Highlights
•
Updated Mineral Resource Estimate: Butchers Creek Gold Mineral Resource
revised to 5.23Mt @ 1.91g/t Au for 321,000oz of Gold
•
Significant Increase in Indicated Resource: Indicated category up by 86% to
3.58Mt @ 2.24g/t Au for 258,000oz of Gold
•
Project De-Risked: Updated Mineral Resource significantly enhances confidence
for future Economic Evaluation
•
Growth Focused 2025 Drill Program: Planned drilling to target high-priority, highgrade resource growth targets, including Golden Crown (currently 0.4Mt @ 3.1g/t
Au Inferred Mineral Resource 1) with recent extensional drilling returned 6m @
10.85g/t Au 2
Heritage survey scheduled: April survey ahead of the proposed July drill program
•
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
“Our first update of the Butchers Creek Mineral Resource following the successful maiden drill
campaign completed late in 2024 has delivered an 86% increase in the Indicated Resource. This
paves the way for the Company to advance development studies while we continue to drill our
other high-priority, high-grade targets.
With readily accessible mineralisation located immediately below the shallow open pit
amenable to low-cost open pit mining methods, the opportunity to monetise this asset in the
current high gold price environment is now an imperative.
To complement this great outcome, the Company will continue to enhance the resource base
focussing on the Golden Crown area during the forthcoming dry season, building on the
promising high-grade drill intersections reported last year.
The significant achievements by WIN during the short time we have held this project, and the
opportunities we see in this underexplored goldfield in WA’s Kimberley region, provide a strong
foundation for our future growth.”
ASX:WIN “Butchers Creek gold project MRE and exploration results - amended” released 11 September
2024
2
ASX:WIN “Golden Crown North Delivers High Grades and Growth Potential” released 25 November 2024
1
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
1
WIN advances Butchers Creek towards development following resource update
16 April 2025
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to provide shareholders with
an updated Mineral Resource Estimate (“MRE”) for its flagship Butchers Creek Gold deposit,
part of the Butchers Creek Gold Project (“BCGP”) located in the East Kimberley region of
Western Australia.
This latest April 2025 MRE update increases the Mineral Resource to 321,000oz of gold at 1.91g/t
Au, with 258,000oz gold at 2.24g/t Au representing 80% of the MRE classified as Indicated
available for economic studies for project development.
Table 1: Butchers Creek Gold Resource Summary
Deposit
Butchers Creek
Total
Resource Classification
Tonnes (Mt)
Au g/t
Contained Gold (Oz)
Indicated
3.58
2.24
258,000
Inferred
1.65
1.18
63,000
Indicated + Inferred
5.23
1.91
321,000
Note: Figures are rounded and reported at 0.5g/t cut-off to 150m below surface (open pit) and 0.8g/t below 150m of
surface
This update reflects the successful conversion of an additional 119,000oz at 2.24g/t Au into the
Indicated category representing an 86% increase in Indicated gold resource ounces compared
to the 2021 MRE1 as demonstrated in the waterfall chart in Figure 1 below.
Figure 1: Mineral Resource Changes by Classification
Figure 2 displays the grade tonnage curve for the Butchers Creek 2025 MRE, with a significant
tonnage of 4.8Mt at 2.04g/t gold reporting above a cut-off of 0.7g/t Au.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
2
WIN advances Butchers Creek towards development following resource update
16 April 2025
Figure 2: Butchers Creek 2025 MRE Grade Tonnage Curve
The Global Mineral Resource for the BCGP, incorporating both the Butchers Creek and Golden
Crown deposits, now stands at 5.63Mt at 1.98g/t Au for 359,000oz of contained gold with 72%
of total resources classified as Indicated.
Table 2: Butchers Creek Gold Project Global Resources
Deposit
Last
Update
Butchers
Creek
Apr-25
Golden Crown
Jun-21
Total
Resource
Classification
Tonnes
(Mt)
Au
g/t
Contained Gold
(Oz)
Indicated
3.58
2.24
258,000
Inferred
1.65
1.18
63,000
Inferred
0.40
3.10
38,000
Indicated + Inferred
5.63
1.98
359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t
Au cut-off below 150m of surface. Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
Figure 3 illustrates Butchers Creek gold endowment from below the exisiting open pit to 500m
vertically below surface. Ounces Per Vertical Metres (OPVM) averages 972 at the base of the
open pit to 320m vertically below surface, with the resource remaining open and depth only
constrained by lack of further drilling.
Figure 3: Butchers Creek Long Section looking north-west. Gold endowment displayed as ounces per
vertical metre (OPVM)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
3
WIN advances Butchers Creek towards development following resource update
16 April 2025
Butchers Creek Gold Deposit – Mineral Resource Estimate
Update
The Butchers Creek Mineral Resource is reported according to the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012
edition.
Drilling from the 2024 field season was designed to increase confidence in the 2021 Butchers
Creek MRE, primarily by converting Inferred material to the Indicated resource category. In
addition, the program successfully extended the mineralisation envelope by 250m to the south
of the 2021 MRE.
The 2025 geological interpretation also incorporates the Western Synform mineralisation, a
previously unrecognised folded repeat of the western limb (Figure 4). This structural
interpretation presents an exciting opportunity to define a new exploration target for potential
additional mineralisation.
Figure 4 also demonstrates the volume variance between the 2021 and 2025 MRE models and
the improved grade constraint within the 2025 model.
Figure 4: 2021 MRE (left), 2025 MRE (mid) and section reference (right). Western Synform mineralisation
modelled looking north-east on 7970950mN section.
The 2025 Butchers Creek MRE update includes data from an additional thirteen (13) reverse
circulation (RC) and two (2) diamond holes (DD) completed during the 2024 field season and 15
drill holes completed by Meteoric Resources (ASX:MEI) after the release of the 2021 MRE. The
mineralisation domains have been re-modelled using all available drill data, albeit the estimate
has only been informed by DD and RC drill holes to ensure sampling error/grade smearing has
not been introduced by percussion or rotary air blast (RAB) drilling methods related primarily to
open pit mining activities. In total 2,996 composites were used to inform the 2025 MRE estimate.
The 2025 MRE has been reported as ‘open pit’ and ‘underground’ resources with cut-off grades
of 0.5g/t Au (to 150m below surface) and 0.8g/t Au used below 150m at a nominated level of
220mRL illustrated in Table 3 below.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
4
WIN advances Butchers Creek towards development following resource update
16 April 2025
Table 3: Butchers Creek Gold Resource Summary – Reported by Cut-Off parameters
Deposit
Mining
Cut-Off
Grade
OP
0.5
UG
0.8
Butchers
Creek
Resource
Classification
Tonnes
(Mt)
Au g/t
Contained
Gold (Oz)
Indicated
1.50
1.99
96,000
Inferred
0.56
0.99
18,000
Indicated
2.08
2.42
162,000
Inferred
1.09
1.27
45,000
Total Indicated
3.58
2.24
258,000
Total Inferred
1.65
1.18
63,000
Total
5.23
1.91
321,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m (+220mRL) below surface (370m
RL) for open pit “OP” and a 0.8g/t Au cut-off below 150m (-220mRL) of surface (370mRL) for underground “UG”.
Comparing the 2021 MRE to this updated 2025 MRE, the total ounces for Butchers Creek has
increased by 1% to 321koz. Importantly the Indicated resource component has increased by 86%
and now stands at 3.58Mt at 2.24g/t for 258koz which is available for conversion into Ore
Reserves following completion of the planned economic studies. Figure 5 below illustrates MRE
classification differences between the 2021 and 2025 MRE models. The 2025 MRE model has
increased the Indicated resource to the south and north under the existing pit.
Figure 5: MRE classification 2021 MRE (left) 2025 MRE (right) – green = indicated, red = inferred
A comparison between the 2025 to 2021 Butchers Creek MRE’s is illustrated in Figure 1 above. A
model comparison is also detailed in the following section.
The Competent Person (CP) believes the 2025 MRE is a reasonable representation of the style of
mineralisation at Butchers Creek.
Butchers Creek Gold Project Mineral Resource Commentary
The BCGP includes the 2025 MRE for the Butchers Creek deposit and the 2021 MRE for Golden
Crown as summarised illustrated in Table 2 above.
The total gold endowment at Butchers Creek in the 2025 MRE remains similar albeit the grade
has increased with improved mineralisation domaining and the use of two cut-off grades to
reflect open pitable (0.5g/t Au to 150m below surface) and underground (0.8g/t Au below 150m
of surface) material as opposed to the 2021 MRE that used a flat 0.8g/t Au cut-off grade.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
5
WIN advances Butchers Creek towards development following resource update
16 April 2025
Location and Project History
Butchers Creek deposit is within Mining Leases M80/106, M80/315, M80/418 and P80/1839,
located 30km south-east of Halls Creek in the Kimberley region of Western Australia. The project
is accessible via the Duncan Road that connects the BCGP to the town of Halls Creek and the
Great Northern Highway.
Figure 6: Location of Butchers Creek Gold Project
The Halls Creek region heralded Western Australia’s first gold rush in the 1890’s but has been
largely limited to small scale mining and artisanal activities until the 1990’s.
Gold production from the Butchers Creek open pit commenced in 1995 with the construction of
a 500ktpa conventional carbon in pulp gold ore processing plant, a 9Mt tails storage facility,
diesel power station and a 75-person accommodation camp and offices (Figure 7). Total
production from Butchers Creek open pit recorded 761,000t @ 2.09g/t Au for 52,000oz of gold
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
6
WIN advances Butchers Creek towards development following resource update
16 April 2025
produced until the operation was closed in late 1997 due to the low gold price at the time. The
Butchers Creek 500ktpa processing plant has since been decommissioned and mine site
rehabilitated.
Post closure of the mining operation in 1997, various public and private entities held the tenure
with exploration drilling in the ensuing period mostly carried out by Northern Star Resources in
2004 at Golden Crown and MEI between 2020 and 2022 at Butchers Creek. WIN Metals acquired
the project late in 2024 with its maiden drilling campaign informing the 2025 Butchers Creek MRE
update.
Figure 7: Butchers Creek gold processing plant. Circa 1996.
Figure 8: Butchers Creek open pit May 2024
Regional Geology and Mineralisation Interpretation
The BCGP is within the northeast-trending Halls Creek Orogen, comprising Paleoproterozoic
sediments, volcanics and intrusive rocks. The gold mineralisation at BCGP occurs along the
eastern zone of the orogen within the Butchers Gully Member of the Olympio Formation as
illustrated in Figure 9 below.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
7
WIN advances Butchers Creek towards development following resource update
16 April 2025
Figure 9: Regional geology of East Kimberley
The gold mineralisation at the Butchers Creek gold deposit is stratabound within a tightly folded
antiformal hinge zone of an intrusive syenite host. This is bound within a sedimentary package of
sandstones, siltstones and shales. The antiform hosting the mineralised syenite plunges at 20o25o to the southwest and is traceable over 1.5km to a vertical depth of 400m, with the down
plunge extent of the deposit limited by drilling. The geometry 3 of Butchers Creek is illustrated
below in Figure 10 below.
Figure 10: Schematic Section C, at Butchers Creek illustrating mineralisation geometry
3
ASX:WIN “Thick High Grade Intersected in Butchers Creek Infill Drilling ” released 10 December 2024
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
8
WIN advances Butchers Creek towards development following resource update
16 April 2025
Gold is strongly associated with potassic alteration and sulphide bearing quartz veins within the
syenite host unit. Several styles of quartz veining are present including saddle reefs, beddingparallel veins and flat-lying extensional veins. The syenite host unit is reported to be locally
displaced by cross cutting faults.
Since drilling was completed in 2024, WIN’s geologists have remodelled the Butchers Creek gold
deposit utilising newly acquired drill data focusing on the gold distribution within the syenite
host. In total eight (8) mineralisation domains were modelled within the syenite host to honour
the spatial grade populations within the geometry of the folded system. This ensures grade
smearing is reduced between the high-grade fold hinge and lower grade limbs of the fold.
The modelled mineralisation extends from the original pre-mining topography.
Mineralisation interpretations were informed by drill holes, comprising reverse circulation (RC),
diamond drilling (DD) and percussion (for interpretation only) drilling using Micromine software.
Eight (8) mineralisation domains have been modelled within the syenite host. Five (5) of these
using a 0.3g/t Au cut-off grade and three (3) high grade domains above 1.0g/t Au.
No weathering surfaces have been modelled as the mineralisation below the existing open pit
was considered to be fresh in nature.
Drilling Techniques
Historic Drilling prior to 2020
RAB (BCRB*) drilling was used to test low priority areas east of the open cut.
PERCUSSION (BCP*) drilling used a 5.5' hammer with a variety of rigs used including:
Warman 1000 and Warman 750.
REVERSE CIRCULATION (BCRC) drilling was mostly carried out between 1993-1994. A 5”
inch face sampling hammer was used. A variety of rigs were utilised, including a Schramm
685 and Warman 1000.
DIAMOND (BCD*) drilling was mostly NQ diameter core in earlier exploration (pre-1993)
and mostly HQ diameter core thereafter. Core was oriented by a Van Ruth ‘spear’.
MEI Drilling 2020-2022:
RC drilling was carried out using a McCulloch DR950 with a 5.7/8' face sampling hammer.
DD drilling was completed using a McCulloch DR950 drilling rig which produced HQ3
diameter core. The core was oriented using the TruCore UPIX tool and structural
measurements were collected in zones of mineralisation and/or zones of interest.
WIN Drilling 2024:
RC Drilling was carried out by Raglan Drilling utilising a truck mounted Schramm 685 with
a Sullair compressor and Air Research auxiliary booster compressor with a 5.625' face
sampling hammer. Down hole surveys were carried out utilising a Reflex north seeking gyro
tool.
DD drilling was carried out by Terra Drilling utilising a truck mounted Boart Longyear KWL
1600 producing NQ2 and HQ3 core. Core was orientated using an AXIS “Champ Ori”
Orientation tool and continuous down hole surveys were carried out using an Axis North
Seeking “Champ Gyro” tool.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
9
WIN advances Butchers Creek towards development following resource update
16 April 2025
Sampling and Sub-sampling Techniques
Historic Drilling prior to 2020
Historic Percussion (PERC) sampling was generally conducted at 1 m and 2 m intervals down the
drill holes. RC sampling was generally conducted at 1 m intervals within 10 m of, and throughout
the mineralisation, with 3 m composites collected in the sediments. Standard RC sampling
techniques at the time employed riffle splitters (a Jones splitter pre-1993) to split the samples.
DD sampling was generally conducted on 1 m samples down the drill hole, with occasional
samples < 1 m for specific geological intervals. A combination of half core and quarter core was
sampled.
MEI Drilling 2020-2022:
REVERSE CIRCULATION (RC) drilling was used to obtain 1 m samples from which a 3-5 kg subsample was split out and sent to the laboratory to be pulverised to produce a 50g charge for fire
assay.
DIAMOND CORE (DD) drilling was used to obtain 1 m samples from which 3-5 kg half-core
sample was cut and sent to the laboratory to be pulverised to produce a 50g charge for fire assay.
WIN Drilling 2024:
REVERSE CIRCULATION (RC) drilling was used to obtain 1 m samples from which a 3-5kg subsample was split and submitted to Bureau Veritas Laboratory in Canning Vale, Western Australia
for analysis. The samples were crushed, spilt and pulverised to produce a 40g charge for fire
assay and gold determined by Atomic Absorption Spectroscopy.
DIAMOND CORE (DD) drilling was cut in half in 0.3-1.3m intervals and submitted to Bureau
Veritas Laboratory in Canning Vale, Western Australia for analysis. The samples were crushed,
spilt and pulverised to produce a 40g charge for fire assay and gold determined by Atomic
Absorption Spectroscopy.
Database
The drill hole database for Butchers Creek and Golden Crown has been managed by multiple
companies. In 2020 MEI assumed control of the project with WIN Metals subsequently acquiring
this from MEI as announced in August 2024.
WIN has an internal database manager responsible for all data uploads and the exports relating
to the Butchers Creek database. This includes QAQC data compilation for the purposes of
analysis.
Drill hole data was extracted directly from the company’s Microsoft Access database which
includes internal data validation protocols.
Table 4: Drill holes Informing the 2025 MRE
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
Hole Type
Count
DD
55
PERC
87
RAB
54
RC
289
RCDD
33
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
10
WIN advances Butchers Creek towards development following resource update
16 April 2025
Historic PERC and RAB drilling were excluded from the dataset used for estimation. In addition,
some 29 drill holes were excluded from the estimate due to collar location uncertainty and/or
missing samples. These are listed in the Table 5 below.
Table 5: Drill holes excluded from the estimate
HOLE ID
Comment
BCD006
No sampling at start of hole
BCD082
Drilled straight down limb
BCD120
No Sampling
BCD173
Hole not sampled to end of mineralised contact
BCD231
Collar location appears wrong, intercept is to the east of mineralisation
BCD328
No Sampling
BCP007
No Sampling
BCP024
No Sampling
BCP026
Collar position likely to be incorrect
BCP028
Vertical hole, incorrect Azi
BCP061
Hole not sampled to end of mineralisation
BCP068
No confidence in collar location
BCP080
Hole not sampled to end of mineralisation
BCP103
No confidence in collar location
BCP108
No confidence in collar location
BCP109
No confidence in collar location
BCP114
No confidence in collar location
BCP117
No confidence in collar location
BCP141
No confidence in collar location
BCP152
No confidence in collar location
BCP157
Hole not sampled to end of mineralisation
BCP208
No confidence in collar location
BCRC281
No confidence in collar location
BCRC405
No sampling through mineralisation interval
BCRC415D
Intercept has min in wrong place through waste of anticline, incorrect survey
BCRC421
No confidence in collar location
BCP210
No confidence in collar location
BCRC247
No sampling through mineralisation interval
BCP139
No sampling through mineralisation interval
Sub Sampling Techniques
Historic Drilling prior to 2020
Historic DD samples: sections of half or quarter core were cut and sampled.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
11
WIN advances Butchers Creek towards development following resource update
16 April 2025
Historic RC/PERC samples: earlier exploration where referenced used a Jones splitter and
produced at least a 2kg sample for assay, while in later years a multi-deck riffle splitter was used
to produce a 2-3kg sample.
Historic wet samples were obtained by spearing and sent for analysis. More recently, samples
from the wet metres were dried and riffle split from which a 2-3kg sub-sample per meter was sent
for assay.
Historic sampling methods are considered appropriate for gold determination given the bulk
sample size.
Standard Industry practices support the above sampling protocols.
No information is provided around duplicate samples.
Sample sizes conform with industry standards for gold detection in PERC/RC and DD drilling
methods employed.
MEI Drilling 2020-2022:
DD core for sampling was systematically cut in half (using a cut line as a reference). The same
side of the cut line was submitted for analysis to maximise representivity. Where duplicate
samples were required, the half core was cut in half again and quarter core for the relevant
interval was submitted to the laboratory for analysis.
RC chips were split by individual metre at the drill rig into 3-5kg sub-samples using a rig mounted
cone splitter.
Both sampling methods are considered appropriate for gold determination given the sample size
and are supported by standard industry practices.
WIN Drilling 2024:
DD core for sampling was systematically cut in half using a cut line as a reference. The same side
of the cut line was submitted for analysis to maximise representivity. QAQC laboratory duplicate
samples were inserted at a rate of 1:50 samples selected by the WIN geologists. The laboratory
duplicates were obtained post crushing of the primary sample which was then split 50:50 to
produce a duplicate of the primary sample for analysis.
RC chips were split by individual metre at the drill rig into 3-5kg sub-samples using a rig mounted
cone splitter. QAQC laboratory duplicate samples were inserted at a rate of 1:50 selected by the
WIN geologists. The laboratory duplicates were obtained post crushing of the primary sample
that was then split 50:50 to produce a duplicate of the primary sample for analysis.
Both sampling methods are considered appropriate for gold determination given the sample size
and are supported by standard industry practices.
Sample Analysis QAQC Protocol WIN
WIN’s 2024 drill samples were sent to the Bureau Veritas laboratory located in Canning Vale,
Western Australia for analysis by fire assay with gold determination by atomic absorption
spectroscopy. QAQC measures have been implemented by WIN to test the laboratory’s
performance during the sample preparation stage (contamination between samples),
repeatability of results (laboratory duplicates) and instrument calibration (CRM standards).
WIN’s standard QAQC insertion rate is 1:20 for CRM standards, 1:20 for barren blank material
and 1:50 insertion rate for laboratory duplicates.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
12
WIN advances Butchers Creek towards development following resource update
16 April 2025
Sample Analysis Method
Historic Drilling prior to 2020
Historic assaying was carried out at reputable, accredited laboratories used extensively in the
mining and exploration industry at the time, including: Australian Analytical Laboratories (Perth): drying and total single stage milling before
Au determination by Fire Assay (50g charge), and Aqua Regia with an AAS finish.
Perth Assay Laboratories (Perth): Au determination by Fire Assay (50g charge).
Assay Corp Pty Ltd (Halls Creek, WA): Au determination by Fire Assay (50g charge).
PMA onsite laboratory (Halls Creek WA): Leachwell cyanide leach method assay +
Standard every 30 samples
Genalysis Laboratory services (Perth WA): check assays - Au determination by Aqua
Regia.
MEI Drilling 2020-2022:
Analysis was carried out by Australian Laboratory Services (Perth, WA), an accredited
Laboratory. Gold determination was by Fire Assay (50g charge).
Quality control samples were inserted every 20 samples with a mixture of standards, blanks and
duplicates. For RC, a duplicate sample was taken from the cone splitter. For DD where quarter
core was sampled, quarter core was submitted as a duplicate sample. Where half core was
sampled, quarter core was submitted as a duplicate sample. Where whole core was sampled,
no duplicate samples were submitted.
WIN Drilling 2024:
Analysis for DD and RC was carried out by Bureau Veritas (Canning Vale, Western Australia). The
samples were crushed, pulverised (90% passing 75um) with a 40g charge for fire assay and gold
determination by Atomic Absorption Spectroscopy finish.
Quality control samples were inserted at a rate of 1 in 20 (5%) primary samples with a mixture of
standards and blanks with lab duplicates inserted at a rate of 1 in 50 (2%) primary samples.
Table 6: 2024 Drilling QAQC Statistics
Sample Type
Sample Count
Insertion Rate %
Primary
1810
100
STD
92
5.1
BLK
83
4.6
Lab Duplicate
37
2.0
WIN uses Certified Reference Material (CRM) produced by GeoStats Pty Ltd and certified for Fire
Assay which are commercially available ‘off the shelf’.
Blank material is a sub 14mm crushed basalt sourced from a hardware store. This blank material
is not certified but is fit for purpose as deemed by the CP at a greatly reduced cost as opposed to
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
13
WIN advances Butchers Creek towards development following resource update
16 April 2025
basalt blank material purchased from CRM producers that is also uncertified and priced at a
premium.
Laboratory duplicates are sourced from primary samples that have been flagged by WIN
geologists to be a repeat of the primary sample. The primary sample is receipted, weighed and
dried before being crushed to minus 2mm. The primary sample flagged for a laboratory duplicate
is then split 50:50 to generate duplicate which is then pulverised and assayed to test repeatability
of the primary sample.
A total of 2,022 samples were submitted by WIN in 2024 with 1,810 primary and 212 QAQC
samples (CRM, blanks and laboratory duplicates). The results from each assay batch are
reviewed by WIN’s database geologist who will pass or fail the batch and flag any QAQC errors
with the assay laboratory. The following observations can be made:
•
•
•
Laboratory duplicates performed as expected with the nature of the mineralisation where
repeatability can be erratic
CRM results fall within acceptable limits
Blank samples demonstrate low levels of carry over contamination, thus the laboratory
demonstrates adequate hygiene at the sample preparation stage.
No umpire samples were submitted to an alternate laboratory for analysis.
Bulk Density
Bulk density values for the Butchers Creek deposit have been derived from 150 measurements
from all fresh diamond drill core utilising the industry standard water immersion technique. A
total of 122 measurements were made by WIN in fresh mineralisation returning an average of
2.73 t/m3 and 28 in fresh syenite and sediment waste samples returning an average of 2.73 t/m3.
Estimation Methodology Butchers Creek
The estimation was completed in Micromine by Ordinary Kriging. Exploratory Data Analysis (EDA)
and variography were completed in Micromine and Supervisor. Domaining was completed via
implicit modelling in Micromine.
The estimation was constrained within geology-grade based domains. The domains consist of a
low-grade envelope with an internal higher-grade subdomain. A total of eight domains were used
for the estimation (Table 7).
Table 7: Estimation domains used in 2025.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
Domain Code
Description
1000
low grade domain
1100
high grade domain
2000
low grade domain
2100
high grade domain
3000
low grade domain
3100
high grade domain
4000
low grade domain
P