New Lithium Discoveries Position Widgie for Resource Growth
Released
Released
Announcement PDF
ASX Announcement
4 July 2023
New Lithium Discoveries Position
Widgie for Resource Growth
Key Highlights
•
•
•
•
•
Exploration drilling north of the Faraday Lithium Deposit unearths a new near surface lithium prospect - Trainline
At Faraday, 80m step out drilling to the west downdip demonstrates mineralisation continues at depth
Drill results indicate strong potential to increase lithium Resources# at the Mt Edwards Project
XRD analysis reports spodumene* as the exclusive lithium bearing mineral
Following submission of the Faraday Mining Proposal offtake discussions are rapidly advancing
Trainline Discovery:
•
23MERC118
and
incl.
•
23MERC114
Incl.
•
23MERC113
Incl.
2m @ 0.86% Li2O from 4m
9m @ 0.82% Li2O from 17m
4m @ 1.19% Li2O from 22m
10m @ 0.68% Li2O from 43m
7m @ 0.79% Li2O from 43m
7m @ 0.61% Li2O from 30m
3m @ 0.94% Li2O from 30m
Faraday Extension:
•
23MERC129
•
23MERC131
and
Incl.
and
•
23MERC132
and
Incl.
#
1m @ 0.89% Li2O from 23m
3m @ 0.63% Li2O from 92m
3m @ 0.63% Li2O from 99m
1m @ 1.20% Li2O from 100m
4m @ 0.47% Li2O from 105m
2m @ 0.55% Li2O from 130m
5m @ 0.69% Li2O from 137m
3m @ 0.87% Li2O from 137m
Maiden Faraday resource 481,000t at 0.59% Li2O at 0.3% Li2O cut-off
*XRD mineral identification of 16 samples, identifies spodumene as the exclusive lithium bearing mineral
Managing Director and CEO Mr Steve Norregaard commented:
“Widgie’s lithium endowment shows it has exceptional growth potential with wide spaced intercepts at Trainline showing
excellent promise in addition to the expanding Faraday deposit. Our next steps will be to infill Trainline and the Faraday
down dip extensions.
Ongoing evaluation of offtake partnership options is nearing a logical conclusion, with interest levels high. The FaradayTrainline Lithium Project has all the hallmarks of a very low-cost development able to be commercialised in the very near
term.”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
1
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Following Widgie Nickel’s Ltd (ASX: WIN) (“Widgie” or “the Company”) announcement of its maiden Mineral Resource
Estimate at the Faraday Lithium Deposit (“Faraday”) (refer ASX release dated 29 March 2023), Widgie is pleased to
announce the discovery of a new lithium prospect to the north named “Trainline”, as well as the definition of additional
lithium mineralisation at depth at Faraday.
The Faraday-Trainline Lithium Project area is located on Mining Lease M15/102, 4km west north-west of the
Widgiemooltha townsite. Access is via the Coolgardie-Norseman Rd, 63km south of Coolgardie. Faraday and Trainline
are central to Widgie’s Mt Edwards Project, covering a significant land holding within the “Lithium Corridor” between Mt
Marion to the north and Pioneer Dome to the south (Figure 1).
Figure 1 - Regional Geology showing Faraday and Trainline Lithium Project location, and surrounding lithium Projects
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
2
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
The Trainline lithium prospect is located approximately 100m to the north of Faraday as illustrated in Figure 2.
Figure 2 Plan view of Faraday - Trainline Lithium Project. Displaying drill location and cross cutting dolerite intrusive.
Geology and Lithium Mineralisation Interpretation
The Mt Edwards Project lithium tenements cover the northern margin of the Widgiemooltha Dome. The mineralisation
at Faraday-Trainline Project is hosted within Lithium-Caesium-Tantalum (LCT) pegmatites associated with fractionated
late-stage granitic intrusions.
The stacked pegmatites veins have intruded the steeply dipping mafic/ultramafic country rock dipping shallowly to the
west at 20o and are found to be outcropping in places. The pegmatites widths vary from 1m to 14m in thickness, with
greater thicknesses observed within the ultramafic host. The pegmatites have a strike length of 800m north-south and
are open at depth.
Faraday and Trainline have been separated by a late-stage, cross cutting east-west dolerite intrusive that truncates the
pegmatite bodies to the north and south as illustrated in Figure 2.
Discussion of Results
This RC exploration drill campaign was completing drilling 80m by 80m step outs, down dip and to the north of Faraday
deposit. The down dip extensional drilling has confirmed the continuity of the main Faraday, westly dipping, lithium
bearing pegmatite (Figure 4). Despite the thicknesses of the Faraday pegmatite appearing to narrow, the drilling has
successfully delineated the continuity of thin, high-grade lithium bearing pegmatite.
Drilling north of the historic Coolgardie to Esperance trainline has delineated a barren dolerite intrusive that truncates
the pegmatite body to the north and south. The lithium bearing pegmatite intersected north of the dolerite intrusive has
given rise to the new “Trainline” Lithium Prospect which has returned high grade results including 4m @ 1.19% Li2O from
drill hole 23MERC118 (Figure 5).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
3
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Figure 3 - Faraday Drilling - white sample spoils represent Faraday lithium bearing pegmatite
XRD mineral analysis has identified spodumene as the exclusive lithium bearing mineral at Faraday which lends to
excellent metallurgical recoveries and pay-ability. See Table 1 below. The 16 samples selected are spatially
representative of the Faraday Deposit. All samples were submitted for XRD mineral analysis at Intertek Genalysis,
Maddington WA.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
4
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Figure 4 – Faraday resource block model, pegmatite shell (light red) and recent down dip intercepts looking south-east
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
5
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Figure 5 – Trainline Prospect - north of Faraday Lithium Deposit, looking south-east.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
6
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Table 1 - Faraday XRD mineral analysis identifying Spodumene as the exclusive lithium bearing mineral
Sample
name
Amorphous
Content
Formula
Amphibole
Beryl
e.g.
Ca2(Mg,Fe)5
Si8O22(OH)2
Be3Al2(Si
O3)6
%
%
Expanding
clay
Kaolin
Mica
Potassium
Feldspar
Quartz
Sodium
Plagioclase
Spodumene
Talc
Al2Si2O
5(OH)4
K(Al,Mg,Fe)2(Si,
Al)4O10(OH)2
KAlSi3O8
SiO2
NaAlSi3O8
LiAl(SiO3)2
Mg3Si4O
10(OH)2
%
%
%
%
%
%
%
%
1
1
6
8
29
23
22
99
<0.5
4
11
34
24
17
100
Sample ID /
Units
%
M27445
9
<0.5
M27457
10
<0.5
M27471
10
M27479
10
M27517
9
M27523
12
<0.5
M27607
9
<0.5
M27646
8
M27654
11
M27663
8
7
M27667
8
<0.5
8
M27685
8
<0.5
M27689
10
<0.5
<0.5
1
1
1
%
4
11
26
34
12
99
10
11
30
27
12
100
5
12
27
33
13
99
7
12
24
34
9
6
11
28
28
18
100
5
8
27
33
19
100
27
48
12
10
27
37
11
10
28
28
17
<0.5
99
8
14
26
30
14
<0.5
100
<0.5
5
12
26
31
16
<0.5
100
<0.5
100
<0.5
<0.5
1
1
1
<0.5
<0.5
100
100
100
M27743
8
<0.5
5
11
29
26
21
M27799
10
<0.5
8
15
30
21
16
100
M27803
8
<0.5
8
10
28
16
29
99
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
<0.5
<0.5
Total
PO BOX 7713
Cloisters Square WA 6850
<0.5
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
7
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Cross section 6516520mN at Trainline demonstrates the grade continuity and shallow nature of the pegmatites (Figure
6). Trainline covers an area of 200m by 200m with mineralised intercepts within the main pegmatite up to 14m wide
(23MERC119) and defined to a vertical depth of 75m (23MERC120).
Figure 6 – Cross section 6516520mN, Trainline discovery
Future Work
Further work and infill drilling is required to fully understand the geometry and nature of mineralisation of the LCT
pegmatite at Trainline. Additional infill drilling down dip at Faraday is required to expand the boundaries of
mineralisation and in turn inform an updated Mineral Resource Estimate with the potential inclusion of additional
mineralisation at Trainline.
The Company is nearing the conclusion of offtake discussions and anticipates announcing a successful partnership
structure in the near future.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
8
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Drill Results
Hole ID
23MERC106
23MERC107
23MERC108
23MERC109
incl.
23MERC110
incl.
23MERC111
23MERC112
23MERC113
incl.
23MERC114
incl.
23MERC115
23MERC116
23MERC117
23MERC118
and
incl.
23MERC119
and
23MERC120
23MERC121
23MERC122
23MERC123
23MERC124
23MERC125
23MERC126
23MERC127
23MERC128
23MERC129
and
23MERC130
incl.
23MERC131
incl.
and
23MERC132
and
incl.
23MERC133
23MERC134
23MERC135
23MERC136
23MERC137
23MERC138
23MERC139
23MERC140
23MERC141
23MERC142
23MERC143
23MERC144
23MERC145
and
23MERC146
23MERC147
23MERC148
23MERC149
23MERC150
23MERC205
23MERC206
23MERC207
Table 2 2023 Lithium Drilling M15/102 Drill Intercepts
Drill Type
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Prospect
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Trainline
Programme
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Exp
Depth From (m)
Depth To (m)
39.0
41.0
42.0
48.0
43.0
42.0
51.0
50.0
30.0
30.0
43.0
43.0
61.0
37.0
33.0
53.0
50.0
64.0
4.0
17.0
22.0
8.0
38.0
67.0
6.0
26.0
26.0
13.0
52.0
74.0
77.0
23.0
92.0
97.0
97.0
99.0
100.0
105.0
130.0
137.0
137.0
100.0
79.0
24.0
95.0
100.0
98.0
102.0
101.0
109.0
132.0
142.0
140.0
104.0
46.0
48.0
54.0
61.0
56.0
68.0
109.0
111.0
DH Width (m)
NSI
NSI
NSI
4.0
1.0
9.0
2.0
NSI
NSI
7.0
3.0
10.0
7.0
3.0
NSI
NSI
2.0
9.0
4.0
5.0
14.0
7.0
NSI
NSI
NSI
NSI
NSI
NSI
NSI
2.0
1.0
3.0
3.0
1.0
3.0
1.0
4.0
2.0
5.0
3.0
4.0
NSI
NSI
NSI
NSI
NSI
NSI
NSI
NSI
2.0
NSI
NSI
2.0
7.0
NSI
NSI
NSI
2.0
NSI
NSI
NSI
NSI
Li2O (%)
0.59
0.92
0.47
0.87
0.61
0.94
0.68
0.79
0.44
0.86
0.82
1.19
0.60
0.41
0.35
0.49
0.89
0.63
0.38
0.73
0.63
1.20
0.47
0.55
0.69
0.87
0.36
0.35
0.45
0.36
0.51
Significant intercepts above 0.3% Li2O, in places includes internal dilution to allow for grade continuity.
NSI = no significant intersection
Exp = intercepts outside of 2023 mineralisation wireframe.
Infill = intercepts within the area of the 2023 mineralisation wireframe.
RC = Reverse circulation, DD = Diamond Core
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
9
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Drilling Details
Table 3 Collar details for holes reported in this ASX announcement
Hole ID
Prospect
Drill Type
23MERC106
23MERC107
23MERC108
23MERC109
23MERC110
23MERC111
23MERC112
23MERC113
23MERC114
23MERC115
23MERC116
23MERC117
23MERC118
23MERC119
23MERC120
23MERC121
23MERC122
23MERC123
23MERC124
23MERC125
23MERC126
23MERC127
23MERC128
23MERC129
23MERC130
23MERC131
23MERC132
23MERC133
23MERC134
23MERC135
23MERC136
23MERC137
23MERC138
23MERC139
23MERC140
23MERC141
23MERC142
23MERC143
23MERC144
23MERC145
23MERC146
23MERC147
23MERC148
23MERC149
23MERC150
23MERC205
23MERC206
23MERC207
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
Faraday
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Total
Depth (m)
22
32
62
86
86
26
32
56
80
98
21
40
56
80
104
20
26
38
50
110
14
86
90
116
110
116
152
110
158
152
20
38
56
80
104
122
140
128
152
164
158
170
146
146
176
254
264
272
Survey
Method
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
RTK_GPS
Easting (m)
Northing (m)
360769.7
360689.5
360611.0
360529.9
360449.7
360767.4
360690.1
360609.8
360528.7
360447.2
360773.2
360694.7
360607.6
360529.3
360457.9
360687.1
360645.9
360607.8
360529.3
360408.0
360689.0
360501.7
360452.7
360407.3
360409.5
360406.8
360327.1
360412.5
360326.3
360326.2
360805.7
360726.3
360650.3
360565.8
360490.8
360403.7
360327.6
360246.4
360338.5
360252.2
360327.4
360247.4
360403.8
360330.0
360243.8
360166.9
360081.5
359995.5
6516188.3
6516189.6
6516186.9
6516183.9
6516183.6
6516103.3
6516108.5
6516103.8
6516103.6
6516103.1
6516020.2
6516010.1
6516015.5
6516020.0
6516020.4
6515936.6
6515937.6
6515939.2
6515938.0
6515943.0
6515821.4
6515864.6
6515865.7
6515863.1
6515781.4
6515702.2
6515703.4
6515618.9
6515620.4
6515783.4
6516261.7
6516257.3
6516265.4
6516256.7
6516261.0
6516260.5
6516263.1
6516263.1
6516185.6
6516174.4
6516096.2
6516102.1
6516022.9
6516017.0
6516022.6
6516028.1
6516023.8
6516027.1
RL (m)
368.6
367.1
367.1
367.1
366.8
368.7
367.3
368.2
368.2
368.4
369.9
370.0
369.7
369.6
370.5
369.5
369.9
370.2
370.9
372.4
369.9
372.8
373.6
373.6
375.4
379.0
378.9
383.2
383.7
373.2
369.4
368.7
367.7
366.4
366.6
365.9
365.5
364.9
366.9
367.4
370.2
371.2
372.7
376.0
379.5
377.1
374.7
374.1
Dip
Azimuth
-59.8
-59.6
-60.1
-60.4
-59.9
-59.9
-59.5
-60.0
-60.0
-60.6
-60.2
-60.7
-59.7
-60.0
-66.0
-59.6
-59.9
-61.4
-60.0
-60.5
-59.8
-65.2
-63.0
-59.4
-60.1
-59.9
-59.2
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-59.5
-59.8
-60.0
-59.6
-59.8
-59.5
-59.4
-58.8
87.2
93.5
91.1
89.1
87.9
93.2
87.2
86.9
88.6
89.8
90.4
90.4
88.4
89.0
88.9
89.8
88.4
95.8
88.7
90.6
89.1
88.0
87.5
90.3
88.2
89.9
88.8
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.2
89.7
89.6
90.1
90.1
90.3
86.2
88.6
91.6
Survey method RTK_DGPS =Real Time Kinematic Digital Global Positioning System, GP = Handheld Global Positioning System (Garmin GPS)
Competent Person Statement
The information in this announcement that relates to exploration results and sampling techniques is based on and fairly
represents information and supporting documentation compiled by Mr William Stewart, who is a full-time employee of
Widgie Nickel Limited. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335).
Mr Stewart has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
10
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Compliance Statement
The information in this report that relates to Exploration Results are extracted from the ASX Announcements listed in the
table below, which are also available on the Company’s website www.widgienickel.com.au.
Date
Title
08/12/2022
Assays confirm High Grade Lithium discovery at Faraday
09/01/2023
Further Assays Reaffirm High-grade Lithium Discovery at Faraday
14/02/2023
Widgie Fast-tracks Faraday Li2O Deposit for DSO Opportunity
29/03/2023
Maiden Resource Proves Up Faraday DSO Stater Pit Opportunity
08/05/2023
Faraday Mining Proposal Lodged
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements and that all material assumptions and technical parameters underpinning the
estimates in the market announcements continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Persons’ findings are presented have not been materially modified from the
original market announcements.
Approved by: Board of Widgie Nickel Ltd
For further details please contact
Steve Norregaard
Managing Director
steve@widgienickel.com.au
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
-ENDSMedia Inquiries:
Shane Murphy
FTI Consulting
shane.murphy@fticonsulting.com
0420 945 291
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
11
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Table 1 information in accordance with JORC 2012: Mt Edwards Lithium Exploration
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code Explanation
Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g., ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases,
more explanation may be required, such as where
there is coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g., submarine nodules) may
warrant disclosure of detailed information.
Drilling
Techniques
Drill Sample
Recovery
Drill type (e.g., core, reverse circulation, open- hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g., core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may have
occurred due to preferential loss/gain of fine/coarse
material.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
Commentary
All new data collected from the Faraday and Trainline Lithium Project
discussed in this report is in relation to Reverse Circulation (RC)
drilling completed at the Faraday and Trainline Lithium Project
between 19 March 2023 and 1 May 2023.
All RC samples have been acquired at one metre intervals from a
chute beneath a cyclone on the RC drill rig. Sample size was then
reduced through a cone sample splitter. Two identical sub-samples
have been captured in pre-numbered calico bags, with typical masses
ranging between 2 and 3.5kg. Care was taken to ensure that both
original sub-samples and duplicate sub-samples have been collected
representatively, and therefore are of equal quantities. The remainder
of the sample (the reject) has been retained in the short term in
sample piles at the drill site.
All samples were assayed at single metre sample intervals.
With sampling of the prospective pegmatite vein and 2-5m into the
mafic/ultramafic waste rock host to ensure representative sampling.
No other measurement tools related to sampling have been used in
the holes for sampling other than directional/orientation survey tools.
A sodium peroxide fusion using nickel crucibles and hydrochloric acid
to digest. With an Inductively Coupled Plasma Optical Emission
Spectrometry (ICP-OES) finish for Al, B, Ba, Be, Ca, Cs, Fe, K, Li, Mg,
Mn, Nb, P, Rb, S, Si, Sn, Sr, Ta and W.
Forty-eight (48) drillholes have been completed and reported in this
announcement for 4,819m drilled.
The RC rig is a KWL350 with a face sampling auxiliary compressor
and booster. Drill rods are 6 metres long and drill bit diameter is
143mm, and hence so is the size of drillhole diameter. Holes have
been drilled at a nominal dip angle of -60° with varying azimuth angles
to orthogonally intercept the interpreted favourable geological contact
zones.
The sample recovery is logged by a geologist during drilling, and
recoveries have been considered acceptable. With all sampling being
dry.
Minor sample loss was recognised while sampling the first metre of
some drillholes due to very fine grain size of the surface and nearsurface material.
No relationship between sample recovery and grade has been
recognised.
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
12
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Logging
Section 1 Sampling Techniques and Data
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to
support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
Subsampling
techniques
and sample
preparation
All RC drillholes have been geologically logged for lithology,
weathering, alteration, and mineralogy. All samples have been logged
in the field at the time of drilling and sampling (both quantitatively and
qualitatively where viable), with spoil material and sieved rock chips
assessed. All RC holes are photographed.
The total length of RC drilling as reported is 4,819m.
The total length and percentage of the relevant
intersections logged.
Geochemical analysis of each hole has been correlated back to
logged geology for validation.
If core, whether cut or sawn and whether quarter, half
or all core taken.
No core drilling was conducted.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
The sample preparation technique carried out in the field is
considered industry best standard practice and was completed by the
geologist.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
All samples were dry
Samples collected at 1 metre intervals from a cyclone-mounted cone
splitter to yield a 2 to 3 kg sub-samples, collected in the field, and sent
to Intertek Kalgoorlie for receival then sorted and recorded.
Individual samples were weighed as received and then dried in an
oven for up to 12 hours at 105C.
Samples >3 kg’s were riffle split 50:50 and excess discarded. All
samples were then pulverised in a LM5 pulveriser for 5 minutes to
achieve 85% passing 75um. 1:50 grind checks were performed to
verify passing was achieved.
A 300g split was taken at the bowl upon completion of the grind and
sent to the next facility for assay. The remainder of the sample (now
pulverised) was bagged and retained until further notice.
Quality of
assay data
and
laboratory
tests
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and whether
the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g.,
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been established.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
For each submitted sample, the remaining sample (material) less the
aliquot used for analysis has been retained, with the majority retained
and returned to the original calico bag and a nominal 100g portion
split into a pulp packet for future reference.
Widgie Nickel has established QAQC procedures for all drilling and
sampling programs including the use of commercial Certified
Reference Material (CRM) as field and laboratory standards, field and
laboratory duplicates and blanks.
Lithium CRM samples have been inserted into the batches by the
geologist, at a nominal rate of 5% of the total samples.
Field duplicate samples have been taken in visibly mineralised zones,
at a rate of 2% of total samples.
Samples of blank material have been submitted immediately after
visibly mineralised zones at a nominal rate of 5% of the total samples.
Sample size is considered appropriate to the grain size of the material
being sampled.
Samples were analysed at Intertek Perth, WA. Individual samples
have been assayed for a suite of 21 elements including lithium related
analytes as per the laboratory’s procedure for a sodium peroxide
fusion using nickel crucibles and hydrochloric acid to digest. With an
Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES)
finish for Al, B, Ba, Be, Ca, Cs, Fe, K, Li, Mg, Mn, Nb, P, Rb, S, Si, Sn, Sr,
Ta and W.
Internal sample quality control analysis was then conducted on each
sample and on the batch by the laboratory.
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
13
New Lithium Discoveries Position Widgie for Resource Growth
4 July 2023
Section 1 Sampling Techniques and Data
Results have been reported to Widgie Nickel in CSV, PDF and SIF
formats.
Verification
of sampling
and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes
The verification of significant intersections by either
independent or alternative company personnel.
Discuss any adjustment to assay data
A detailed QAQC analysis was carried out with all results assessed for
repeatability and meeting expected values relevant to lithium and
related elements. Any failures or discrepancies were followed up as
required.
Assay results are provided by the laboratory to Widgie Nickel in CSV,
PDF and XLS formats, and then validated and entered into the
database managed by an external Database contractor. Backups of
the database are stored both in and out of office.
Assay, Sample ID and logging data are matched and validated using
filters in the drill database. The data is further visually validated by
Widgie Nickel geologists and database staff.
Significant intersections are verified by senior Widgie Nickel
geologists. QAQC reports are run and the performance of the
laboratory is evaluated periodically by senior Widgie Nickel geologists.
No drill holes were twinned.
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
Oxide Li2O value is calculated by multiplying elemental Li % by a factor
of 2.153.
A differential GPS (DGPS) has been used t
Share your feedback
Discover