WIN Metals Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
ASX:WIN
30 April 2025
March 2025 Quarterly Report
Highlights
Butchers Creek Gold Project – Updated Mineral Resource Estimate
Post the end of the Quarter the updated Butchers Creek Mineral Resource Estimate (MRE) delivered a significant
increase to the Indicated Resource category positioning the deposit for economic evaluation:
•
Butchers Creek updated Mineral Resource Estimate: 5.23Mt @ 1.91g/t Au for 321,000oz of Gold 1
•
Global MRE 5.63Mt @ 1.98g/t Au for 359,000oz of gold
•
Significant Increase in Indicated Resource: Indicated category up by 86% to 3.58Mt @ 2.24g/t Au for
258,000oz of Gold
•
Project De-Risked: Updated Resource significantly enhances confidence for future Economic Evaluation
Butchers Creek Gold Project – Step Out Drilling Success
Step out drilling at the Butchers Creek deposit confirmed mineralisation extends significantly beyond the 2021 MRE
with exploration hole 24BCRCD008 intersecting high-grade mineralisation 260m to the south of previous drilling:
•
Hole 24BCRCD008 returned 11m @ 3.01g/t Au from 446m, within 16.52m @ 2.10g/t gold from 447m 2
•
24BCRCD008 is 260m beyond the most southern drillhole of the 2021 MRE
•
Exploration success at Butchers Creek underscores project upside potential
Butchers Creek Gold Project – Exploration
Extensive work undertaken in reviewing previous results and relogging of historic core to inform future planned drill
programs:
•
Growth Focused 2025 Drill Program: Planned drilling to target high-priority, high-grade resource growth
targets, including Golden Crown (currently 0.4Mt @ 3.1g/t Au Inferred Mineral Resource 3) with recent
extensional drilling returning 6m @ 10.85g/t Au 4 140m below the current resource
•
Heritage survey scheduled: April survey ahead of the proposed drill program
Corporate
WIN is pleased to advise of the implementation of its new InvestorHub platform to provide better communication and
greater opportunities for shareholders and investors to interact directly with the Company. The Company plans to
regularly upload new content including ASX announcements, accompanying videos and other relevant material and
information.
View our hub and signup to receive updates from the InvestorHub: https://investors.winmetals.com.au/
ASX:WIN “WIN advances Butchers Creek towards development following resource update” released 16 April 2025
ASX:WIN “Butchers Creek Exploration Success- Step Out Drilling Unlocks Resource Potential” released 4 February 2025
3
ASX:WIN “Butchers Creek gold project MRE and exploration results - amended” released 11 September 2024
4
ASX:WIN “Golden Crown North Delivers High Grades and Growth Potential” released 25 November 2024
1
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
1
March 2025 Quarterly Report
30 April 2025
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to present its Quarterly Activities Report for the
period ended 31 March 2025.
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
"Another productive quarter for the WIN team. After concluding our maiden drill program at Butchers Creek we are
extremely pleased with the outcome of both the updated MRE and the success of the step out drill hole at both
Butchers Creek and our satellite resource at Golden Crown. A great outcome; firming up the resource base ahead of
development economic evaluation studies and in addition demonstrating the significant opportunities for further
resource growth both at Butchers Creek and other high-priority targets across our tenure. All this against an
appreciating AUD gold price testing new all time highs"
Butchers Creek Gold Project – Updated Mineral Resource Estimate
The Butchers Creek Gold Project (“Butchers Creek” or “the Project”) is located 30km south-east of Halls Creek in
the Kimberley region of Western Australia. Butchers Creek is a historic gold production centre. Previous production
from the Butchers Creek gold mine resulted in 52,000oz of gold being produced between 1995 and 1997.
Figure 1: Location of Butchers Creek Gold Project
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
2
March 2025 Quarterly Report
30 April 2025
This latest April 2025 MRE update increases the Global Mineral Resource to 359,000oz of gold at 1.98g/t Au, with
258,000oz gold at 2.24g/t Au representing 80% of the MRE classified as Indicated available for economic studies for
project development.
Table 1: Butchers Creek Gold Project Resource Summary
Deposit
Last Update
Butchers Creek
Apr-25
Golden Crown
Jun-21
Total
Resource Classification
Tonnes (Mt)
Au g/t
Contained Gold (Oz)
Indicated
3.58
2.24
258,000
Inferred
1.65
1.18
63,000
Inferred
0.40
3.10
38,000
Indicated + Inferred
5.63
1.98
359,000
Note: Figures are rounded and reported at 0.5g/t cut-off to 150m below surface (open pit) and 0.8g/t below 150m of surface
This update reflects the successful conversion of an additional 119,000oz at 2.24g/t Au into the indicated category
representing an 86% increase in indicated gold resource ounces compared to the 2021 MRE as demonstrated in
the waterfall chart in Figure 2 below.
Figure 2: Mineral Resource Changes by Classification
Figure 3 displays the grade tonnage curve for the Butchers Creek 2025 MRE, with a significant tonnage of 4.8Mt at
2.04g/t gold reporting above a cut-off of 0.7g/t Au.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
3
March 2025 Quarterly Report
30 April 2025
Figure 3: Butchers Creek 2025 MRE Grade Tonnage Curve
The Global Mineral Resource for the BCGP, incorporating both the Butchers Creek and Golden Crown deposits, now
stands at 5.63Mt at 1.98g/t Au for 359,000oz of contained gold with 72% of total resources classified as Indicated.
Table 2: Butchers Creek Gold Project Global Resources
Deposit
Last Update
Butchers Creek
Apr-25
Golden Crown
Jun-21
Total
Resource Classification
Tonnes (Mt)
Au g/t
Contained Gold (Oz)
Indicated
3.58
2.24
258,000
Inferred
1.65
1.18
63,000
Inferred
0.40
3.10
38,000
Indicated + Inferred
5.63
1.98
359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t Au cut-off
below 150m of surface. Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
Figure 3 illustrates Butchers Creek gold endowment from below the exisiting open pit to 500m vertically below
surface. Ounces Per Vertical Metres (OPVM) averages 972 at the base of the open pit to 320m vertically below
surface, with the resource remaining open and depth only constrained by lack of further drilling.
Figure 4: Butchers Creek Long Section looking north-west. Gold endowment displayed as ounces per vertical metre
(OPVM)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
4
March 2025 Quarterly Report
30 April 2025
Table 3: Butchers Creek Gold Resource Summary – Reported by Cut-Off parameters
Deposit
Butchers
Creek
Mining
Cut-Off
Grade
Resource
Classification
Tonnes
(Mt)
Au g/t
Contained
Gold (Oz)
OP
0.5
Indicated
1.50
1.99
96,000
Inferred
0.56
0.99
18,000
UG
0.8
Indicated
2.08
2.42
162,000
Inferred
1.09
1.27
45,000
Total Indicated
3.58
2.24
258,000
Total Inferred
1.65
1.18
63,000
Total
5.23
1.91
321,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m (+220mRL) below surface (370m RL) for open
pit “OP” and a 0.8g/t Au cut-off below 150m (-220mRL) of surface (370mRL) for underground “UG”.
Butchers Creek Gold Project – Step Out Drilling Success
Step out exploration drilling results confirmed mineralisation at Butchers Creek gold deposit remains continuous and
open at depth. Drill hole 24BCRCD008 returned 11m @ 3.01g/t Au some 260m to the south of previous drilling within
the 2021 MRE resource envelope. This intercept is within a broader zone of mineralisation returning 16.52m @ 2.10g/t
Au.
Figure 5: Exploration Results to South of Butcher Creek with 24BCRCD008 returning 11m @ 3.01g/t Au within a
broader zone of 16.52m @ 2.10g/t Au, 260m from the last resource drillhole BCRD480.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
5
March 2025 Quarterly Report
30 April 2025
Figure 6: Plan view of recent exploration drill results at Butchers Creek Deposit
Butchers Creek Gold Project – Exploration
With the 2024 drill programme now completed, all assay results have been returned. WIN is taking the opportunity to
reprocess all core drilled at the Butchers Creek Gold Project since 2020. Detailed geological, structural and
geotechnical logging continuing.
The 2025 field season has commenced with reconnaissance work to facilitate the upcoming heritage survey to cover
the planned 2025 drilling programs largely focused on resource growth at the Golden Crown gold deposit (currently
0.4Mt @ 3.1g/t Au Inferred Mineral Resource) with recent extensional drilling returned 6m @ 10.85g/t Au and
advancing high priority exploration prospects.
The Heritage Survey is scheduled for late April ahead of the proposed July drill program.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
6
March 2025 Quarterly Report
30 April 2025
Mt Edwards Nickel Project
WIN controls a dominant ~240 km2 land package over the prolific nickel-producing Widgiemooltha Dome in Western
Australia. The Mt Edwards Nickel Project is positioned adjacent to key infrastructure, located just 80km south of the
major regional centre of Kalgoorlie, 30km south-west of Kambalda.
The Mt Edwards Nickel Project is comprised of 12 separate deposits with a total MRE of 13.04Mt grading 1.45% nickel
for 188,160 tonnes 5.
In March 2024, the Company released a Scoping Study on the Mt Edwards Nickel Project 6. WIN Metals commissioned
the Scoping Study for the purpose of carrying out a preliminary assessment of the technical and financial viability of
a standalone nickel mining and processing operation.
Limited further testwork is being undertaken to investigate the potential and economics of downstream processing
options, to produce Nickel Sulphate or NCM battery precursor (pCAM).
No exploration activities at the Mt Edwards Nickel Project were reported during the March 2025 Quarter.
Table 4: WIN Metals Total Nickel Mineral Resources
Indicated
Deposit
Inferred
TOTAL Resources
Tonne (kt)
Nickel (%)
Tonne (kt)
Nickel (%)
Tonne (kt)
Nickel (%)
Nickel Tonnes
Gillett*
2,267
1.35
871
1.16
3,138
1.30
40,770
Widgie 3*
512
1.34
222
1.95
734
1.53
11,200
Widgie Townsite*
1,649
1.60
853
1.38
2,502
1.53
38,260
Armstrong*
949
1.45
10
1.04
959
1.44
13,820
132N
34
2.90
426
1.90
460
2.00
9,050
Munda
381
1.91
381
1.91
7,260
Cooke
154
1.30
154
1.30
2,000
Inco Boundary
464
1.20
464
1.20
5,590
McEwen
1,133
1.35
1,133
1.35
15,340
McEwen Hanging wall
1,916
1.36
1,916
1.36
26,110
Mt Edwards 26N
871
1.43
871
1.43
12,400
Zabel
272
1.94
53
2.04
325
1.96
6,360
TOTAL
5,683
1.48
7,354
1.42
13,037
1.45
188,160
All Resources reported at 1.0% Ni cut-off except for Widgie Townsite, Widgie 3, Gillett and Armstrong which are reported at
0.7% Ni cut- off. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
5
6
ASX Announcement– “Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN (Updated)” Released 23 July 2024
ASX Announcement– “Standalone Mt Edwards Project Scoping Study” Released 7 March 2024
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
7
March 2025 Quarterly Report
30 April 2025
Figure 7: Location map of Mt Edwards Nickel Project
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
8
March 2025 Quarterly Report
30 April 2025
Faraday-Trainline Lithium Project
The Faraday-Trainline Lithium Project is located in the “lithium corridor” between Mt Marion to the north and Pioneer
Dome to the south in Widgiemooltha, Western Australia. The project hosts the Faraday-Trainline Lithium Deposit as
well as four prospects Farson, Atomic 3, Voyager and Gemini.
Figure 8: WIN Metals lithium deposits and surrounding lithium prospects
The Faraday-Trainline lithium Mineral Resource Estimate (MRE) amounts to 1.96Mt @ 0.69% Li2O including a highgrade, near surface zone of 373kt @ 1.00% Li2O with a Measured and Indicated Mineral Resources total of 1.57Mt @
0.71% Li2O 7.
7
ASX Announcement “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
9
March 2025 Quarterly Report
30 April 2025
Table 5 - WIN Metals Mt Edwards Lithium Mineral Resource Estimates
Measured
Deposit
Indicated
Inferred
TOTAL Resources
Tonne (kt)
Li2O (%)
Tonne (kt)
Li2O (%)
Tonne (kt)
Li2O (%)
Tonne (kt)
Li2O (%)
Li2O Tonnes
Faraday
550
0.75
250
0.66
220
0.61
1,020
0.7
7,100
Trainline
-
-
780
0.69
160
0.63
940
0.68
6,300
TOTAL
550
0.75
1,020
0.68
390
0.62
1,960
0.69
13,500
Reported above a cut-off grade of 0.30% Li2O to a depth of 310mRL (65m below surface) and 0.50% Li2O below 310mRL to
250mRL. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
No exploration activities at the Faraday-Trainline Lithium Project were reported during the March 2025 Quarter.
Corporate
As at 31 March 2025, WIN held $1.972m cash at bank. Full details regarding the Company’s cash movements during
the Quarter can be found in the attached Appendix 5B.
The Company continues to manage its costs prudently including utilising its assets and expertise to offset WIN’s cost
base. The Company has entered into a 6 month lease arrangement with Auric Mining Ltd for the exclusive occupancy
of the Company’s camp facility at Mt Edwards in addition to carrying out sundry rehabilitation works in the
Widgiemooltha region.
Corporate information as at 31 March 2025:
ASX code
WIN
Board of Directors & Management
Quoted Ordinary shares on issue:
550,058,093
Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue:
-
Andrew Parker – Independent Non-Executive Chairman
Unlisted Options ($0.036 to $0.35):
174,467,208
Felicity Repacholi - Independent Non-Executive Director
Unlisted Performance Rights
18,300,000
Scott Perry - Independent Non-Executive Director
Share price range last 12 months:
$0.017 to $0.11
Share price at end of Quarter:
$0.018
Market cap (at $0.018):
$9.9m
Company Secretary - Graeme Scott
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled $577,451
Details of exploration activities undertaken during the Quarter are as described above and in this section.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development activities
undertaken during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial percentage
interest held in those Tenements at the end of the Quarter is included in the Table at the end of this as Appendix 1.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter totalled
$137,524. The payments were in respect of salaries and superannuation paid to the executive director and directors’
fees payable to the non-executive directors.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
10
March 2025 Quarterly Report
30 April 2025
Approved by: Board of WIN Metals Ltd
-ENDSFor further details please contact:
Steve Norregaard
Managing Director
WIN Metals Ltd
steve@winmetals.com.au
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
11
March 2025 Quarterly Report
30 April 2025
Competent Person Statement
The information in this announcement that relates to mineral resource estimates and exploration results is based on
information reviewed, collated and fairly represented by Mr William Stewart, who is a full-time employee of WIN
Metals Ltd. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335). Mr
Stewart has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears. Additionally, Mr Stewart confirms that the entity is not aware of any new information or data that materially
affects the information contained in the ASX releases referred to in this report.
Compliance Statement
The information in this report is extracted from the ASX Announcements listed in the table below, which are also
available on the Company’s website at www.winmetals.com.au and the ASX website www.asx.com under the code
WIN.
Number
Announcement
Date
ASX
Company
1
16-Apr-25
WIN
WIN advances Butchers Creek towards development following resource update
2
4-Feb-25
WIN
Butchers Creek Exploration Success- Step Out Drilling Unlocks Resource Potential
3
11-Sep-24
WIN
Butchers Creek gold project MRE and exploration results - amended
4
25-Nov-24
WIN
Golden Crown North Delivers High Grades and Growth Potential
5
23-Jul_24
WIN
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN (Updated)
6
7-Mar-24
WIN
Standalone Mt Edwards Project Scoping Study
7
8-Nov-23
WIN
375% Growth in Faraday-Trainline Lithium Mineral Resource
Announcement Title
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the market announcements continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have not been
materially modified from the original market announcements.
Forward Looking Statement
Caution regarding Forward Looking Information. This document contains forward looking statements concerning
WIN Metals Ltd. Forward looking statements are not statements of historical fact and actual events and results may
differ materially from those described in the forward-looking statements as a result of a variety of risks, uncertainties,
and other factors. Forward looking statements in this document are based on WIN's beliefs, opinions and estimates
as of the dates the forward-looking statements are made, and no obligation is assumed to update forward looking
statements if these beliefs, opinions, or estimates should change or to reflect other future developments.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
12
March 2025 Quarterly Report
30 April 2025
Appendix 1 – Tenement Interests
The changes in the Company’s tenement interests during the Quarter and as at 31 March 2025 are as reflected in the table
below. The Company has an interest in the following projects and tenements in Western Australia:
Project Name
Licence Name
Beneficial Interest
Status
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
M15/87
M15/699
P15/6362
P15/6387
P15/6539
E15/1749
P15/6570
P15/6612
L15/0426
M15/45
M15/46
M15/48
M15/74
M15/75
M15/77
M15/78
M15/79
M15/80
M15/94
M15/96
M15/97
M15/99
M15/100
M15/101
M15/102
M15/103
M15/105
L15/102
M15/478
M15/633
M15/653
M15/693
M15/698
M15/1271
L15/254
E15/989
L15/280
E15/1505
E15/1507
E15/1576
E15/1583
P15/6092
E15/1553
L15/0478
E80/6085
E80/6086
E80/4856
E80/4874
E80/4976
E80/5059
E80/5584
100% (*)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100%
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (^)
100% (^)
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (^)
100% (^)
100%
100% (^)
100% (^)
100% (#)
100% (^)
100% (#)
100% (#)
100%
100% (^)
100%
100%
100%
100% (#)
100% (#)
100% (#)
100% (#)
100%
100%
100%
100%
100%
100%
100%
100%
Live
Live
Live
Live
Pending
Live
Live
Live
Pending
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Pending
Pending
Pending
Live
Live
Live
Live
Live
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
13
March 2025 Quarterly Report
30 April 2025
Project Name
Licence Name
Beneficial Interest
Status
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
E80/5660
M80/0106
M80/0315
M80/0418
M80/0651>
P80/1839
P80/1854
P80/1855
P80/1884
100%
97%
97%
100%
100%
100%
100%
100%
100%
Pending
Live
Live
Live
Pending
Live
Live
Live
Pending
*Part of Nickel and Lithium Mineral rights only, ^Nickel Mineral rights only, # No gold interest
>
new applications made during the Quarter.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
WIN METALS LTD
ABN
Quarter ended (“current quarter”)
77 648 687 094
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 MARCH 2025
Current quarter
$A’000
Year to date (9
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs – net of project allocations
(123)
(484)
(e) administration and corporate costs
(210)
(793)
-
-
17
33
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
(2)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives –
R&D Tax incentive
-
856
1.8
Other (provide details if material)
17
38
1.9
Net cash from / (used in) operating
activities
(299)
(352)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(1,000)
(c) property, plant and equipment
(16)
(119)
(d) exploration & evaluation
(577)
(2,928)
(e) investments
-
-
(f)
1
(5)
other non-current assets –
Bonds/security deposits
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
15
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
925
(c) property, plant and equipment
-
45
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(592)
(3,082)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
4,031
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
2
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(268)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(13)
(50)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(13)
3,715
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,876
1,691
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(299)
(352)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(592)
(3,082)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(13)
3,715
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
16
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date (9
months)
$A’000
-
-
1,972
1,972
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
972
1,876
5.2
Call deposits
1,000
1,000
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,972
2,876
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
90
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
47
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
17
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
17
17
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
17
17
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
1 x 3 year secured finance lease agreement with Toyota Finance for an Isuzu truck at
5.59% pa commencing December 2022.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(299)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(577)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(876)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,972
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1,972
2.25
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions: