Widgie Nickel Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
31 July 2023
June 2023 Quarterly Report
Highlights
•
Advancing the value from both the lithium and nickel assets at the Mt Edwards Project, with the lithium DSO
mining and offtake opportunity approaching fruition and a more substantial nickel project shaping up.
•
Succesfully completed a strongly supported $12 million placement to fund the continued growth and
development of the Mt Edwards Project.
Lithium
•
Mining Proposal lodged for the Faraday Direct Shipped Ore (DSO) lithium mining operation, with approval
expected shortly.
•
Exploration drilling directly north of Faraday unearthed a new near surface lithium prospect post-quarter, the
Trainline prospect, underpinning strong potential to increase lithium resources.
•
Offtake discussions for the DSO product progressed positively during the Quarter and are nearing the final
stages.
Nickel
•
New significant nickel discovery south of the existing Gillett Resource, proving that mineralisation continues
in an area previously considered “closed off”:
23MERCD017
30m @ 1.17% Ni, 0.14% Cu, 0.03% Co, 0.04 g/t Au, 0.11 g/t Pd, 0.09 g/t Pt from 214.0m
inc 5.0m @ 2.07% Ni, 0.29% Cu, 0.06% Co, 0.13g/t Au, 0.25g/t Pd, 0.22g/t Pt from 214.0m
and 11m @ 1.57% Ni, 0.18% Cu, 0.05% Co, 0.03g/t Au, 0.10g/t Pd, 0.11g/t Pt from 232.0m
•
•
•
High-grade nickel results at Munda including:
MEDD026
12.46m @ 2.05% Ni from 329.6m
Incl. 6.06m @ 3.20% Ni from 336.0m
MERC163
1m @ 4.35% Ni from 59m
MERC167
6.12m @ 4.39% Ni from 246.25m
Incl. 2.55m @ 7.08% Ni from 249.45m
Significant nickel Mineral Resource upgrade targeted for the current half on the back of these strong results.
Armstrong deposit nearing development ready status, however Widgie will now also consider an alternative
of incorporating Armstrong as part of a more substantive integrated nickel mining operation.
Widgie Nickel Limited (ASX:WIN) (“Widgie” or “the Company”) is pleased to present its Quarterly Report for the period
ended 30 June 2023.
Widgie Nickel Managing Director Steve Norregaard commented;
“Widgie has ended the financial year in a very strong position, poised for near term production via lithium DSO with
substantial nickel resource growth in the pipeline.
In less than 8 months since the maiden drill result at Faraday we have swiftly developed a lithium DSO project that is on
the cusp of production. The final pieces of the DSO production puzzle, mining approval and an offtake agreement, are
expected to be in place soon. The discovery of Trainline, and the further extension potential uncovered at Faraday,
suggests there is substantial upside of our lithium endowment within the broader Mt Edwards Project.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
1
June 2023 Quarterly Report
31 July 2023
Backed by the funds from a successful capital raising at market price, a high-potential lithium DSO operation, and
continued nickel exploration success, we are sharpening our focus on developing a more substantial nickel project than
previously planned which will be anchored in the Widgie South Resource area with a standalone concentrator.
While Armstrong is nearing production ready status, our increased funding capacity potential via DSO and market appetite
for the deposit’s ore means we are now incorporating Armstrong in our broader nickel concentrate plan to unlock the full
value potential of the deposit rather than be compelled to do a less than optimal deal. We regard Armstrong to be a
quality resource with excellent attributes.
The 2024 financial year will no doubt be a big one for Widgie and with consolidation emerging in the Kambalda nickel
region, Mt Edwards’ inherent value across two critical minerals continues to grow rapidly.”
New Lithium Discovery & DSO Opportunity Advancing Towards Production
Following exploration drilling during the Quarter, post-quarter on 4 July 2023 Widgie announced it had unearthed a new
near surface lithium prospect directly to the north of the Faraday Lithium Deposit (“Faraday”). The new prospect was
named Trainline.
In addition, at the Faraday deposit itself, 80 metre step out drilling to the west downdip demonstrated that mineralisation
continues at depth. Overall, the drill results indicate strong potential to increase lithium resources#. Further XRD analysis
indicates that spodumene* is the exclusive lithium bearing mineral. The drilling results at Trainline and Faraday included:
Trainline Discovery:
•
23MERC118
and
incl.
•
23MERC114
Incl.
•
23MERC113
Incl.
2m @ 0.86% Li2O from 4m
9m @ 0.82% Li2O from 17m
4m @ 1.19% Li2O from 22m
10m @ 0.68% Li2O from 43m
7m @ 0.79% Li2O from 43m
7m @ 0.61% Li2O from 30m
3m @ 0.94% Li2O from 30m
Faraday Extension:
•
23MERC129
and
•
23MERC131
Incl.
and
•
23MERC132
#
and
Incl.
1m @ 0.89% Li2O from 23m
3m @ 0.63% Li2O from 92m
3m @ 0.63% Li2O from 99m
1m @ 1.20% Li2O from 100m
4m @ 0.47% Li2O from 105m
2m @ 0.55% Li2O from 130m
5m @ 0.69% Li2O from 137m
3m @ 0.87% Li2O from 137m
Maiden Faraday resource 481,000t at 0.59% Li2O at 0.3% Li2O cut-off
*XRD mineral identification of 16 samples, identifies spodumene as the exclusive lithium bearing mineral
These discoveries came less than four months after Widgie announced its maiden Mineral Resource Estimate at
Faraday (refer to ASX release dated 29 March 2023). The Faraday-Trainline Lithium Project area is located on Mining
Lease M15/102, 4km west north-west of the Widgiemooltha township. Access is via the Coolgardie-Norseman Rd, 63
kilometres south of Coolgardie. Faraday and Trainline are central to Widgie’s Mt Edwards Project, covering a significant
land holding within the “Lithium Corridor” between Mt Marion to the north and Pioneer Dome to the south (Figure 1).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
2
June 2023 Quarterly Report
31 July 2023
Figure 1 - Regional Geology showing Faraday and Trainline Lithium Project location, and surrounding lithium Projects
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
3
June 2023 Quarterly Report
31 July 2023
The Trainline lithium prospect is located approximately 100m to the north of Faraday as illustrated in Figure 2.
Figure 2 - Plan view of Faraday - Trainline Lithium Project. Displaying drill location and cross cutting dolerite intrusive.
Further work and infill drilling is required to fully understand the geometry and nature of mineralisation of the LCT
pegmatite at Trainline. Additional infill drilling down dip at Faraday is required to expand the boundaries of
mineralisation and in turn provide an updated Mineral Resource Estimate (MRE).
Widgie intends to consider its initial lithium resource base as a Direct Shipped Ore (DSO) operation. The Company has
progressed DSO product offtake discussions to the final stages, with an agreement expected to be in place shortly. With
preparatory work well advanced and permitting on foot the Company anticipates mining will be able to commence
shortly after offtake negotiations are concluded and the mining proposal is approved.
High-Grade Nickel Results at Munda
On 26 June 2023, Widgie was pleased to announce it had received high-grade assay results from its recently completed
drilling campaign at the Munda nickel deposit. Munda is one of the 12 nickel deposits within the flagship Mt Edwards
Project. High grade nickel mineralisation intercepts included:
MEDD026
12.46m @ 2.05% Ni from 329.6m
Incl. 6.06m @ 3.20% Ni from 336.0m
MERC163
1m @ 4.35% Ni from 59m
MERC167
6.12m @ 4.39% Ni from 246.25m
Incl. 2.55m @ 7.08% Ni from 249.45m
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
4
June 2023 Quarterly Report
31 July 2023
Additionally, further exploration success was achieved, with basal nickel mineralisation discovered 200 metres to the
east of Munda deposit:
MERC259
6m @ 0.81% Ni from 115m
Incl. 2m @ 1.12% Ni from 115m
The Company sees Munda as a complimentary satellite operation to the proposed Mt Edwards nickel operation, which
will be centred at Widgie South and is currently the subject of feasibility studies. Given the existing significant nickel
endowment of approximately 170kt of contained nickel (Indicated and Inferred Resources) across the entire Widgie
Nickel portfolio, Munda with its high tenor mineralisation and low contaminant Arsenic levels has potential to contribute
high-quality ore to a larger scale, and/or longer life operation. The Munda mineral resource currently stands at 508kt @
1.9% Ni for 9398 Ni t @ 1% Ni cut-off (or 320kt at 2.2% Ni for 7,040t of contained nickel @ 1.5% Ni cut-off).
Reinterpretation of the Munda 3D geological model has highlighted parallel high-grade mineralised shoots not
previously understood. The Munda infill drilling will aid in increasing the confidence of the future resource re-estimate
increasing the proportion of Indicated resources at Munda for future economic studies.
Enticingly, Munda remains open at depth and exploration success with MERC259 (6m at 0.81% Ni) 200m to the east of
Munda’s M4 mineralised shoot unlocks a significant search space for further Munda style mineralisation shoots to be
discovered. Further work is required to fully understand the context of MERC259 mineralisation. Compilation of Munda
drill data will be utilised to update the Munda MRE during the forthcoming half and assist with future resource and
further exploration drilling.
Figure 3 – Munda longsection looking South – 2023 Geology interpretation with historic significant intercepts
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
5
June 2023 Quarterly Report
31 July 2023
Nickel Discovery South of Gillett Resource Underpins Growth
On 5 May 2023, Widgie announced significant results at the Gillett Resource and surrounding areas, proving that
mineralisation continues to the south of Gillett, an area previously considered “closed off”.
The assay results were received from Widgie’s recent Reverse Circulation (RC) and Diamond drilling (DD) program
consisting of both infill and extensional drilling.
Significant nickel intercepts included:
23MERCD017
30m @ 1.17% Ni, 0.14% Cu, 0.03% Co, 0.04 g/t Au, 0.11 g/t Pd, 0.09 g/t Pt from 214.0m
inc 5.0m @ 2.07% Ni, 0.29% Cu, 0.06% Co, 0.13g/t Au, 0.25g/t Pd, 0.22g/t Pt from 214.0m
and 11m @ 1.57% Ni, 0.18% Cu, 0.05% Co, 0.03g/t Au, 0.10g/t Pd, 0.11g/t Pt from 232.0m
23MERCD010
and
4.31m @ 1.14% Ni, 0.16% Cu, 0.04% Co, 0.04 g/t Au, 0.17 g/t Pd, 0.09 g/t Pt from 225.67m
4.35m @ 2.77% Ni, 0.39% Cu, 0.08% Co, 0.22g/t Au, 0.31g/t Pd, 0.17g/t Pt from 233.99m
23MERCD022
7.41m @ 1.63% Ni, 0.20% Cu, 0.05% Co, 0.04 g/t Au, 0.25 g/t Pd, 0.11 g/t Pt from 214.0m
Assay results from 23MERCD017, have extended the known nickel mineralisation approximately 100 metres beyond
previous drillhole MERC121 and 65 metres beyond the current resource wireframes to the south. Gillett is continually
proving to be a prime location for resource growth remaining open to the north and south.
With minimal historical drilling a new 3D interpretation of this area led to drilling the high-grade discovery hole
23MERCD017.
Infill drilling results at Gillett continue to reaffirm confidence in the Resource estimates and will be used in conjunction
with the drilling at Gillett North and South to re-estimate the Resource during the forthcoming half.
Figure 4 –Gillett long section looking Southeast – Significant intercepts shown
The latest results, demonstrate high-grade mineralisation beyond the current Gillett deposit, complementing Widgie’s
previous results at Gillett announced in mid-February reaffirming grade continuity within the current deposit.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
6
June 2023 Quarterly Report
31 July 2023
Strong exploration results at the broader Widgie South area, encompassing the Widgie Townsite, Widgie 3 and Gillett
deposits, as well as the Gillett North prospect, were released at the beginning of the June quarter on 4 April 2023 and
outlined previously in the March quarterly.
These results are all expected to feed into a significant nickel MRE upgrade at Gillett in the current half.
Images 1 & 2 – Drilling undertaken at the Gillett deposit and broader Widgie South area continues to impress.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
7
June 2023 Quarterly Report
31 July 2023
Corporate
Capital Raising
Towards the end of May 2023 Widgie raised approximately A$12 million in gross proceeds via a Placement issue of
46,153,847 new fully paid ordinary shares at an issue price of A$0.26 per share. The issues were made under the
Company’s existing placement capacity (21,017,564 shares under ASX Listing Rule 7.1 and 25,136,283 shares under
ASX Listing Rule 7.1A).
The Placement received strong support from new and existing institutional and sophisticated investors including the
introduction of Virtue Investments Corporation (VIC) as a 9.9% shareholder. VIC is a subsidiary of Ascend Global
Investment Fund SPC (AGIF SPC) – Strategic SP.
VIC Rights
Whilst VIC holds at least a 5% equity, securities or convertible interest in Widgie, VIC will have a first right of refusal in
relation to future debt financing. In addition, the Company will use its best endeavours to facilitate VIC’s participation in
future equity offers. These rights are subject at all times to prevailing ASX Listing Rules and compliance with applicable
laws.
Where VIC holds at least a 9.5% interest in Widgie, and if Widgie seeks to expand its Board of Directors, the Company
will consider in good faith the appointment of one VIC representative to the Board.
Cash Position
As at 30 June 2023, Widgie held approximately $11.8 million in cash. Full details regarding the Company’s cash
movements during the Quarter can be found in the attached Appendix 5B.
Corporate information as at 30 June 2023:
ASX code:
WIN
Board of Directors:
Quoted Ordinary shares on issue:
297,516,675
Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue:
-
Unlisted Options ($0.20 to $0.40):
10,650,000
Felicity Repacholi-Muir - Independent non-executive Director
Unlisted Performance Rights
943,000
Scott Perry - Independent non-executive Director
Share price range since listing:
$0.185 to $0.67
Share price at end of Quarter:
$0.22
Company Secretary:
Market cap (at $0.22):
$65.5m
Graeme Scott
Andrew Parker – Independent non-executive Chairman
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled $3,701,217
Details of exploration activities undertaken during the Quarter are as described above and in this section.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development activities undertaken
during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial percentage
interest held in those Tenements at the end of the Quarter is included in the Table at the end of this as Appendix 1.
ASX Listing Rule 5.3.4: The Company provides its actual expenditure on the individual items in the two year “use of
funds” statement outlined in its Prospectus dated 18 August 2021 and an explanation of any material differences:
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
8
June 2023 Quarterly Report
31 July 2023
Use of funds $A’000
Prospectus
Actual
Variance
2 years
1 July 2021 to 30 Jun
2023
Feasibility studies
$12,713
$13,021
($308)
Exploration
$4,544
$5,999
($1,455)
Corporate and
administration
$3,112
$2,449
$663
Capital expenditure
$319
$1,983
($1,664)
Cash expenses of the
Offer
$1,575
$2,174
($599)
Total uses
$22,263
$25,626
($3,363)
Prospectus
Actual
Variance
2 years
1 July 2021 to 30 Jun
2023
Drilling - Resource and
extensional
$8,762
$9,456
($694)
Test work
$860
$315
$545
Study work and
approvals
$3,091
$3,250
($159)
Total Feasibility
Studies
$12,713
$13,021
($308)
Additional breakout of Feasibility studies costs above:
Use of funds $A’000
Quarter activities snapshot
Drilling activities at the Mt Edwards Project were maintained during the Quarter with a diamond drill rig operating
predominantly on a 24/7 basis with the RC rig operating continuously on a single shift basis.
Early RC drilling in the Quarter focused on the Faraday-Trainline lithium project area exploration and extension program
before moving back to the pre-collars for the resource infill and development programs at 132N and Widgie 3 deposits.
The Diamond rig was focussed on the resource programs at 132N, Widgie 3 and Widgie Townsite in addition to follow
up exploration and infill drilling at Gillett North and South. One Diamond hole was drilled at Faraday for metallurgical.
testing purposes. The Company continued to focus significant effort on the potential lithium DSO opportunity at Faraday
including mineralogical analysis, metallurgical test work and mine planning with the Mining Proposal lodged with DMIRS
in early May.
Work on the Armstrong feasibility study work was well progressed at the end of the Quarter. Dewatering of the
Armstrong pit was suspended at end of April due to pump failure. It is estimated that there are 4 weeks of pumping
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
9
June 2023 Quarterly Report
31 July 2023
remaining. The pump contractor is addressing the issue with pumping expected to resume in late July. Delays were
encountered associated with pit access, inclement weather and availability of resources.
Metallurgical testwork programs to determine the most appropriate flowsheet for Armstrong on the assumption of
standalone processing were well advanced with various specific aspects being addressed to maximise metallurgical
recovery, minimise diluents and maximise concentrate grades. The aim of this work is to then replicate testing on each
Resource thus confirming the overall efficacy over the entire Mt Edwards nickel resource portfolio. This work remains
ongoing as at the end of the Quarter. Dealings with potential offtake partners was ongoing.
With Armstrong nearing development-ready status, emboldened by the results from the Widgie South deposits resource
development and infill programs, a further Scoping Study, not contemplated by the Prospectus, has commenced over
Widgie South. This envisions a more substantive nickel mining operation incorporating the Widgie South deposits
(comprising Widgie 3, Widgie Townsite, Gillett and Gillett North), Armstrong and 132N supported by a standalone nickel
concentrator.
Metallurgical testing of Faraday lithium ore was also undertaken and remains ongoing. Specifically, potential offtake
partners were provided with representative ore samples to allow them to conduct their own testing/due diligence in
addition to the Company doing further confirmatory Heavy Liquid Separation testing, flotation testing and testing to
determine upgrading potential with ore sorting. The latter ore sorting and floatation testing results were incomplete as
at the end of the Quarter.
Variance commentary
Whilst the lithium initiatives were not contemplated under the Company’s Prospectus and the successful discoveries of
additional mineralisation at Gillett North and South has resulted in additional drilling and supporting costs the Company
does not expect that these activities will prevent the Company from achieving its development objectives.
The Company has incurred significantly higher capital expenditure than was planned in the IPO Prospectus use of funds.
The additional costs incurred include the installation and operation of its own onsite accommodation facilities which
houses all site staff (costing approximately $700,000). Whilst these facilities weren’t originally planned, bringing these
facilities and some activities in house minimises travel time and the associated risks with travel prior to and after a
workday, which in turn provides greater flexibility and control to Widgie. In addition, the Company has also purchased
various plant and equipment, including two second hand low hour Volvo L90H loaders at a cost of $493,500. The
addition of these vehicles and other equipment to the Company’s plant and equipment list in the interim enables the
Company to undertake drill pad preparation and rehabilitation works in an efficient manner rather than rely on ad-hoc
contractors. In the medium to longer term the loaders will likely become part of the Company’s mining fleet.
Consistent with our industry peers, Widgie has also incurred increased staff and associated costs above that planned
through higher rates and use of contractors above that assumed in the use of funds.
Following the Company’s success in discovering lithium mineralisation at Faraday-Trainline project and the exploration
success and ongoing delineation of mineralisation at Gillett and Gillett North, the Company has seen higher levels of
expenditure in drilling activities than that originally budgeted, specifically the Prospectus year two expenditure which
contemplated a reduction in drilling activity which hasn’t eventuated.
In its Prospectus the Company had prioritised 6 deposits for infill Diamond and RC drilling to increase the Mineral
Resource confidence. To the end of the Quarter the Company has completed drilling and updated Mineral Resource
Estimates for Armstrong (November 2022) and Gillett (January 2023), drilling has been completed at Munda, are well
advanced towards completion at Widgie Townsite and Widgie3, and all preparatory work completed for the 132N drill
program.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
10
June 2023 Quarterly Report
31 July 2023
Image 3- 132n Pit with camp and logging facility in background and Armstrong pit water being discharged into open pit in
the foreground.
Nickel Exploration work was focussed at Gillett North and Gillett South following the discovery holes in May 2022 and
April 2023 respectively and continues to be focussed in this area and across the Widgie South trend. Widgie has
previously completed ground geophysics programs over a number of the other identified prioritised exploration targets,
however as an advent of the ACHA 2021 legislation implementation these areas now require heritage agreement and
clearances prior to drill testing. The Company continues to work diligently through this process.
As detailed elsewhere in this Report, in May 2023 the Company has completed a further $12 million capital raising which
will fund these additional activities and completion of the IPO programs.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter totalled $158,000.
The payments were in respect of salaries and superannuation paid to the executive director and directors’ fees payable
to the non-executive directors.
Approved by: Board of Widgie Nickel Ltd
-ENDSFor further details please contact:
Steve Norregaard
Managing Director
steve@widgienickel.com.au
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
Media Enquiries
Shane Murphy
FTI Consulting
shane.murphy@fticonsulting.com
0420 945 291
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
11
June 2023 Quarterly Report
31 July 2023
Competent Person Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
and supporting documentation compiled by Mr William Stewart, who is a full-time employee of Widgie Nickel Limited.
Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335). Mr Stewart has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Compliance Statement
The information in this report are extracted from the ASX Announcements listed in the table below, which are also
available on the Company’s website at www.widgienickel.com.au and the ASX website www.asx.com under the code
WIN.
4/07/2023
26/06/2023
22/05/2023
8/05/2023
8/05/2023
4/04/2023
New Lithium Discoveries Position Widgie for Resource Growth
High Grade Nickel Results at Munda
Widgie Completes Strongly Supported A$12 Million Placement
Faraday Mining Proposal Lodged
Nickel Discovery South of Gillett Resource Underpins Growth
Widgie South Nickel Exploration Success
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the market announcements continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have not been
materially modified from the original market announcements.
Forward Looking Statement
Caution regarding Forward Looking Information. This document contains forward looking statements concerning
Widgie Nickel Limited. Forward looking statements are not statements of historical fact and actual events and results
may differ materially from those described in the forward-looking statements as a result of a variety of risks,
uncertainties, and other factors. Forward looking statements in this document are based on Widgie's beliefs, opinions
and estimates as of the dates the forward-looking statements are made, and no obligation is assumed to update forward
looking statements if these beliefs, opinions, or estimates should change or to reflect other future developments.
Appendix 1 – Tenement Interests
There were no changes in the Company’s tenement interests during the Quarter. As of 30 June 2023, the Company
has an interest in the following projects and tenements in Western Australia:
Project Name
Licence Name
Beneficial Interest
Status
Mt Edwards
M15/87
100% (**)
Live
Mt Edwards
M15/699
100% (#)
Live
Mt Edwards
P15/5905
100% (#)
Live
Mt Edwards
P15/5906
100% (#)
Live
Mt Edwards
M15/1899
100% (#)
Pending
Mt Edwards
P15/6362
100% (#)
Live
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
12
June 2023 Quarterly Report
31 July 2023
Mt Edwards
P15/6387
100% (#)
Live
Mt Edwards
E15/1665
100% (#)
Pending
Mt Edwards
P15/6408
100% (#)
Live
Mt Edwards
P15/6539
100% (#)
Pending
Mt Edwards
E15/1749
100% (#)
Live
Mt Edwards
E15/1929
100% (#)
Pending
Mt Edwards
E15/1864
100% (#)
Pending
Mt Edwards
P15/6570
100% (#)
Live
Mt Edwards
P15/6612
100% (#)
Live
Mt Edwards
L15/0426
100%
Pending
Mt Edwards
M15/45
100% (^)
Live
Mt Edwards
M15/46
100% (^)
Live
Mt Edwards
M15/48
100% (^)
Live
Mt Edwards
M15/74
100% (#)
Live
Mt Edwards
M15/75
100% (#)
Live
Mt Edwards
M15/77
100% (^)
Live
Mt Edwards
M15/78
100% (^)
Live
Mt Edwards
M15/79
100% (^)
Live
Mt Edwards
M15/80
100% (^)
Live
Mt Edwards
M15/94
100% (^)
Live
Mt Edwards
M15/96
100% (#)
Live
Mt Edwards
M15/97
100% (#)
Live
Mt Edwards
M15/99
100% (#)
Live
Mt Edwards
M15/100
100% (#)
Live
Mt Edwards
M15/101
100% (#)
Live
Mt Edwards
M15/102
100% (#)
Live
Mt Edwards
M15/103
100% (^)
Live
Mt Edwards
M15/105
100% (^)
Live
Mt Edwards
L15/102
100%
Live
Mt Edwards
M15/478
100% (^)
Live
Mt Edwards
M15/633
100% (^)
Live
Mt Edwards
M15/653
100% (#)
Live
Mt Edwards
M15/693
100% (^)
Live
Mt Edwards
M15/698
100% (#)
Live
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
13
June 2023 Quarterly Report
31 July 2023
Mt Edwards
M15/1271
100% (#)
Live
Mt Edwards
L15/254
100%
Live
Mt Edwards
E15/989
100% (^)
Live
Mt Edwards
L15/280
100%
Live
Mt Edwards
E15/1505
100% (#,@)
Live
Mt Edwards
E15/1507
100% (#,@)
Live
Mt Edwards
E15/1576
100% (#)
Live
Mt Edwards
E15/1583
100% (#)
Live
Mt Edwards
P15/6092
100% (#)
Live
Mt Edwards
E15/1553
100% (#)
Live
**Lithium and Nickel Mineral rights only
^Nickel Mineral rights only
# No gold interest
@ Gold Rights in