High Grade Widgie 3 Nickel Results
Released
Released
Announcement PDF
ASX Announcement
8 September 2023
High Grade Widgie 3 Nickel Results
Highlights
•
Significant nickel mineralisation intercepts at Widgie 3 confirmed:
Thick intercepts of high-grade nickel sulphide and PGE mineralisation confirmed
Mineralisation remains open at depth with increasing grade interpreted down plunge
Drilling results received will facilitate resource update with increased resource confidence
•
High grade results will ultimately feed into the feasibility studies that envisions a more substantive nickel mining
operation than just Armstrong, incorporating the Widgie South deposits (comprising Widgie 3, Widgie Townsite,
Gillett and Gillett North), Armstrong and 132N supported by a standalone nickel concentrator
•
Notable significant nickel intercepts include:
23MERCD073 15.47m @ 3.17% Ni, 0.27% Cu, 0.04% Co, 1.51g/t 3PGE from 301.00m
Incl
6.81m @ 5.92% Ni, 0.50% Cu, 0.07% Co, 2.58g/t 3PGE from 309.66m
23MERCD079 27.70m @ 1.26% Ni, 0.11% Cu, 0.02% Co, 0.50g/t 3PGE from 379.00m
Incl
2.39m @ 6.56% Ni, 0.68% Cu, 0.09% Co, 2.12g/t 3PGE from 404.29m
23MERCD080 7.74m @ 2.94% Ni, 0.28% Cu, 0.04% Co, 1.24g/t 3PGE from 369.26m
Incl
5.75m @ 3.76% Ni, 0.36% Cu, 0.05% Co, 1.52g/t 3PGE from 369.70m
3.53% Ni
8.10% Ni
9.99% Ni
8.43% Ni
11.32% Ni
3.25% Ni
2.62% Ni
1.68% Ni
3.24% Ni
0.67% Ni
19.57% Ni
Figure 1 23MERCD073 Individual assay results from massive to matrix sulphide mineralisation
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
1
High Grade Widgie 3 Nickel Results
8 September 2023
Table 1 23MERCD073 Individual assay results from massive to matrix sulphide mineralisation
Hole ID
From (m)
To (m)
DHW (m)
Ni pct
Cu pct
Co pct
As ppm
3PGE (g/t)
23MERCD073
309.66
310.08
0.42
3.53
0.44
0.04
137
1.05
23MERCD073
310.08
310.95
0.87
8.10
1.49
0.09
284
1.33
23MERCD073
310.95
312
1.05
9.99
0.58
0.11
226
1.86
23MERCD073
312
312.5
0.50
8.43
0.68
0.09
172
2.86
23MERCD073
312.5
312.9
0.40
3.25
0.31
0.04
65
2.95
23MERCD073
312.9
313.22
0.32
11.32
0.17
0.11
192
7.94
23MERCD073
313.22
313.8
0.58
2.62
0.20
0.05
59
3.11
23MERCD073
313.8
314.54
0.74
1.68
0.16
0.02
57
1.53
23MERCD073
314.54
315.18
0.64
3.24
0.52
0.03
181
4.94
23MERCD073
315.18
316.13
0.95
0.67
0.07
0.01
257
1.65
23MERCD073
316.13
316.47
0.34
19.57
0.51
0.23
759
3.60
Managing Director, Steve Norregaard said: “These exceptional results from Widgie 3 resource definition drilling continue
to point towards a robust Widgie 3 resource upgrade and in turn more favourable underlying economics. Considering the
deepest drilling in this phase confirms mineralisation to only a very shallow 300m below surface we can look forward to
the upcoming Widgie 3 resource update with further resource growth if warranted on the horizon.
This all feeds into our plan to incorporate the Widgie South deposits into a scoping study with the aim of becoming a
major sulphide nickel producer.”
Widgie Nickel Limited (ASX: WIN, “Widgie” or “the Company”) is pleased to announce assay results received from its
recent Diamond drilling (DD) infill program targeting the Widgie 3 nickel mineralisation system.
The Company sees Widgie South (comprising Widgie 3, Widgie Townsite, Gillett and Gillett North) as a key mining centre
within the Company’s nickel portfolio given its significant nickel endowment of 71,800 t Ni (Indicated and Inferred
Resources). The Scoping Study which is currently underway, incorporating the Widgie South deposits, 132N and
Armstrong mining centres is set to reaffirm Widgie’s aspirations of becoming the next major nickel producer in Australia.
The Widgie South area is located on Mining Lease M15/94, 1km to the south of the Widgiemooltha township. Access
is via the Coolgardie-Norseman Rd, 63km south of Coolgardie. Widgie South is central to the Company’s Mt Edwards
Project, covering a significant land holding within the Widgiemooltha Nickel Province between the historic Spargoville
nickel mines to the north and the currently operating Cassini nickel mine (Wyloo Metals) to the south (Figure 2).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
2
High Grade Widgie 3 Nickel Results
8 September 2023
Figure 2 Mt Edwards nickel deposits (1% Ni Resource cut-off)
This announcement pertains to all completed drill holes at Widgie 3 and assays returned as of 22 August 2023 not
previously reported.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
3
High Grade Widgie 3 Nickel Results
3 April 2023
8 September
2023
Figure 3 Widgie 3 Long Section looking North East – 2023 drilling intercepts highlighted
Widgie South Geology and Geological Interpretation
Widgie South lies at the north-eastern flank of the Widgiemooltha Dome, a double plunging anticlinal structure cored by
a deformed granitoid. The pre-deformation stratigraphy at Widgie South consists of a basaltic footwall and ultramafic
hangingwall with minor sediment units found within the footwall basalt unit. Felsic intrusives (porphyries) are only found
locally at Widgie 3 and range from 1m-10m in thickness that run parallel to the basal contact.
The nickel sulphide mineralisation plunges in various orientations at each Widgie South deposit due to their location
upon opposing limbs of the folded stratigraphy. Figure 4 illustrates the fold geometry of Widgie South and the respective
mineralisation positions. Generally, the massive sulphide mineralisation is found upon the basal contact where it grades
into disseminated sulphides within the ultramafic hangingwall. Depth of weathering varies from 5m-10m at Widgie 3 in
the south, to 60m at Widgie Townsite in the north.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
4
High Grade Widgie 3 Nickel Results
8 September 2023
Figure 4 Schematic of Widgie South geology and mineralisation positions
Discussion of Results
Resource Infill results have further increased the confidence within the Widgie 3 Resource. 2023 drill results will be
incorporated into the updated 2023 Widgie 3 Mineral Resource Estimate due to commence in October 2023.
The 2023 drillholes and the Widgie 3 2021 Mineral Resource envelope are shown in Figure 5. Figure 6 illustrates drill
section A-A including 23MERCD073 and 23MERCD080 drill traces.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
5
High Grade Widgie 3 Nickel Results
8 September 2023
Figure 5 – Plan view of Widgie 3 showing 2023 drilling and locations of sections
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
6
High Grade Widgie 3 Nickel Results
8 September 2023
Figure 6 23MERCD073 and 23MERCD080 drill section
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
7
High Grade Widgie 3 Nickel Results
8 September 2023
Table 2: Widgie 3 Drill Intercepts (0.5% Ni cut-off)
23MEDD008
Hole
Type
DD
incl.
DD
Hole ID
23MERCD067
Prospect
Infill/Ex
Widgie 3
Infill
From
(m)
274.8
Widgie 3
Infill
278.6
Widgie 3
Infill
281.7
DHW
(m)
6.90
Ni
pct
1.15
Cu
pct
0.11
Co
pct
0.02
As
ppm
728
3PGE
(g/t)
0.74
281.7
3.10
1.78
0.18
0.02
1595
1.14
To (m)
NSI
23MERCD068
RC/DD
Widgie 3
Infill
207
211
4.00
1.07
0.07
0.02
1988
1.40
23MERCD069
RC/DD
Widgie 3
Infill
incl.
RC/DD
Widgie 3
Infill
232.2
254
21.80
1.18
0.10
0.02
224
0.59
250.3
252.89
2.59
2.16
0.17
0.03
721
1.10
23MERCD070
RC/DD
Widgie 3
Infill
187
189
2.00
1.12
0.16
0.01
155
0.80
23MERCD071
RC
Widgie 3
Infill
227
233
6.00
0.98
0.09
0.02
321
0.56
incl.
RC
Widgie 3
Infill
228
231
3.00
1.26
0.10
0.02
561
0.69
23MERCD072
RC/DD
Widgie 3
Infill
218
224.36
6.36
1.45
0.11
0.02
275
0.70
23MERCD073
RC/DD
Widgie 3
Infill
301
316.47
15.47
3.17
0.27
0.04
524
1.51
incl.
RC/DD
Widgie 3
Infill
309.66
316.47
6.81
5.92
0.50
0.07
207
2.58
23MERCD074
RC/DD
Widgie 3
Infill
266
276.76
10.76
1.67
0.16
0.02
933
0.69
and
RC/DD
Widgie 3
Infill
290
292.51
2.51
2.46
0.32
0.03
134
0.47
incl.
RC/DD
Widgie 3
Infill
291.15
291.66
0.51
6.82
1.03
0.07
271
1.03
23MERCD075
RC/DD
Widgie 3
Infill
324
345
21.00
1.35
0.10
0.02
36
0.66
incl.
RC/DD
Widgie 3
Infill
334
339
5.00
2.05
0.16
0.03
41
0.97
and
RC/DD
Widgie 3
Infill
349
350
1.00
1.77
0.12
0.03
65
0.92
23MERCD076
RC
Widgie 3
Infill
NSI
23MERCD077
RC
Widgie 3
Infill
NSI
23MERCD078
RC
Widgie 3
Infill
NSI
23MERCD079
RC/DD
Widgie 3
Infill
379
406.68
27.68
1.26
0.11
0.02
36
0.50
incl.
RC/DD
Widgie 3
Infill
404.29
406.68
2.39
6.56
0.68
0.09
322
2.12
23MERCD080
RC/DD
Widgie 3
Infill
369.26
377
7.74
2.94
0.28
0.04
74
1.24
incl.
RC/DD
Widgie 3
Infill
369.7
375.45
5.75
3.76
0.36
0.05
94
1.52
23MERCD081
RC/DD
Widgie 3
Infill
23MERCD082
RC/DD
Widgie 3
Infill
402
403
1.00
0.92
0.04
0.02
21
0.36
23MERCD083
RC/DD
Widgie 3
Infill
382
384.59
2.59
0.81
0.03
0.01
1042
0.68
and
RC/DD
Widgie 3
Infill
388
394.52
6.52
0.95
0.07
0.02
123
0.71
23MERCD084
RC/DD
Widgie 3
Infill
23MERCD085
RC/DD
Widgie 3
Infill
147
154
7.00
0.65
0.04
0.01
25
0.28
and
RC/DD
Widgie 3
Infill
153.58
165
11.42
1.33
0.19
0.02
59
0.58
23MERCD086
RC/DD
Widgie 3
Infill
149
150.12
1.12
1.11
0.05
0.02
15
0.61
23MERCD087
RC/DD
Widgie 3
Infill
208
211
3.00
1.28
0.13
0.02
133
0.94
23MERCD088
RC/DD
Widgie 3
Infill
192
193.85
1.85
4.65
0.25
0.06
3674
1.48
incl.
RC/DD
Widgie 3
Infill
193.55
193.85
0.30
17.0
0.18
0.25
1659
1.99
23MERCD089
RC
Widgie 3
Infill
220
221
1.00
2.62
0.14
0.03
16267
2.94
23MERCD090
RC
Widgie 3
Infill
NSI
23MERCD091
RC
Widgie 3
Infill
NSI
23MERCD092
RC/DD
Widgie 3
Infill
NSI
23MERCD093
RC
Widgie 3
Infill
NSI
23MERCD094
RC/DD
Widgie 3
Infill
NSI
23MERCD095
RC
Widgie 3
Infill
NSI
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
NSI
NSI
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
8
High Grade Widgie 3 Nickel Results
8 September 2023
Significant intercepts above 0.5% Ni, in places includes internal dilution to allow for grade continuity.
NSI = no significant intersection
Infill = intercepts within the area of the 2023 resource wireframe
RC = Reverse circulation, DD = Diamond Core Tail
3PGE = Au ppm + Pt ppm + Pd ppm
Table 2: Collar details for holes reported in this ASX announcement
Hole ID
Tenement
Prospect
Drill Type
Total Depth (m)
Easting
Northing
RL
Dip
Azi
23MEDD008
M15/94
Widgie 3
DD
294.8
366020
6512015
338
-57.7
243.2
23MERCD067
M15/94
Widgie 3
RC/DD
189.7
365889
6512155
326
-52.1
250
23MERCD068
M15/94
Widgie 3
RC/DD
241.9
365889
6512153
326
-57.7
234.8
23MERCD069
M15/94
Widgie 3
RC/DD
268
365891
6512154
326
-61.9
234.9
23MERCD070
M15/94
Widgie 3
RC/DD
258.8
365976
6512049
330
-52.1
241.8
23MERCD071
M15/94
Widgie 3
RC/DD
322
365978
6512050
330
-59.9
239
23MERCD072
M15/94
Widgie 3
RC/DD
261.7
365973
6512097
328
-50.9
238.8
23MERCD073
M15/94
Widgie 3
RC/DD
342.8
365975
6512098
328
-59.8
238.6
23MERCD074
M15/94
Widgie 3
RC/DD
302.6
365933
6512126
327
-59.7
238.7
23MERCD075
M15/94
Widgie 3
RC/DD
372.7
365956
6512155
326
-60.1
245
23MERCD076
M15/94
Widgie 3
RC
35
365815
6512184
329
-59.7
240.6
23MERCD077
M15/94
Widgie 3
RC
129
365841
6512202
327
-59.8
239.9
23MERCD078
M15/94
Widgie 3
RC
230
365884
6512231
327
-59.9
238.8
23MERCD079
M15/94
Widgie 3
RC/DD
426.9
365978
6512158
326
-61.3
236.4
23MERCD080
M15/94
Widgie 3
RC/DD
411.7
366009
6512099
327
-60.6
240.4
23MERCD081
M15/94
Widgie 3
RC/DD
501.8
366041
6512122
327
-60.2
241.3
23MERCD082
M15/94
Widgie 3
RC/DD
441.8
366056
6512075
332
-57.9
240.8
23MERCD083
M15/94
Widgie 3
RC/DD
417.6
366045
6512031
332
-59.6
239
23MERCD084
M15/94
Widgie 3
RC/DD
360.8
366022
6512017
340
-58.5
231.8
23MERCD085
M15/94
Widgie 3
RC/DD
171.8
365962
6512020
341
-50.1
246.2
23MERCD086
M15/94
Widgie 3
RC/DD
180.8
365964
6512020
342
-51.9
230.1
23MERCD087
M15/94
Widgie 3
RC/DD
219.9
365987
6511973
338
-60.8
240.9
23MERCD088
M15/94
Widgie 3
RC/DD
225.8
365986
6511972
341
-57.2
228
23MERCD089
M15/94
Widgie 3
RC
242
365988
6511970
340
-52.3
211.8
23MERCD090
M15/94
Widgie 3
RC
140
365990
6511929
347
-54
207.2
23MERCD091
M15/94
Widgie 3
RC
105
365990
6511929
347
-49.7
213.5
23MERCD092
M15/94
Widgie 3
RC/DD
172.6
365988
6511931
346
-53.6
231.8
23MERCD093
M15/94
Widgie 3
RC
205
366047
6511931
334
-53.9
224.3
23MERCD094
M15/94
Widgie 3
RC/DD
242.6
366045
6511931
331
-51.2
242.8
23MERCD095
M15/94
Widgie 3
RC
252
366058
6511941
330
-58.1
236.9
Co-ordinates and azimuths in MGA (GDA94) Zone 51
RC = Reverse circulation, DD = Diamond Core,
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
9
High Grade Widgie 3 Nickel Results
8 September 2023
Competent Person Statement
The information in this announcement that relates to exploration results and sampling techniques is based on and fairly
represents information and supporting documentation compiled by Mr William Stewart, who is a full-time employee of
Widgie Nickel Limited. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335).
Mr Stewart has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
Compliance Statement
The information in this report that relates to Exploration Results and Mineral Resources are extracted from the ASX Announcements
listed in the table below, which are also available on the Company’s website www.widgienickel.com.au.
Date
09/03/2022
04/04/2022
30/05/2022
27/06/2022
22/07/2022
28/07/2022
08/09/2022
15/12/2022
23/01/2023
13/02/2023
04/04/2023
08/05/2023
20/07/2023
27/07/2023
Title
Widgie grows Mt Edwards Nickel Resource
Strong Initial Assay Results at Gillett
Exploration drilling discovers new mineralization at Gillett
High-grade nickel sulphide discovery at Gillett North
Significant By-product assays for Gillett North discovery
Resource growth potential confirmed at Gillett North
Confidence in Gillett Grows with Impressive Assay Results
High Grade Results Provide Confidence of Growth at Gillett
Gillett Mineral Resource Expands in Size and Confidence
Growth Potential Enhanced Following Gillett Drill Results
Widgie South Nickel Exploration Success
Nickel Discovery South of Gillett Resource Underpins Growth
Unlocking Resource Growth at Widgie South
Widgie Townsite Grows Legs
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements and that all material assumptions and technical parameters underpinning the
estimates in the market announcements continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Persons’ findings are presented have not been materially modified from the
original market announcements.
Approved by: Board of Widgie Nickel Ltd
-ENDSFor further details please contact
Steve Norregaard
Managing Director
steve@widgienickel.com.au
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
Media Inquiries:
Shane Murphy
FTI Consulting
shane.murphy@fticonsulting.com
0420 945 29
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
10
High Grade Widgie 3 Nickel Results
8 September 2023
Table 1 information in accordance with JORC 2012: Mt Edwards Nickel Exploration
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code Explanation
Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling
Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities
or
mineralisation types (e.g., submarine nodules) may
warrant disclosure of detailed information.
Commentary
All new data collected from Widgie 3 discussed in this report is in
relation to the recently completed reverse circulation (RC) and
diamond drilling (DD) and sampling program conducted between May
12, 2023 and June 18, 2023.
All RC samples have been acquired at one metre intervals from a
chute beneath a cyclone on the RC drill rig. Sample size was then
reduced through a cone sample splitter. Two identical sub-samples
have been captured in pre-numbered calico bags, with typical masses
ranging between 2 and 3.5kg. Care was taken to ensure that both
original sub-samples and duplicate sub-samples have been collected
representatively, and therefore are of equal quantities. The remainder
of the sample (the reject) has been retained in the short term in
sample piles at the drill site.
Samples assessed as prospective for nickel mineralisation have been
assayed at single metre sample intervals.
A mineralised sample is defined as that which when tested in a
laboratory would be expected to have an assay returned above 0.3%
nickel.
DD samples of NQ2 size quarter core have been acquired according
to logged lithological and mineralisation boundaries at lengths
between 0.3 metres to 1.3 metres.
No other measurement tools related to sampling have been used in
the holes for sampling other than directional/orientation survey tools.
Base metal, multi-element analysis was completed using a 4-acid
digest with ICP-OES finish for 9 elements. PGE’s (Au, Pt and Pd)
analysis was completed via 25g charge Fire Assay with an ICP-MS
finish.
Drilling
Techniques
Drill type (e.g., core, reverse circulation, open- hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g., core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
Thirty (30) drillholes have been completed and reported in this
announcement for 11,971m.
The RC rig is a KWL350 with a face sampling auxiliary compressor
and booster. Drill rods are 6 metres long and drill bit diameter is
143mm, and hence so is the size of drillhole diameter. Holes have
been drilled at a nominal dip angle of -60° with varying azimuth angles
to orthogonally intercept the interpreted favourable geological
contact zones.
The DD rig is an Austex 1550 drilling NQ2 with standard tube. Core is
oriented using Reflex ACT III tool.
Drill Sample
Recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
The sample recovery is logged by a geologist during drilling, and
recoveries have been considered acceptable.
Minor sample loss was recognised while sampling the first metre of
some drillholes due to very fine grain size of the surface and nearsurface material.
No relationship between sample recovery and grade has been
recognised.
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
11
High Grade Widgie 3 Nickel Results
8 September 2023
Section 1 Sampling Techniques and Data
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
All RC drillholes have been geologically logged for lithology,
weathering, alteration, and mineralogy. All samples have been logged
in the field at the time of drilling and sampling (both quantitatively and
qualitatively where viable), with spoil material and sieved rock chips
assessed. All RC holes are photographed.
All DD holes have been geologically logged (both quantitatively and
qualitatively) for lithology, weathering, alteration and mineralogy and
sampled following drilling. All DD holes are photographed.
The total length of RC drilling for drilling as reported is 5,255 metres,
with a total of 6,715 metres of DD completed.
Geochemical analysis of each hole has been correlated back to
logged geology for validation.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The sample preparation technique carried out in the field is
considered industry best standard practice and was completed by the
geologist.
RC: Samples collected at 1 metre intervals from a cyclone-mounted
cone splitter to yield a 2 to 3 kg sub-samples.
DD: Samples of NQ2 size core at lengths between 0.3 metres to 1.3
metres have been cut with an Almonte core saw and quarter core
submitted for analysis. With the remaining ¾ core retained for
metallurgical testing.
Individual samples have been weighed as received and then dried in
a gas oven for up to 12 hours at 105°C.
Samples >3 kg’s have been riffle split 50:50 and excess discarded. All
samples have been then pulverised in a LM5 pulveriser for 5 minutes
to achieve 85% passing 75um. 1:50 grind checks have been
performed to verify passing was achieved.
A 300g split was taken at the bowl upon completion of the grind and
sent to the next facility for assay. The remainder of the sample (now
pulverised) was bagged and retained until further notice.
For each submitted sample, the remaining sample (material) less the
aliquot used for analysis has been retained, with the majority retained
and returned to the original calico bag and a nominal 300g portion
split into a pulp packet for future reference.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
12
High Grade Widgie 3 Nickel Results
8 September 2023
Section 1 Sampling Techniques and Data
Quality of assay
data and
laboratory tests
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g.,
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e., lack of bias) and precision have been
established.
Widgie Nickel has established QAQC procedures for all drilling and
sampling programs including the use of commercial Certified
Reference Material (CRM) as field and laboratory standards, field and
laboratory duplicates and blanks.
Nickel sulphide CRM samples have been inserted into the batches by
the geologist, at a nominal rate of 5% of the total samples.
Field duplicate samples have been taken in visibly mineralised zones,
at a rate of 2% of total samples.
Samples of blank material have been submitted immediately after
visibly mineralised zones at a nominal rate of 5% of the total samples.
Sample size is considered appropriate to the grain size of the material
being sampled.
Assaying was Intertek Genalysis with standards and duplicates
reported in the sample batches.
Individual samples have been assayed for a suite of 33 elements
including nickel related analytes as per the laboratory’s procedure for
a 4-acid digestion (HCL/HCLO4/HF/HNO3) followed by an Induced
Coupled Plasma Mass Spectrometry (ICP-OES) analytical technique.
PGE’s (Au, Pt and Pd) analysis was completed via Fire Assay with a
Mass Spectrometry (MS) finish.
Internal sample quality control analysis was then conducted on each
sample and on the batch by the laboratory.
Results have been reported to Widgie Nickel in CSV, PDF and SIF
formats.
A detailed QAQC analysis was carried out with all results assessed
for repeatability and meeting expected values relevant to nickel and
related elements. Any failures or discrepancies were followed up as
required.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes
The verification of significant intersections by either
independent or alternative company personnel.
Discuss any adjustment to assay data
Assay results are provided by the laboratory to Widgie Nickel in CSV,
PDF and SIF formats, and then validated and entered into the
database managed by an external contractor. Backups of the
database are stored both in and out of office.
Assay, Sample ID and logging data are matched and validated using
filters in the drill database. The data is further visually validated by
Widgie Nickel geologists and database staff.
Significant intersections are verified by senior Widgie Nickel
geologists.
There has been no validation and cross checking of laboratory
performance at this stage.
No adjustment of assay data has been undertaken.
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
A differential RTK DGPS and handheld GPS has been used to
determine the drillhole collar locations, accurate to within 0.1m and
3m respectively.
MGA94_51S is the grid system used in this program.
Downhole survey using Reflex Sprint IQ gyro survey equipment was
conducted during the program by the drilling contractor.
Downhole Gyro survey data have been converted from true north to
MGA94 Zone51S and saved into the data base. The formulas used
are:
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
13
High Grade Widgie 3 Nickel Results
8 September 2023
Section 1 Sampling Techniques and Data
Grid Azimuth = True Azimuth + Grid Convergence.
Grid Azimuth = Magnetic Azimuth + Magnetic Declination + Grid
Convergence.
The Magnetic Declination and Grid Convergence have been
calculated with and accuracy to 1 decimal place using plugins in
QGIS.
Magnetic Declination = 0.8
Grid Convergence = -0.7
Topographic control is provided by collar surveys drilled in this
campaign, and by either collar survey or historical topographic
surveys for historical data. Topographic control is considered
adequate.
Data spacing
and
distribution.
Data spacing for reporting of Exploration Results
All RC drillholes have been sampled at 1 metre intervals down hole
Share your feedback
Discover