375% Growth in Faraday-Trainline Lithium Mineral Resource
Released
Released
Announcement PDF
`
ASX Announcement
8 November 2023
375% Growth in Faraday-Trainline Lithium
Mineral Resource
Highlights
•
•
•
•
•
375% increase of Faraday-Trainline Lithium Mineral Resources to 1.96Mt @ 0.69% Li 2 O a
High-grade, near surface zone of 373kt @ 1.00% Li 2 O b
Measured and Indicated Mineral Resources total 1.57Mt @ 0.71% Li 2 O c
Mineralisation remains open at depth with the model only defined to a vertical depth of 130m
Exploration potential remains for repeat stacked pegmatites below the main Faraday and
Trainline mineralisation
Managing Director and CEO Mr Steve Norregaard commented “Widgie’s lithium endowment is now
shown in a true light. With a high-grade core and a significant portion of the resource identified to date
lying at less than 60m depth, readily amenable to low-cost open pit exploitation. This is now the
beginning of a true growth story as we focus on production in the foreseeable future with a clear
mandate to expand our lithium vision for the Company and its future.”
Faraday-Trainline Lithium Project MRE Update
Widgie Nickel Ltd (ASX: WIN) (“Widgie” or “the Company”) is pleased to announce the updated Mineral
Resource Estimate (MRE) for Faraday coupled with a maiden MRE for the Trainline Lithium Deposit,
reported in accordance with the 2012 JORC Code. Cube Consulting completed the MRE which has been
reported above a cut-off grade of 0.30% Li 2 O to a depth of 310mRL (65m below surface) and 0.50%
Li 2 O below 310mRL to 250mRL (Table 1).
Table 1: November 2023 Lithium MRE by classification and deposit
Deposit
Faraday
Trainline
Total
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
Classification
Measured
Indicated
Inferred
Sub Total
Tonnes (t)
550,000
250,000
220,000
1,020,000
Li2O (%)
0.75
0.66
0.61
0.70
Fe (%)
1.24
1.73
2.22
1.57
Li2O (t)
4,100
1,600
1,400
7,100
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Total
780,000
160,000
940,000
550,000
1,020,000
390,000
1,960,000
0.69
0.63
0.68
0.75
0.68
0.62
0.69
1.59
1.66
1.60
1.24
1.62
1.98
1.59
5,300
1,000
6,300
4,100
7,000
2,400
13,500
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
1
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Table 2: Faraday-Trainline MRE above 0.3% Li2O and above 310mRL
Deposit
Faraday
Trainline
Total
Classification
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Total
Tonnes (t)
550,000
250,000
30,000
830,000
780,000
110,000
890,000
550,000
1,020,000
150,000
1,720,000
Li2O (%)
0.75
0.66
0.48
0.71
0.69
0.64
0.68
0.75
0.68
0.60
0.70
Fe (%)
1.24
1.74
1.93
1.41
1.59
1.53
1.58
1.24
1.62
1.63
1.50
Li2O (t)
4,100
1,600
200
5,900
5,300
700
6,100
4,100
7,000
900
12,000
Table 3: Faraday-Trainline MRE above 0.5% Li2O and below 310mRL to 250mRL
Deposit
Faraday
Trainline
Total
Notes
a)
b)
c)
d)
Classification
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Total
Tonnes (t)
190,000
190,000
50,000
50,000
240,000
240,000
Li2O (%)
0.63
0.63
0.61
0.61
0.63
0.63
Fe (%)
2.27
2.27
1.95
1.95
2.20
2.20
Li2O (t)
1,200
1,200
300
300
1,500
1,500
Maiden Resource Proves Up Faraday DSO Stater Pit Opportunity 29/03/2023 Li2O unit comparison
0.85% Li2O cut-off
Reporting 0.30% Li2O cut-off grade above 310mRL, 0.5% Li2O cut-off grade below 310mRL
Tonnes and grades have been rounded to reflect the relative uncertainty of the estimate
Table 4 and Figure 1 demonstrates the grade/tonnage relationship for the November 2023 Faraday-Trainline MRE
at varying cut-offs.
Table 4: Faraday-Trainline MRE Grade Tonnage above 310mRL
Li2O% Cut Off Grade
0.3
0.4
0.5
0.6
0.7
0.8
0.85
0.9
1.0
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
Tonnes
1,722,800
1,691,900
1,420,000
1,076,500
749,700
474,200
379,900
271,500
149,000
Li2O%
0.70
0.70
0.75
0.81
0.88
0.96
1.00
1.05
1.13
T: +61 8 6381 7250
F: +61 8 6381 7299
Li2O (t)
12,000
11,900
10,600
8,700
6,600
4,600
3,800
2,900
1,700
info@widgienickel.com.au
www.widgienickel.com.au
2
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Figure 1: Faraday-Trainline Grade Tonnage Curve above 310mRL
Notes
•
No depth related RPEEE cut-off grade is applied to the table above
•
Tonnes and grades have been rounded to reflect the relative uncertainty of the estimate
•
Tonnes and Li2O grades will not match reported MRE due to RPEEE cut off constraints
The November 2023 Faraday-Trainline MRE was informed by 17,277m of Reverse Circulation(RC)
drilling (419 holes) and 460m of diamond drilling (DD) (13 holes) carried out in late 2022 and 2023
(Figure 2), which has allowed for a detailed interpretation of the geology and mineralisation ( Figure 4 and
Figure 5).
Approximately 1,000kg of representative lithium-bearing diamond core has been collected for
variability test-work to determine mineralogy and metallurgical characteristics across the entire
deposit, confirming the ability to produce a saleable concentrate with excellent metallurgical
recoveries as previously reported 1 .
1
Maiden Resource Proves Up Faraday DSO Starter Pit Opportunity 29/03/2023
Figure 2: Faraday-Trainline block model displaying Li2O % and drilling (black traces) – Oblique view looking north-east
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
3
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
A cut-off grade of 0.30% Li 2 O has been chosen to reflect Reasonable Prospects for Eventual Economic
Extraction (RPEEE) of the MRE assuming shallow open pit mining above 310mRL. An elevated cut-off
grade of 0.50% has been applied to material below 310mRl to the bottom of the mineral resource at a
vertical depth of 130m to reflect increased mining costs associated with potential underground mining
operation. This is aligned with cut-off grades applied for the reporting of lithium mineral resources
hosted in spodumene-rich pegmatites currently being mined elsewhere in Australia.
Faraday-Trainline Lithium Project Location
The Faraday-Trainline Lithium Project area is located on Mining Lease M15/102, 4km west north-west
of the Widgiemooltha townsite. Access to the project is via the Coolgardie-Norseman Rd, 63km south
of Coolgardie. The Faraday-Trainline Lithium deposits are central to Widgie Nickel’s Mt Edwards
Project, covering a significant land holding within the “Lithium Corridor” between Mt Marion to the north
and Pioneer Dome to the south (Figure 3).
Figure 3: Regional Geology showing Faraday Lithium Project, and surrounding lithium projects.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
4
375%
Growth in Faraday-Trainline Lithium Mineral Resource
`
8 November 2023
Figure 4: Faraday MRE block model section 6515620mN looking north (left) and plan view section location map (right)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
5
375%
Growth in Faraday-Trainline Lithium Mineral Resource
`
8 November 2023
Trainline
Faraday
Figure 5: Trainline MRE block model section 6516060mN looking north (left) and plan view section location map (right)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
6
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Future Exploration and Activities
Future exploration work will focus on defining potential stacked pegmatites at depth within the
favourable ultramafic unit below defined mineralisation in addition to extending the known
mineralisation down dip to the west.
Infill drilling to 20m x 20m at Trainline to be completed to provide increased level of confidence in the
geology and mineral resource.
Desktop studies have commenced on the wider exploration potential for Lithium within Widgie’s tenure.
This will be a major focus for the exploration team going into 2024.
Variability testing of mineralisation at both deposits to confirm overall metallurgical characteristics is
underway to guide the most appropriate processing routes.
Mine design for an expanded operation will now be undertaken to determine ultimate pit limits and an
optimised exploitation strategy.
Summary of JORC 2012 Table 1
A summary of JORC Table 1 for the Faraday-Trainline Lithium Project (Included as Appendix 2) is
provided below for compliance with the Mineral Resource and in-line with the requirements for ASX
listing Rule 5.8.1.
Geology and Mineralisation Interpretation
The tenements cover the northern margin of the Widgiemooltha Dome. The mineralisation is hosted in
stacked lithium-caesium-tantalum type (LCT) pegmatites associated with fractionated late-stage
granitic intrusions. Faraday and Trainline refer to the southern and northern pegmatite areas
respectively, separated by a late-stage, cross cutting east-west dolerite intrusive that truncates the
pegmatites bodies.
The stacked pegmatite veins have intruded the steeply dipping mafic/ultramafic country rock and dip
shallowly to the west at 15 o to 25 o and are found to be outcropping in places. Six sets of anastomosing
pegmatite veins were interpreted which extend along strike for approximately 750m in a north-south
direction with widths varying from 1m up to 23m and an average thickness overall of 6m. The pegmatites
are open at depth and currently the pegmatite interpretations extend 380m down dip at Faraday and
540m at Trainline, which approximates to 130m vertically at both areas.
Within the pegmatites, eleven lithium mineralised zones were defined using a nominal cut-off grade of
between 0.25 and 0.30% Li 2 O. The mineralised domains vary in thickness with an average overall
thickness of 4.5m.
Drilling Techniques and Spacing
The drilling database used to define the Mineral Resource comprises 419 RC drillholes for a total of
17,277m, with a total of 8,230 assays, and 13 DD drillholes for a total of 460m (Table 5). The diamond
holes were only used for density measurements. RC drilling was undertaken using a face-sampling
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
7
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
percussion hammer with a 143mm bit. Diamond core was drilled at either HQ or PQ size for
metallurgical and geotechnical purposes.
Table 5: Drilling Faraday-Trainline Lithium Project.
Drill type
RC
DD
Total
Year
2022
2023
2022
2023
Number of Drillholes
18
401
2
11
432
Metres drilled
1,090
15,727
61
399
17,277
Assays
485
7,618
0
127
8,230
The Faraday starter pit area has been drilled to 10m x 10m and 20m x 20m immediately to the west.
Step out drilling has been drilled at 80m centres down dip to the west. Trainline has been drilled to
80m x 80m with infill drilling of the high-grade core at 40m x 40m (Figure 6).
Trainline
Faraday
Figure 6: Faraday and Trainline Drill Density (red drill collars) with MRE block model
Sampling Techniques
Samples have been obtained from RC drilling only. All RC drillholes were logged on 1m intervals. RC
samples were derived from a cone sample splitter on the rig with an additional two sub-samples were
captured at the same time. All samples were recorded as dry. The diamond core was logged in detail,
with observations based on lithological boundaries.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
8
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Sampling Analysis
RC samples (2 to 3.5kg) were sorted, weighed and dried. Samples greater than 3kg were riffle split and
the excess discarded. All samples were then pulverised to -75μm to produce a homogenous
representative sub-sample for analysis. Samples for holes MERC241-MERC258 were prepared by
Auralia Metallurgy located in Midvale, Western Australia. Samples for holes 23MERC001-23MERC080
were prepared by Intertek in Kalgoorlie, Western Australia.
Holes MERC241-MERC258 were assayed by Nagrom commercial Laboratories located in Kelmscott,
Western Australia. 19 elements were assayed via a 2-stage analysis. Peroxide Fusion Digest with ICPOES finish for Li, B, Be, Cs, Rb. Li Borate fusion with XRF finish for Al, Ba, Ca, Fe, K, Mg, Mn, Nb, P, S,
Sn, Sr, Ta, W.
Holes 23MERC001-23MERC080 were assayed by Intertek in Perth, using Inductively Coupled Plasma
Optical Emission Spectrometry, following a modified and simplified four acid digest and ICP-OES finish
for Li only. It came to the attention of Widgie Staff a discrepancy had resulted between the Fusion and
4-Acid digest methods 2 . This resulted in the 4-Acid method understating the Li 2 O grade by up to 63%.
As a result, all samples were re-assayed via the sodium peroxide fusion digest with ICP-OES finish.
2
Higher grade Li thium to c ome on the cusp of bein g shove l rea dy at Faraday 27/10/2023
Estimation Methodology
Samples were composited for Li 2 O%, Cs ppm, Fe%, Nb ppm, Rb ppm and Ta 2 O 5 ppm to 1m within each
estimation domain using best fit length option and a threshold inclusion of samples at sample length
50% of the targeted composite length. A geostatistical analysis was conducted to determine the
influence of any extreme values resulting in very minor top capping applied to Cs ppm, Nb ppm, and
Ta 2 O 5 ppm.
Variogram modelling was undertaken for the composited data for all domains with sufficient data to
produce robust variograms. All variogram models were undertaken by transforming the composite data
to Gaussian space, modelling a Gaussian variogram, and then back-transforming the Gaussian models
to real space for use in interpolation. For domains with geostatistically insignificant number of data
points, variograms models were adopted from the modelled variograms and the orientation modified
accordingly.
A Kriging Neighborhood Analysis (“KNA”) and the domain widths and orientation were used to
determine the most appropriate block size and other estimation parameters such as minimum and
maximum samples, discretisation, and search distance to be used for the estimation. An estimation
block size for the area closely spaced drilling (mostly 10m x 10m) at Faraday was 5m (X) × 5m (Y) × 2m
(Z) and for the remaining areas at Faraday and all of Trainline defined by wider spaced drilling the parent
block size used was 20m (X) × 20m (Y) × 4m (Z) and for volume resolution, sub-blocking was set to
2.5m (X) × 2.5m (Y) × 0.5m (Z).
Grade estimation used Ordinary Kriging with hard domain boundaries and parameters optimised for
each domain based on the variogram models. For Li 2 O%, the domain boundaries included the lithiummineralised zones within the pegmatites and also the surrounding poorly mineralised material within
each pegmatite. Each of the whole pegmatites represented hard boundaries for the estimation of Cs
ppm, Fe%, Nb ppm, Rb ppm and Ta 2 O 5 ppm. Dynamic anisotropy (“DA”) was used for all grade
estimates to account for the undulating nature of the pegmatites. The grade estimates used two passes
with the first pass search distance of between 50 and 120m and the second pass using three times the
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
9
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
first pass distance. The minimum number of samples was set to six and the maximum number of
samples set to 16.
An in-situ density of 2.67 t/m3 was applied to the pegmatites based on 93 determination
measurements.
Mineral Resource Classification
The Faraday-Trainline Project Mineral Resource has been classified as Measured, Indicated and
Inferred based on the basis of confidence in geology, mineralogy and grade continuity, consideration of
the quality of the sampling and assay data and confidence in the estimation of Li 2 O. The area at Faraday
defined by 10m x 10m drilling has been classified as Measured and this extends for approximately 300m
along strike and 125m down dip. Indicated material at Faraday includes 20m and 40m spaced drilling
immediately surround the Measured material. At Trainline, the Indicated material is defined by 40m
spaced drilling. At both Faraday and Trainline, Inferred material is defined as 80m spaced drilling and
some minor material representing down dip and along strike interpretation extrapolation was not
classified based on the lack of supporting data.
Cut-off Grades and Reasonable Prospects of Eventual Economic Extraction (RPEEE)
The Mineral Resource estimate for the Faraday and Trainline Lithium deposits has been reported above
a cut-off grade of 0.3% Li 2 O above the 310mRL and a cut-off grade of 0.5% Li 2 O below the 310mRL.
The reporting elevation of 310mRL is approximately 65m below surface and represents the portion of
the Mineral Resource that may be considered for eventual economic extraction by open pit methods;
no pit constraint has been applied. This cut-off grade is commensurate with cut-off grades applied for
reporting of lithium Mineral Resources hosted in spodumene-rich pegmatites elsewhere in Australia.
For material below the 310mRL, an elevated reporting cut-off grade of 0.5% Li 2 O has been applied and
only material displaying sufficient continuity and width that would be typically amenable to
underground mining has been included for reporting.
Mining Factors
There has been no historical production from this deposit and no modifying factors were applied to the
Mineral Resource. The mineralisation is largely suitable for open-pit mining. The interpreted lithium
mineralised pegmatites extend to a maximum of 130m vertically and underground mining maybe be
considered where appropriate.
Mineralogy
Cube Consulting has inspected core from hole 23MEDD011, 23MEDD012 and 23MEDD013 at Widgie’s
core processing premises in Carlisle, Perth. The contacts between country rock and pegmatite were
noted to be sharp, and spodumene was visually identified in the core. Other typical LCT pegmatite
minerals, such as tourmaline, mica, quartz, plagioclase feldspar and albite were observed.
As previously reported 2 a spatially representative selection of samples (17) was submitted to Intertek
Genalysis Laboratory in Perth, Western Australia, for quantitative XRD mineral analyses to determine
Lithium bearing minerals. Spodumene was the only lithium bearing mineral identified within the
analysis substantiating field observations.
Samples from several holes were submitted for quantitative XRD mineral analyses. Spodumene was
estimated to range between 9 and 29% by mass (Table 6). No other lithium bearing minerals were noted.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
10
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Table 6: Key minerals identified by XRD
Sample ID
M27445
M27457
M27471
M27479
M27517
M27523
M27607
M27646
M27654
M27663
M27667
M27685
M27689
M27743
M27799
M27803
Mica %
6
4
4
10
5
7
6
5
7
8
8
5
5
8
8
K Feldspar %
8
11
11
11
12
12
11
8
10
10
14
12
11
15
10
Quartz %
29
34
26
30
27
24
28
27
27
27
28
26
26
29
30
28
Na Plagioclase %
23
24
34
27
33
34
28
33
48
37
28
30
31
26
21
16
Spodumene %
22
17
12
12
13
9
18
19
12
11
17
14
16
21
16
29
A further 33 samples have been submitted to Intertek Genalysis Laboratory in Perth, Western Australia,
for quantitative XRD mineral analyses to determine lithium bearing minerals. Results are pending,
albeit the Company expects similar mineral assemblage to that of Faraday based on field observations.
Metallurgical Factors
No further metallurgical test work has been complete. All test-work results have been previously
reported 3 , 4 .
Heavy liquid separation testing, a proxy for heavy media separation has been carried out on Faraday
samples. The results of this initial series of tests confirm that saleable concentrate grades of 5.55.75% Li 2 O are achievable at metallurgical recoveries of spodumene ranging from 78.4% down to
62.3% 1 . Further flowsheet development test work utilising flotation has achieved 81.0% lithium
recovery to a 6.3% Li 2 O flotation concentrate 3 .
A further three (3) diamond PQ diameter drill holes (2 holes at Trainline and 1 hole at Faraday) have
been drilled for further metallurgical test work to determine lithium recovery via flotation and HLS and
variations incorporating both extraction methods. This work has commenced.
3
4
Faraday Metallurgical Testwork-Excellent Flotation Response 02/08/2023
Faraday Mining Proposal A pproved 04/08/2023
Mine Design
Mine design has been completed for a Small Mining Proposal approved by DMIRS in August 2023 4 . A
larger scale mine design is now required to sufficiently optimise a significantly larger resource as
outlined in this report.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
11
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Next Steps for the Faraday Lithium Project
Work remains ongoing with:
o Infill drilling to upgrade geological classification where classification dictates.
o Mine design and scheduling work to determine ultimate pit limits and accompanying site layout.
o Permitting – for an expanded mining plan, a revised mining proposal lodgement and completion of
accompanying Project Management Plan and closure plan components.
o Metallurgical test work to confirm resource upgrading via varying methodologies i.e. ore to 5.5%
Li 2 O concentrate and or potential intermediate lower grade products.
Competent Persons Statements:
The information in this report that relates to Mineral Resource for the Faraday-Trainline deposit was
prepared by Mr Mark Zammit, who is a full-time employee of Cube Consulting Pty Ltd (Cube) and is a
Member of the AIG. Mr Zammit has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which is an undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Zammit consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to exploration results and sampling techniques is
based on and fairly represents information and supporting documentation compiled by Mr William
Stewart, who is a full-time employee of Widgie Nickel Limited. Mr Stewart is a member of the Australian
Institute of Metallurgy and Mining (member no 224335) and Australian Institute of Geoscientists
(member no 4982). Mr Stewart has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
Forward Looking Statements
This announcement includes forward-looking statements that are only predictions and are subject to
known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of Widgie Nickel Limited, the directors and the Company’s management. Such
forward-looking statements are not guarantees of future performance.
Examples of forward-looking statements used in this announcement include use of the words ‘may’,
‘could’, ‘believes’, ’estimates’, ‘targets’, ’expects’, or ‘intend’ and other similar words that involve
risks and uncertainties. These statements are based on an assessment of present economic and
operating conditions, and on a number of assumptions regarding future events and actions that, as at
the date of announcement, are expected to take place.
Actual values, results, interpretations or events may be materially different to those expressed or
implied in this announcement. Given these uncertainties, recipients are cautioned not to place reliance
on forward-looking statements in the announcement as they speak only at the date of issue of this
announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules,
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
12
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Widgie Nickel Limited does not undertake any obligation to update or revise any information or any of
the forward-looking statements in this announcement or any changes in events, conditions or
circumstances on which any such forward-looking statement is based.
This announcement has been prepared by Widgie Nickel Limited. The document contains background
Information about Widgie Nickel Limited current at the date of this announcement. The announcement
is in summary form and does not purport to be all inclusive or complete. Recipients should conduct
their own investigations and perform their own analysis in order to satisfy themselves as to the
accuracy and completeness of the information, statements and opinions contained in this
announcement.
The announcement is for information purposes only. Neither this announcement nor the information
contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the
purchase or sale of shares in any jurisdiction. The announcement may not be distributed in any
jurisdiction except in accordance with the legal requirements applicable in such jurisdiction.
Recipients should inform themselves of the restrictions that apply to their own jurisdiction as a failure
to do so may result in a violation of securities laws in such jurisdiction.
This announcement does not constitute investment advice and has been prepared without taking into
account the recipient’s investment objectives, financial circumstances or particular needs and the
opinions and recommendations in this announcement are not intended to represent recommendations
of particular investments to particular persons.
Recipients should seek professional advice when deciding if an investment is appropriate. All securities
transactions involve risks, which include (among others) the risk of adverse or unanticipated market,
financial or political developments. To the fullest extent of the law, Widgie Nickel Limited, its officers,
employees, agents and advisers do not make any representation or warranty, express or implied, as to
the currency, accuracy, reliability or completeness of any information, statements, opinion, estimates,
forecasts or other representations contained in this announcement. No responsibility for any errors or
omissions from the announcement arising out of negligence or otherwise is accepted.
Compliance Statement
The information in this report that relates to Exploration Results are extracted from the ASX
Announcements listed in the table below, which are also available on the Company’s website
www.widgienickel.com.au.
Date
Title
08/12/2022
Initial Assays Confirm High Grade Lithium Discovery at Faraday
09/01/2023
Further Assays Reaffirm High-grade Lithium Discovery at Faraday
14/02/2023
Widgie Fast-tracks Faraday Li 2 O Deposit for DSO Opportunity
29/03/2023
Maiden Resource Proves Up Faraday DSO Stater Pit Opportunity
08/05/2023
Faraday Mining Proposal Lodged
04/07/2023
New lithium Discoveries Position Widgie for Resource Growth
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
13
375% Growth in Faraday-Trainline Lithium Mineral Resource
8 November 2023
Date
Title
02/08/2023
Faraday Metallurgical Testwork-Excellent Flotation Response
04/08/2023
Faraday Mining Proposal Approved
27/09/2023
Higher grade Lithium to come on the cusp of being shovel ready at Faraday
02/10/2023
Drilling Delivers High-grade Lithium at Trainline
26/10/2023
Material Uplift in Faraday Lithium Grades
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and
technical parameters underpinning the estimates in the market announcements continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original market
announcements.
Approved by: Board of Widgie Nickel Ltd
-ENDSFor further details please contact:
Steve Norregaard
Managing Director
steve@widgienickel.com.au
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Clois
Share your feedback
Discover