Standalone Mt Edwards Project Scoping Study
Released
Released
Announcement PDF
ASX Announcement
7 March 2024
Standalone Mt Edwards Project Scoping
Study Highlights Nickel Potential
Highlights
•
•
•
•
Compelling case for a standalone concentrator delivers:
• Low operating costs
• Higher payabilities
• Demonstrates the benefits of control of our own integrated mining and milling process.
Widgie’s Resource base able to supply steady state sustainable production profile:
• Production rate of ~800,000tpa
• Overall 77% of material exploited in high confidence Indicated Resource category
• 7 further Resources available to be exploited not contemplated by this Study
Scoping Study assesses an 800ktpa standalone nickel concentrator producing 103,000tpa @
10.1% Ni concentrate for 10,380t of contained nickel per annum
Opportunities to consider downstream processing to improve viability now able to be considered
Widgie Nickel’s Managing Director and CEO, Mr Steve Norregaard, commented:
“Nickel has only recently been added to the governments list of critical metals, which importantly
opens up new avenues for the company to deliver this Project not previously available. This
Study demonstrates the strategic value and uniqueness of Widgie’s Nickel Resource base to
the entire country and WA. It is our ability, as demonstrated by this study, to support a long
life mining and processing operation that sets Widgie apart from our peers.
“This Scoping Study demonstrates that we have a robust nickel Project that should be progressed to
the Pre-Feasibility Study stage. The fact that we have seven additional mineral resources that have not
yet been examined as part of this process provides underlying confidence in the long-term nature of the
standalone Project.
“Of course, we are cognisant that the nickel price has been quite volatile over the last year, starting at
well over US$30k/t and now sitting around US$17.5k/t. As quickly as it has come off, we have
confidence that the fundamentals are there to support the price rebounding over the future years. We
are building a Project for the future, not necessarily one to be immediately developed today.
“This is a very significant step forward for the company.”
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Pe r t h, WA 6 0 00
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
1
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Mt Edwards Nickel Project Scoping Study
Widgie Nickel Ltd (ASX: WIN) (“Widgie” or “the Company”) is pleased to announce the results of the
Scoping Study for its 100% owned Mt Edwards Nickel Project.
Cautionary Statement
The Scoping Study referred to in this announcement has been undertaken for the purposes of
demonstrating the business case to support a standalone integrated nickel mine and concentrator
at the Mt Edwards Nickel Project. It is a preliminary technical and economic study of the potential
viability of the Mt Edwards Nickel Project. It is based on low level technical and economic
assessments that are not sufficient to support the estimation of ore reserves. A level of accuracy of
+/-40% is applicable in accordance with Scoping level accuracy. Further exploration and evaluation
work and appropriate studies are required before Widgie will be in a position to estimate any ore
reserves or to provide any assurance of an economic development case.
The Scoping Study is based on the material assumptions outlined below. These include assumptions
about the availability of funding. While Widgie considers all of the material assumptions to be based
on reasonable grounds, there is no certainty that they will prove to be correct or that the range of
outcomes indicated by the Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, funding in the order of $270 million
will likely be required. Investors should note that there is no certainty that Widgie will be able to
raise this sum of funding when needed. It is possible or likely (as the case may be) that the required
funding may only be available on terms that may be dilutive to or otherwise affect the value of
Widgie’s existing shares.
It is also possible that Widgie could pursue other ‘value realisation’ strategies such as a sale, partial
sale, or joint venture of the Project. If it does, this could materially reduce Widgie’s proportionate
ownership of the Project.
Given the uncertainties involved, investors should not make any investment decisions based solely
on the results of this Scoping Study.
Executive Summary
•
•
•
•
•
Scoping Study assesses the mining and processing of 5.05Mt of ore grading 1.56% Ni over an
initial six (6) year mine production life (the “Production Target”)
800ktpa standalone nickel concentrator produces 103,000tpa @ 10.1% Ni concentrate for
10,380t of contained nickel per annum
Scoping Study undertaken at a base case assumed US$24,000/t nickel, the approximate
midpoint of the nickel price during 2023 and in line with other recent ASX peer studies
Scoping Study based only on the mining of Widgie Townsite (WTS), Gillett/Widgie 3 (GW3),
Armstrong (ANM) and 132N with seven (7) remaining deposits with upgrade potential that can
be included into subsequent studies
Scoping Study provides sufficient confidence to move to a Pre-Feasibility Study for the Mt
Edwards Nickel Project
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
2
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
•
Studies examining opportunities to improve viability by considering downstream options to be
pursued.
The Mt Edwards Nickel Project is located near Widgiemooltha in the Eastern Goldfields region of
Western Australia, approximately 63km south of Coolgardie and 30km south-west of Kambalda. Access
to the Project area is via a direct turn off from the Coolgardie-Esperance Highway north of
Widgiemooltha and is accessible in all weather conditions.
The Widgiemooltha region is a mining district rich in history with activity commencing in the 1890’s
when gold was first discovered. Nickel exploration commenced in the region during the 1960’s after
nickel was discovered in Kambalda that resulted in the discovery of several significant nickel sulphide
deposits and ultimately mining commenced in the region in the early 1970’s.
Widgie holds a 100% interest in the nickel rights across the Mt Edwards lease tenement package, which
total some 240km 2 . 12 nickel sulphide deposits have been identified, with the current estimated
Mineral Resources base of 13.16Mt grading 1.45% nickel for 190,300 tonnes of nickel metal (all Mineral
Resources are quoted at 1% Ni cut-off other than for Armstong, Widgie 3, Widgie Townsite and Gillett
which are quoted at 0.7% Ni cut-off). The tenements host nickel, lithium and gold Mineral Resources
with rights varying depending on the tenement grouping.
The mining plan for this Scoping Level Study evaluates Widgie Townsite, Gillett, Widgie 3, Armstrong
and 132N deposits that contain Mineral Resources of 7.79Mt at 1.45% Ni for 113.1kt of contained
nickel.
The proposed operation consists for four (4) underground mines, an 800ktpa nickel concentrator, a 250
room accommodation village, a 15.5km 33kV/11kV overhead HV powerline, site offices/workshops, a
central administration office complex and a core yard facility. The operations will mine nickel ore that
will be carted to a centrally located nickel concentrator to produce a nickel concentrate.
The underground mines were each designed with a figure 8 style decline access for efficient mining and
services installation. The mine designs utilise relatively small cross section haulage declines with
dimensions of (5.2mH x 5.0mW) suitable for 40t payload ejector trucks. This machinery type is
important for the given amount of waste and cemented rock backfill required in the mining schedule.
These smaller declines allow for faster development rates, less blast holes, less ground support and
less waste rock removal relative to the standard decline dimensions (5.8mH x 5.5mW). Mine planning
has incorporated full main infrastructure engineering designs for HV power, ventilation, pumping, water
supply and secondary means of egress for each mine. The main mining method for the four (4)
underground mines can be best described as a bottom up panel long hole stoping method with waste
(WRF) or cemented rock fill (CRF).
The Production Target assessment process has used the current Mineral Resource models and applied
a 0.9% Ni grade cut-off during the Mine Stope Optimiser (MSO) stope selection process. This has
provided raw mining volume estimate for each Resource. Further mining dilution and recovery factors
have then been applied along with practical economics for each individual stoping panel. This process
has resulted in a total Production Target of 5.05Mt grading 1.56% Ni containing 78.8kt of nickel metal
for the Project. The Production Target comprises 77% of Resources classified as Measured/Indicated
and 23% as Inferred.
The focus of the first two (2) years of the mine plan calls for the development of the Widgie Townsite
(WTS), and Gillett/ Widgie 3 (GW3) underground mines. This pre-production stage of the operational
plan incorporates the construction of a HV powerline, concrete batch plant, main administration
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
3
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
complex, nickel concentrator and accommodation village. Completion of the accommodation village is
scheduled for month 4, energising of the main HV powerline month 5 and commissioning of the
processing plant month 16. The Armstrong underground mine is scheduled for commencement at the
start of year 5 with commencement of the 132N underground mine scheduled for the start of year 5
month 10.
Monthly performance for the Project after ramp-up averages 68kt of ore produced and 450m of jumbo
development completed. In total for the four (4) underground mines, there is 15.2km of main haulage
way development and 48.7km of total mine development to be completed. The number of jumbo
development crews peaks at 4 in year 3 averaging 2.1 jumbo development crews over the life of the
operations. During the Project, there is 2.4Mt of WRF and 0.67Mt of CRF required to be placed in stope
voids. In total, there is 19.1Mtkm of trucking material movement. The average load and haul fleet size
consists of 6 loaders and 6 trucks. The mining workforce including mobile maintenance during the
Project averages 145 persons with a peak of 193 persons in year 6.
The proposed processing flowsheet consists of a 220t/h 3 stage mobile crushing circuit producing
crushed material to minus 10mm. The crushed material is conveyed to a fine ore bin of 14hr live
capacity (1,400t) before being fed into a 100t/h ball mill circuit. Material is ground to P 8 0 53 micron in
the milling circuit then proceeds into the first conditioning tank with chemicals added prior to entering
the rougher and scavenger flotation cells. Tailings are then transferred to a tailings thickener with a
thickened tails stream of 50% solid pulp density subsequently pumped to the tailings storage facility.
Sulphide minerals recovered from the rougher and scavenger float cells are fed into a second
conditioning tank prior to entering the cleaner cells to improve the nickel grade and quality of the
concentrate. Cleaned concentrate collected from the cleaner float cells is then pumped to the
concentrate thickener before dewatering and washing within a pressure filter. The filter cake of 6%
moisture is discharged for storage in a shed ready for transport and shipping.
When in full production, the maximum milling rate applied is 70kt per month with average monthly
concentrate production for the Project being 8.6kt. The targeted concentrate grade for the processing
plant is 10.1% nickel with an average nickel recovery of 79%. The concentrate product will contain
payable quantities of nickel, cobalt and palladium. After being stockpiled on site the concentrate will
be transported to the Esperance Port for overseas export upon sufficient product being available ready
for shipment.
The operations will utilise a fully Fly in/Fly out (FIFO) workforce with accommodation provided by the
250 room onsite accommodation village. Transport to and from the Project has been costed utilising
three (3) charter flights per week flying from Perth to the Kambalda airport. Full manning levels for the
operation averages 240 over the life of the Project with a peak of 290 in year 5. Average non mining
workers at full production is 77 comprising 41 people allocated for the processing plant, the balance
in administration or support services. Average personnel onsite for the Project is 159 persons. During
the village construction period, an offsite accommodation facility in Kambalda will be utilised.
The Project operations are scheduled to reach full commercial production in month 16 with the
estimated pre-production capital cost being AUD$257M. When in full production the average monthly
operating costs for the operation is AUD$10M. During this period, capital costs per month average
AUD$2.6M, fluctuating between AUD$409k up to AUD$8.6M. The estimated total unit operating costs
over the life of the Project is AUD$161/t milled with total capital costs of AUD$433M.
The total unit operating costs were calculated as AUD$97 per ore tonne for mining, AUD$34 per tonne
processed for milling (including power) with other ancillary costs being AUD$22/t. Annual power costs
at commercial production average AUD$15.5M.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
4
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
The Project is estimated to generate AUD$402M free cash over a 94 month period with a maximum
negative cashflow of AUD$269.2M in month 16 at a US$24,000/t Ni price applying an exchange rate
0.65 AUD/USD. The estimated pre-mine gate unit operating nickel production cost is US$3.67/lb. Total
past mine gate costs have been estimated at AUD$230.2M, which includes all third-party royalties and
AUD$43.5M Western Australian State royalties. The calculated NPV at an 8% discount rate for the
Project is AUD$197.4M and internal rate of return of 22.9%.
From the current defined Production Target of 5.05Mt @ 1.56% Ni, full operation mine production can
be achieved for 6 years. There are seven (7) additional defined Mineral Resources (5.37Mt @ 1. 44%
Ni) located at the Mt Edwards Nickel Project providing substantial upside and high probability of mine
life extending beyond the Scoping Study projected life.
These additional Mineral Resources will be assessed and ultimately exploited, if viable, to provide an
increase to the production cashflow and mine life of the Project.
Table 1 - Mt Edwards Scoping Study Key Outcomes
PARAMETER
UNIT
PROJECT TOTAL
KEY ASSUMPTIONS
Nickel Price
US$/tonne
24,000
Diesel Price
US$/litre
1.20
Exchange Rate
AUD:USD
0.65
Discount Rate
%
8.0
Concentrator Nickel Recovery (Ni)
%
79.0
Offtake Nickel Payability
%
80.0
Unit Power Cost
AUD$/kWhr
0.20
Total Concentrate Transport Costs
AUD$/wmt
110.97
Life of Mine
Months
94
Total Ore Mined
Tonnes
5,047,555
Total Jumbo Development
metres
48,734
Total Truck Material Movement
tkm
19,171,620
Total Ore Milled
dmt
5,047,555
Average Feed Grade
% Ni
1.56
Concentrate Produced
dmt
616,668
Concentrate Grade
% Ni
10.1
Contained Nickel
Tonnes
62,283
Total Operating Costs
AUD$
812,719,828
Total Capital Costs
AUD$
433,227,055
PRODUCTION TARGET
FINANCIALS
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
5
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Pre Production Capex
AUD$
257,029,982
Max Negative Cashflow (Month 16)
AUD$
-269,209,468
Total Past Mine Gate Costs
AUD$
230,232,929
Total Net Revenue (Minus Past Mine Gate Costs)
AUD$
1,647,956,772
Total Cumulative Cashflow (Pre Tax)
AUD$
402,009,886
Discounted Cashflow (@ 8%) - NPV8
AUD$
197,378,393
%
22.9
Unit Operating Costs (C1)
AUD$/t milled
161.01
Unit Mining Operating Costs (Inc Power)
AUD$/t mined
97.16
Unit Milling Operating Costs (Inc Power)
AUD$/t milled
33.98
Unit All in Sustaining Costs
AUD$/t milled
195.92
Unit All in Costs
AUD$/t milled
246.84
Unit Nickel Operating Production Cost
(Excluded Past Mine Gate Costs)
US$/lb in Con
3.67
AUD$/t in Con
12,432
(Con Transport, Offtake, Royalties)
Internal Rate of Return
UNIT COSTS
Comparative C1 Nickel Production Cost
US$/lb Payable
5.39
Background
Widgie Nickel commissioned this Scoping Study for the purpose of carrying out a preliminary
assessment of the technical and financial viability of a standalone nickel mining and processing
operation. The proposed Project is planned for construction on the Company’s tenement package
located in the Widgiemooltha mining district of Western Australia. The proposed Project consists of
four (4) underground nickel mines, an 800ktpa nickel concentrator and a 250 room village.
This Scoping Study covers various aspects of the proposed operation including mine designs, a
comprehensive mine construction plan, metallurgical test work and subsequent process flowsheet
development, HV power surface distribution designs culminating in a full cost estimate with recently
sourced market offtake terms leading to a detailed financial model.
Location
The Mt Edwards Nickel Project is located immediately west of the Coolgardie-Esperance Highway,
approximately 63km south of Coolgardie and 30km south-west of Kambalda (Figure 1). Access to the
Project area is via direct turn off from the Coolgardie-Esperance Highway and is accessible in all
weather conditions.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
6
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Figure 1 - Project Location Plan
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
7
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Geology and Nickel Mineralisation Interpretation
The Mount Edwards Nickel Project lies predominantly within the Coolgardie Domain on the western
margin of the Kalgoorlie Terrane in the Norseman-Wiluna Greenstone Belt of the Archaean Yilgarn
Craton, Western Australia.
The characteristic stratigraphy of the Kalgoorlie Terrane consists of a lower basalt unit overlain by
komatiite, which is in turn overlain by an upper basalt unit. This mafic-ultramafic succession, referred
to as the Coolgardie Group, is overlain by a unit of felsic volcanic and sedimentary rocks, the Black
Flag Group that is found to the east of the Project area. The stratigraphic sequence within the
Coolgardie Domain is inferred to be a continuation of the Kambalda stratigraphy.
The greenstone sequence has been subdivided into six (6) stratigraphic units. Four (4) phases of
deformation have been recognised in the Widgiemooltha mining district and surrounding areas
comprised of an early phase of D1 recumbent folding and thrusting followed by a transpressional
regime with large scale, upright open folding (D2), sinistral, strikeslip D3 faulting (with associated enechelon folds) and prolonged ENE to WSW regional shortening (D4).
The area also hosts significant felsic intrusive units containing lithium mineralisation throughout the
Coolgardie Greenstone Domain. Figure 1 demonstrates the local geology and nickel endowment.
Mineral Resources
Widgie’s current Mineral Resource status stands at 190,300 nickel tonnes contained within 12 deposits
(Table 2). In line with this Scoping Study, the Mineral Resource evaluation of each deposit is ongoing.
Table 2 - Mt Edwards Nickel Project Mineral Resources
Deposit
Widgie Townsite*
Widgie 3*
Gillett*
Armstrong*
132N
Munda
Cooke
Inco Boundary
McEwen
McEwen Hangingwall
Mt Edwards 26N
Zabel
TOTAL
Indicated
Tonnes
Nickel (%)
(kt)
1,649
1.60
512
1.34
2,267
1.35
949
1.45
34
2.90
272
5,683
1.94
1.48
Inferred
Tonnes
(kt)
852
222
871
10
426
508
154
464
1,133
1,916
871
53
7,480
Nickel
(%)
1.38
1.95
1.16
1.04
1.90
1.85
1.30
1.20
1.35
1.36
1.43
2.04
1.42
Total Resources
Tonnes
Nickel
(kt)
(%)
2,502
1.53
734
1.53
3,138
1.30
959
1.44
460
2.00
508
1.85
154
1.30
464
1.20
1,133
1.35
1,916
1.36
871
1.43
325
1.96
13,164
1.45
Nickel Tonnes
(kt)
38.26
11.20
40.77
13.82
9.05
9.40
2.00
5.59
15.34
26.11
12.40
6.36
190.30
Note: All Resource stated at 1% lower cut, other than Armstrong, Widgie Townsite, Widgie 3 and Gillett at 0.7% lower
cut
Mineral Resource Modelling
Detailed commentary for each Mineral Resource Estimate (MRE) that informed this Scoping Study can
be found in the corresponding ASX announcements listed below:
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
8
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
•
•
•
•
•
Armstrong “Armstrong Mineral Resource Update” released 13 December 2023. (ASX:WIN)
Gillett “Substantial Uplift to Gillett Mineral Resource” released 9 January 2024. (ASX:WIN)
Widgie 3 “Widgie 3 Mineral Resource Update” released 15 January 2024. (ASX:WIN)
Widgie Townsite “Widgie Townsite Nickel Mineral Resource Update" released 29 January 2024.
(ASX:WIN)
132N “132 Nickel Mineral Resource and Exploration Update at Mt Edwards” 6 October 2020. (ASX:NMT)
For the purpose of the economic assessment of 132N byproducts, Widgie has used the estimated grade
for Pt and Pd from the November 2023 Armstrong MRE being 0.4ppm Pd and 0.2ppm Pt. This is
considered appropriate as the average grade of the Pt and Pd composites assayed above 0.5% Ni
returned 0.59ppm Pd and 0.20ppm Pt.
Geotechnical Assessment
Widgie engaged MineGeoTech (MGT) to undertake a scoping level geotechnical study for the Widgie
South and 132N Projects as part of the broader Mt Edwards Project. The Widgie South Project includes
the Widgie Townsite, Gillett, Widgie 3 and the 132N deposits. MGT have previously produced a
Feasibility Level Geotechnical Study for the Armstrong deposit in May 2023.
MGT undertake geotechnical studies in line with recommended Read and Stacey (2009) study
parameters. This criterion is widely used in the mining industry to gauge the level of geotechnical input
required for the different stages of a mining study.
Weathering Profile
The rock mass has a very rapid weathering profile change from oxide (clays) to competent basalt. The
weathering profile is deeper in the ultramafic units. All underground development is expected to be in
fresh ground except for the 2 vertical raise bores developed to surface for WTS and the vertical fresh
air shaft development for Gillett.
The expected depth of weathering and primary contact for each of the mines is:
•
WTS varies from 45m (Basalt) to 115m (Ultramafic).
•
Widgie 3 varies from 20m (Basalt) to 40m (Ultramafic).
•
Gillett varies from 25m (Basalt) to 80m (Ultramafic).
•
Armstrong varies from 25m (Basalt) to 60m (Ultramafic).
•
132N varies from 30m (Basalt) to 50m (Ultramafic).
Rock Mass Quality
Rock mass classification is a method to characterise the quality of the rock mass which is then used
for stability analysis and numerical modelling. Data used and parameters derived are from the
geotechnical logging of core. Both the NGI Q System and Geological Strength Index (GSI) were
assessed. Rock mass quality for Widgie Townsite, Widgie 3 and Gillett are summarised below in Table
4. The rock mass quality for Armstrong is shown in Table 5. Logged data was summarised into the
previously listed geotechnical domains. The data was also combined over the 4 deposits as they are
considered continuous lithological units. Typical cross sections of each deposit with the associated
lithological units are shown below in figures 2, 3, 4, 5 & 6.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
9
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Table 3 - Rock Mass Quality for WTS, GW3, 132N
Basalt 1
Basalt 2
Gillet Lode
Porphyry
Ultramafic
Statistic
RQD
Q'
GSI
RQD
Q'
GSI
RQD
Q'
GSI
RQD
Q'
GSI
RQD
Q'
GSI
Nbr. of observations
1297
1297
1297
167
167
167
169
169
169
63
63
63
2035
2035
2035
Sum of weights
3345.2
3345.2
3345.2
347.2
347.2
347.2
252.9
252.9
252.9
100.1
100.1
100.1
4300.4
4300.4
4300.4
Minimum (actual)
0
0.2
17.3
87
11.4
67.8
70
2.2
51.8
0
0.5
22
0
0.1
12
Maximum (actual)
100
800
94
100
533.3
94
100
800
91.6
100
533.3
212
100
1066.7
94
10th Percentile
96
16.7
67.3
95
25
72
90
12.3
63
75
6.8
55.3
92
8.3
59.9
1st Quartile
98
24.8
72.3
99
33.3
72.3
98
16.7
67.3
90
16.5
68
98
22
68.8
Median
100
48.5
76
100
130.7
89
100
50
78.7
94
24.5
71.3
100
33.3
72.3
3rd Quartile
100
100
82.2
100
200
92
100
100
88
98
100
86
100
98
82.7
90th Percentile
100
200
91.1
100
300
92
100
384
91.6
100
165.3
90
100
300
89
Mean
97.8
110
77.6
98.7
136.2
83.8
97.5
136
77.5
88.1
67.3
75.3
96.4
101.8
74.1
Variance
70.6
33906.3
77.3
6.3
14436.3
80
31.5
46764.4
109.6
444.6
8143.8
683.9
133.7
32854.6
143.3
Std. Dev.
8.4
184.1
8.8
2.5
120.2
8.9
5.6
216.3
10.5
21.1
90.2
26.2
11.6
181.3
12
Table 4 - Rock Mass Quality for W3 and WTS
W3 Lode
W TS L od e
Statistic
RQD
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
Q'
GSI
RQD
Q'
GSI
N b r . o f o b s e r v at i o n s
25
25
25
38
38
38
S u m o f w e i g ht s
3 0. 2
3 0. 2
3 0. 2
5 1. 7
5 1. 7
5 1. 7
Mi n i mu m ( ac t u al )
70
1 1. 9
70
1 8. 8
6. 3
36
M ax i m u m ( ac t u al )
1 00
5 33 . 3
94
1 00
5 33 . 3
94
1 0t h Pe r c e nt i l e
96
25
72
90
9. 8
61
1s t Q u ar t i l e
97
1 17 . 3
86
9 7. 5
1 2. 5
7 0. 3
Me d i a n
1 00
1 33 . 3
90
1 00
30
72
3r d Q ua r t i l e
1 00
2 00
92
1 00
75
7 2. 3
9 0t h Pe r c e nt i l e
1 00
3 00
92
1 00
5 33 . 3
94
Me a n
9 8. 2
1 51 . 9
8 6. 7
9 6. 8
1 03 . 4
7 3. 4
V ar i a nc e
1 6. 3
9 02 5 .3
61
9 1. 9
2 68 4 0
1 23
Std. Dev.
4
95
7. 8
9. 6
1 63 . 8
1 1. 1
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
10
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Table 5 - Rock Mass Quality for Armstrong
HWUM
LODE
UBAS
FWUM
LBAS
Statistic
RQD
Q'
GSI
RQD
Q'
GSI
RQD
Q'
GSI
RQD
Q'
GSI
RQD
Q'
GSI
Nbr. of observations
466
466
466
40
40
40
170
170
170
72
72
72
153
153
153
Sum of weights
1227.1
1227.1
1227.1
111.0
111.0
111.0
447.7
447.7
447.7
204.1
204.1
204.1
418.1
418.1
418.1
Minimum (actual)
0
0.2
18
0
0.5
26
0
0.9
8
0
0.7
26
0
0.1
10
Maximum (actual)
100
600.0
92
100
150
89
100
800.0
92
100
400.0
92
100
800
94
10th Percentile
49
2.7
51
48
2.2
49
69
7.8
58
64
4.4
53
80
7.2
59
1st Quartile
77
5.2
60
67
6.1
60
89
14.8
63
85
10.6
66
95
18.9
71
Median
93
12.4
70
95
16.3
69
97
22.9
74
97
23.8
72
100
100.0
89
3rd Quartile
98
25.0
75
98
49.2
81
100
50.0
76
100
50.0
82
100
133.3
89
90th Percentile
100
65.6
82
100
97.3
88
100
100.0
89
100
133.3
92
100
300
92
Mean
83.7
27.8
67.0
81.1
35.5
69.2
88.3
51.4
70.8
86.25
47.6
71.0
93.1
138.2
80.1
Variance
435.9
2927.3
173.4
503.4
1652.4
214.0
480.1
9600.4
196.5
564.15
4790.0
243.0
289.1
33990.9
257.7
Std. Dev.
20.9
54.1
13.2
22.4
40.6
14.6
21.9
98.0
14.0
23.75
69.2
15.6
17.0
184.4
16.1
Figure 2 -Widgie Townsite
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
11
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Figure 3 -Widgie 3
Figure 4 – Gillett
Figure 5 – Armstrong
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
12
Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
7 March 2024
Figure 6 -132N
All domains were categorised as good to very good based on the 25th percentile ‘Q’ values.
Coinciding with RQD measurements the various deposits and host rock domains have had uniaxial
compressive strength testing carried out on drill core. Testing by single stage triaxial tests (TRX) and
Indirect/Brazilian test (BTR) have resulted in Intact strength measurements and Hoek Brown Constants
being determined to characterise the rock mass as detailed in Table 6.
Tabl