.27% Cu, 0.04% Co, 1.51g/t 3PGE from 301.00m
6.81m @ 5.92% Ni, 0.50% Cu, 0.07% Co, 2.58g/t 3PGE from 309.66m
•
23MERCD079
incl
27.70m @ 1.26% Ni, 0.11% Cu, 0.02% Co, 0.50g/t 3PGE from 379.00m
2.39m @ 6.56% Ni, 0.68% Cu, 0.09% Co, 2.12g/t 3PGE from 404.29m
•
23MERCD080
incl
7.74m @ 2.94% Ni, 0.28% Cu, 0.04% Co, 1.24g/t 3PGE from 369.26m
5.75m @ 3.76% Ni, 0.36% Cu, 0.05% Co, 1.52g/t 3PGE from 369.70m
Gillett
Significant nickel intercepts outside the current Gillett Mineral Resource extended the mineralisation
to the south (270m) and north (120m) and confirmed a high-grade core of Gillett North (figure 7).
Drilling throughout the Quarter increased Mineral Resource confidence for future mining studies. 7
Headline nickel intercepts include:
Gillett:
Infill
23MERCD004 12.0m @ 1.97% Ni from 192m
incl
7.90m @ 2.55% Ni from 194.1m
Exploration
23MERCD057 7.00m @ 1.14% Ni from 295m
Exploration
23MEDD007
Exploration
23MERCD027 13.2m @ 1.68% Ni from 278.88m
incl
2.51m @ 4.36% Ni from 289.57m
2.12m @ 1.33% Ni from 218m
Gillett North:
Gillett is central to Widgie South, a key component of the Mt Edwards project pipeline, which currently
contains a combined 71,800t Ni in resource with an increase expected in the updated Gillett Mineral
Resource Estimate before the end of the year.
7
ASX Announcement – 20 July 2023 “Unlocking Resource Growth at Widgie South”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
10
September 2023 Quarterly Report
30 October 2023
Figure 7 - Gillett and Gillett North long section looking North East – 2023 drilling intercepts highlighted
Corporate
Annual General Meeting (AGM)
The Company’s AGM is scheduled to be held on Wednesday 8 November 2023. Shareholders are
encouraged to attend the meeting and submit their proxy votes in advance of the meeting.
Cash Position
As at 30 September 2023, Widgie held approximately $6.08 million cash at bank. Full details regarding
the Company’s cash movements during the Quarter can be found in the attached Appendix 5B.
Corporate information as at 30 September 2023:
ASX code:
WIN
Board of Directors:
Quoted Ordinary shares on issue:
297,945,053
Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue:
-
Andrew Parker – Independent non-executive Chairman
Unlisted Options ($0.20 to $0.40):
10,550,000
Felicity Repacholi - Independent non-executive Director
Unlisted Performance Rights
-
Scott Perry - Independent non-executive Director
Share price range since listing:
$0.18 to $0.67
Share price at end of Quarter:
$0.198
Company Secretary:
Market cap (at $0.198):
$58.8m
Graeme Scott
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
11
September 2023 Quarterly Report
30 October 2023
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter
totalled $5,093,065 Details of exploration activities undertaken during the Quarter are as described
above and in this section.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development
activities undertaken during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial
percentage interest held in those Tenements at the end of the Quarter is included in the Table at the
end of this as Appendix 1.
ASX Listing Rule 5.3.4: The Company provides its actual expenditure on the individual items in the two
year “use of funds” statement outlined in its Prospectus dated 18 August 2021 and an explanation of
any material differences:
Use of funds $A’000
Prospectus
Actual
2 years
1 July 2021 to 30 Sep
2023
Feasibility studies
$12,713
$13,178
($465)
Exploration
$4,544
$10,936
($6,392)
Corporate and
administration
$3,112
$3,076
$36
Capital expenditure
$319
$2,106
($1,787)
Cash expenses of the
Offer
$1,575
$2,174
($599)
Total uses
$22,263
$31,469
($9,206)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
Variance
info@widgienickel.com.au
www.widgienickel.com.au
12
September 2023 Quarterly Report
30 October 2023
Additional breakout of Feasibility studies costs above:
Use of funds $A’000
Prospectus
Actual
Variance
2 years
1 July 2021 to 30 Sep
2023
Drilling - Resource and
extensional
$8,762
$8,731
($31)
Test work
$860
$385
$475
Study work and
approvals
$3,091
$4,062
($971)
Total Feasibility
Studies
$12,713
$13,178
($465)
Variance commentary
Widgie had set itself the objective of being production ready by end of calendar year 2023 and
prioritised 6 deposits for infill Diamond and RC drilling to increase the Mineral Resource confidence.
The Company has progressed its Armstrong Resource through feasibility studies as its first mine,
however emboldened by exploration and extension drilling success during these programs provided
foundation in the latter part of last financial year to commence a Scoping Study for a larger mining
operation than was previously planned including consideration of a standalone processing plant
located onsite. The standalone operation seeks to unlock substantially more value from Widgie’s entire
Resource base.
To the end of the Quarter the Company is well advanced with the enlarged Scoping Study to incorporate
Armstrong, Widgie Townsite, Gillett, Widgie 3 and 132N. Drilling and updated Mineral Resource
Estimates for Armstrong (update from November 2022) and Gillett (update from January 2023) are to
be completed, with drilling now having been completed at Munda, Widgie Townsite, 132N and Widgie
3 allowing these resources also to be updated.
In October 2022 Widgie discovered rock chips grading up to 3.7% Li 2 O. Since discovery Widgie has fast
tracked exploration and development activities at Faraday through drilling, declaration of a maiden
Resource in March 2023, metallurgical testwork, permitting activities and offtake discussions. As at
the end of the Quarter the Faraday deposit is fully permitted ready for commencement of mining.
Further potential to increase the Company’s lithium endowment has been evidenced by further
exploration success at the Trainline prospect just to the north of Faraday. All drilling costs related to
lithium exploration, lithium Resource drill out and metallurgical samples have been classified as
Exploration in the Use of Funds comparison table above.
Whilst the lithium activities were not contemplated under the Company’s Prospectus and the
successful discoveries of additional mineralisation at Gillett North and South has resulted in additional
drilling and supporting costs the Company was able to achieve its aims.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
13
September 2023 Quarterly Report
30 October 2023
The Company has incurred higher capital expenditure than was planned in the IPO Prospectus use of
funds. The additional costs incurred include the installation and operation of its own onsite
accommodation facilities which houses all site staff costing approximately $700,000. Whilst these
facilities weren’t originally planned, bringing these facilities and some activities in house minimises
travel time and the associated risks with travel prior to and after a workday, which in turn provides
greater flexibility and control to Widgie. Commensurate with this, operational costs have reduced as a
result. In addition, the Company also purchased various plant and equipment, including two second
hand low hour Volvo L90H loaders at a cost of $493,500. The addition of these vehicles and other
equipment to the Company’s plant and equipment list in the interim enables the Company to undertake
drill pad preparation and rehabilitation works in an efficient cost effective manner rather than rely on
ad-hoc contractors. In the medium to longer term the loaders will likely become part of the Company’s
mining fleet.
Consistent with our industry peers, Widgie has also incurred increased staff and associated costs
above that planned through higher rates and use of contractors above that assumed in the use of funds.
The Company secured additional funding through an equity placement in May 2023 of $12 million before
costs to supplement its IPO funding and maintain all its activities.
Image 2 - Site camp and core processing facilities situated at 132N
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter
totalled $158,000. The payments were in respect of salaries and superannuation paid to the executive
director and directors’ fees payable to the non-executive directors.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
14
September 2023 Quarterly Report
30 October 2023
Approved by: Board of Widgie Nickel Ltd
-ENDSFor further details please contact:
Steve Norregaard
Managing Director
steve@widgienickel.com.au
0472 621 529
Media Enquiries
Steve Kaless
White Noise Communications
steve@whitenoisecomms.com
0477 376 227
Competent Person Statement
The information in this announcement that relates to exploration results is based on and fairly
represents information and supporting documentation compiled by Mr William Stewart, who is a fulltime employee of Widgie Nickel Limited. Mr Stewart is a member of the Australian Institute of
Metallurgy and Mining (member no 224335). Mr Stewart has sufficient experience that is relevant to
the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
Compliance Statement
The information in this report are extracted from the ASX Announcements listed in the table below,
which are also available on the Company’s website at www.widgienickel.com.au and the ASX website
www.asx.com under the code WIN.
4/07/2023
20/07/2023
27/07/2023
2/08/2023
4/08/2023
8/09/2023
13/09/2023
27/09/2023
2/10/2023
New Lithium Discoveries Position Widgie for Resource Growth
Unlocking Resource Growth at Widgie South
Widgie Townsite Grows Legs – High-grade Nickel Hits
Faraday Metallurgical Testwork-Excellent Flotation Response
Faraday Mining Proposal Approved
High Grade Widgie 3 Nickel Results
Exceptional 132N Massive Sulphide Hit Confirmed
Higher Grade Lithium to come on the cusp of being shovel ready at
Faraday
Drilling Delivers High-grade Lithium at Trainline
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and
technical parameters underpinning the estimates in the market announcements continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original market
announcements.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
15
September 2023 Quarterly Report
30 October 2023
Forward Looking Statement
Caution regarding Forward Looking Information. This document contains forward looking statements
concerning Widgie Nickel Limited. Forward looking statements are not statements of historical fact and
actual events and results may differ materially from those described in the forward-looking statements
as a result of a variety of risks, uncertainties, and other factors. Forward looking statements in this
document are based on Widgie's beliefs, opinions and estimates as of the dates the forward-looking
statements are made, and no obligation is assumed to update forward looking statements if these
beliefs, opinions, or estimates should change or to reflect other future developments.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
16
September 2023 Quarterly Report
30 October 2023
Appendix 1 – Tenement Interests
During the Quarter Auric Mining Ltd relinquished its gold interests in E15/1505 and E15/1507 back to
Widgie. There were no other changes in the Company’s tenement interests during the Quarter. As of 30
September 2023, the Company has an interest in the following projects and tenements in Western
Australia:
Project Name
Licence Name
Beneficial Interest
Status
Mt Edwards
M15/87
100% (**)
Live
Mt Edwards
M15/699
100% (#)
Live
Mt Edwards
P15/5905
100% (#)
Live
Mt Edwards
P15/5906
100% (#)
Live
Mt Edwards
M15/1899
100% (#)
Pending
Mt Edwards
P15/6362
100% (#)
Live
Mt Edwards
P15/6387
100% (#)
Live
Mt Edwards
E15/1665
100% (#)
Pending
Mt Edwards
P15/6408
100% (#)
Live
Mt Edwards
P15/6539
100% (#)
Pending
Mt Edwards
E15/1749
100% (#)
Live
Mt Edwards
E15/1929
100% (#)
Pending
Mt Edwards
E15/1864
100% (#)
Pending
Mt Edwards
P15/6570
100% (#)
Live
Mt Edwards
P15/6612
100% (#)
Live
Mt Edwards
L15/0426
100%
Pending
Mt Edwards
M15/45
100% (^)
Live
Mt Edwards
M15/46
100% (^)
Live
Mt Edwards
M15/48
100% (^)
Live
Mt Edwards
M15/74
100% (#)
Live
Mt Edwards
M15/75
100% (#)
Live
Mt Edwards
M15/77
100% (^)
Live
Mt Edwards
M15/78
100% (^)
Live
Mt Edwards
M15/79
100% (^)
Live
Mt Edwards
M15/80
100% (^)
Live
Mt Edwards
M15/94
100% (^)
Live
Mt Edwards
M15/96
100% (#)
Live
Mt Edwards
M15/97
100% (#)
Live
Mt Edwards
M15/99
100% (#)
Live
Mt Edwards
M15/100
100% (#)
Live
Mt Edwards
M15/101
100% (#)
Live
Mt Edwards
M15/102
100% (#)
Live
Mt Edwards
M15/103
100% (^)
Live
Mt Edwards
M15/105
100% (^)
Live
Mt Edwards
L15/102
100%
Live
Mt Edwards
M15/478
100% (^)
Live
Mt Edwards
M15/633
100% (^)
Live
Mt Edwards
M15/653
100% (#)
Live
Mt Edwards
M15/693
100% (^)
Live
Mt Edwards
M15/698
100% (#)
Live
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
info@widgienickel.com.au
www.widgienickel.com.au
17
September 2023 Quarterly Report
30 October 2023
Mt Edwards
M15/1271
100% (#)
Live
Mt Edwards
L15/254
100%
Live
Mt Edwards
E15/989
100% (^)
Live
Mt Edwards
L15/280
100%
Live
Mt Edwards
E15/1505
100%
Live
Mt Edwards
E15/1507
100%
Live
Mt Edwards
E15/1576
100% (#)
Live
Mt Edwards
E15/1583
100% (#)
Live
Mt Edwards
P15/6092
100% (#)
Live
Mt Edwards
E15/1553
100% (#)
Live
**Lithium and Nickel Mineral rights only
^Nickel Mineral rights only
# No gold interest
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
18
September 2023 Quarterly Report
30 October 2023
Appendix 2 – RC Holes drilled during the Quarter
Prospect
Tenement
Hole ID
Depth
Easting
Northing
RL
Dip
Azi
Status
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Fara