Butchers Creek Gold Project Delivers Robust Scoping Study
Released
Released
Announcement PDF
1
ASX Announcement
ASX:WIN
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
12 November 2025
BUTCHERS CREEK GOLD PROJECT SCOPING
STUDY
Scoping Study confirms the technical and financial viability of developing
a standalone gold operation in the Kimberley region of Western Australia
with significant opportunities for upside identified
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
“Butchers Creek Scoping Study demonstrates the significant value in this project. It is a game
changer for WIN as a significant milestone in our company’s journey, only 12 months since
acquisition this study signals the first steps in establishing a new gold operation in the heart of the
Kimberley. The numbers speak for themselves, robust projected cashflow and a long life of mine,
underpinned by a high confidence resource with substantial upside.
What excites us most is the scale of the opportunity ahead. A 9-year mine plan with peak production
forecast at 37,000 ounces of gold per year, ongoing exploration at both Butchers Creek and Golden
Crown that could take this project to an entirely new level. Every additional drill hole has the
potential to drive resource growth, extend the life of mine and increase cashflow for years to come.
This is a transformational milestone for WIN. We are entering the next phase at Butchers Creek with
strong momentum and energy,moving swiftly to establish our licence to operate,advance feasibility
studies, and progress toward project delivery. Butchers Creek is set to generate lasting value for
shareholders, stakeholders and deliver meaningful economic benefits to the Kimberley region as a
whole. The WIN team is excited to lead this new chapter of growth and development for our
company.”
Cautionary Statement
The Scoping Study (“Study”) referred to in this announcementhas been undertaken by WIN Metals Ltd (WIN
or the Company) for the purposes of demonstrating a business case to support the development of
standalone open pit and underground gold mine with associated processing facility at WIN’s Butchers
Creek Gold Project (BCGP, Project or Butchers Creek) in Western Australia.
This Study is a preliminary technical and economic study of the potential viability of the Project. It is based
on low level technical and economic assessments that are not sufficient to support the estimation of ore
reserves. A level of accuracy of +/-40% is applicable in accordance with Scoping Study level of accuracy.
Further exploration and evaluation work and appropriate studies are required before WIN will be in a
position to estimate any ore reserves or to provide any assurance of an economic development case.
The Study is based on JORC 2012 Code Indicated and Inferred Mineral Resources defined within the Project,
with a production target comprising indicated (96%) and Inferred (4%) Mineral Resources over the life of the
mine. Investors are cautioned that there is low level of geological confidence in Inferred Mineral Resources
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
and moderate confidence in the indicated resources and there is no certainty that further drilling will result
in the determination of Measured or Indicated Mineral Resources, or that the production target will be
realised.
Of the Mineral Resource tonnages scheduled for extraction in this Study’s production target plan during the
firstfour years,approximately 98% is classified as Indicated and 2% as Inferred,incorporating the projected
3.5 year payback period. WIN has concluded that the financial viability of the project is not dependent on
the inclusion of the Inferred Resources and WIN has concluded that is has reasonable grounds for
disclosing a production target which includes Inferred Mineral Resource Material.
The Study is based on the material assumptions outlined in this announcement, including assumptions
about the availability of funding in the order of approximately $142 million. WIN considers all the material
assumptions to be based on reasonable grounds. However, Investors should note that there is no certainty
that WIN will be able to raise this funding when required. It is also possible that said funding may only be
available on terms that may be dilutive to or otherwise effect the value of WIN’s shares. It is also possible
that WIN could pursue other value realisation or funding strategies such as forward gold sales, royalty
streaming, gold prepay options, a sale, partial sale or joint venture of the Project. This could materially
reduce WIN’s proportionate ownership of the Project. While WIN considers all the material assumptions to
be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of
outcomes indicated by the Study will be achieved.
Notwithstanding many components ofthis study,such as pitshell design,underground mine design,capital
costs, processing operating costs and other amounts may be more accurate than +/- 40%, WIN has
concluded it has a reasonable basis for providing the forward-looking statements included in this
announcement and believes it has a ‘reasonable basis’ to expect it will be able to complete the
development of the Project as outlined in the attached Study.
This announcement has been prepared in compliance with the JORC Code 2012 Edition (JORC 2012) and
the ASX Listing Rules. All material assumptions on which the forecast financial information is based have
been provided in this announcement and are also outlined in the attached JORC 2012 table disclosures.
Given the uncertainties involved, investors should not make any investment decisions based solely on the
results of this Scoping Study.
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to announce the completion of a
Scoping Study for the Butchers Creek Gold Project, located 30km south-east of Halls Creek in
Western Australia (Figure 1). The Study confirms the technical and financial viability of developing
a standalone operation with both open pit and underground mining operations.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
3
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Figure 1: Butchers Creek Gold Project Location
Butchers Creek Gold Project – Scoping Study Highlights:
• Proposed operation includes open pit cutback, underground mine, 600ktpa CIL Processing
Plant, and associated infrastructure.
• Life of Mine (LoM) 9 years, processing 3.29Mt @ 2g/t Au for 200koz of gold recovered
• Full production profile averaging 33kozpa (years 5 to 8)
• Peak annual gold production of 37koz in Year 5
• Pre-production capital cost is estimated at A$142 million inclusive of:
• Processing plant - A$70 million
• Mining and supporting infrastructure
• Pre-production mining and general administration costs
• Scoping Study demonstrates robust financial outcomes, based on a gold assumption of
A$5,385oz
• Free cash flow - A$288 million
• Net Present Value (8%) – A$143 million
• Internal Rate of Return – 25%
• Payback Period – 3.5 years
• C1 (Direct Operating Cost) – A$2,592 per ounce
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
4
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
• All In Sustaining Cost (AISC) - A$3,032 per ounce
• Scoping Study based on the Mineral Resources defined at Butchers Creek deposit only.
• Significant upside potential from ongoing exploration at Butchers Creek targeting resource
growth and the inclusion of the nearby Golden Crown gold deposit as a potential future
satellite ore source.
Key Study Outcomes and Summary
WIN Metals evaluated multiple development scenarios for the Butchers Creek Gold Project. The
construction of a 600,000 tonne per annum Carbon-in-Leach (CIL) processing plant and associated
infrastructure onsite at Butchers Creek has been identified as delivering the most favourable
financial outcome for the Project.
The financial model for the Project was undertaken on a 100% ownership basis and incorporates
the principal assumptions presented in Table 1 below.
Table 1: Key Physical Assumptions
Assumptions
Unit of
Measure
Open Pit Mine Duration years 0.9
Underground Mine Duration years 7.75
Processing Duration years 7.25
Open Pit Waste Mined kt 1,446
Open Pit Ore Mined kt 123
Open Pit Strip Ratio 11.8
Open Pit Grade g/t Au 2.04
Open Pit Mined Ounces koz 8
Underground Waste Mined kt 541
Underground Ore Mined kt 3,165
Underground Grade g/t Au 2.00
Underground Mined Ounces koz 203
Mine Production Target
Total Ore Mined kt 3,288
Grade g/t Au 2.00
Mined Ounces koz 211
Processing Physicals
Tonnes Processed kt 3,288
Grade g/t Au 2.00
Ounces Recovered koz 200
The financial model for the Study applied a gold price of A$5,385 per ounce, which is below the
prevailing spot price observed between 1 September 2025 and 1 November 2025. Based on these
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
5
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
assumptions, the Project is forecast to deliver an undiscounted pre-tax cash flow of A$288 million,
a pre-tax NPV at 8% of A$143 million, and a pre-tax, unleveraged IRR of 25%.
Financial Summary for the Project is outlined below in Table 2.
Table 2: Scoping Study financial assumptions and results
Key Financial Assumptions
Gold Price A$/oz 5,385
Discount Rate % 8
Diesel Price A$/litre 1.75
Cement Price A$/t 587
Processing Plant Gold Recovery % 94.6
Unit Power Cost A$/kWhr 0.37
Refining Cost (incl. Transport) A$/oz 15
Capital Expenditure
Pre Production Capex A$M 113
Pre Production Cost A$M 29
Sustaining Capex A$M 50
Post Production Capex Mining A$M 67
Total Capex (including Pre Production cost) A$M 259
Unit Costs
Unit Operating Costs (C1) A$/t Processed 158
Unit Mining Operating Costs (Inc Power) A$/t Processed 46
Unit OP Mining Operating Costs (Inc Power) A$/t Processed 103
Unit UG Mining Operating Costs (Inc Power) A$/t Processed 84
Unit All in Sustaining Costs A$/t Processed 184
Unit All in Costs A$/t Processed 228
Operating Expenditure
Total Operating Costs A$M 518
Total Past Mine Gate Costs (Refining, Transport, Royalties) A$M 41
Project Returns
Total Net Revenue (Minus Past Mine Gate) A$M 1,036
Total Cumulative Cashflow (Pre Tax) A$M 288
Net Present Value (NPV 8%) A$M 143
Internal Rate of Return (IRR) % 25
Payback Period (Pre-Tax from start of gold production) Years 3.5
All in Sustaining Costs (AISC) A$/oz 3,032
Comparative C1 Cash Cost A$/oz 2,592
Production Target
Total recoverable gold production target for the life of the Project is estimated at approximately
200koz. The gold production schedule, by resource classification, is presented in Figure 2.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
6
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Importantly, 96% of gold production during the first four years is sourced from Indicated Resources,
with only 4% classified as Inferred. This strong weighting towards Indicated material provides
confidence in the Project’s ability to repay pre-development capital within the forecast payback
period of approximately 3.5 years. This ratio remains consistent across the life of mine, with
Indicated Resources contributing 96% to the cumulative production target.
Figure 2: Production profile by resource classification for the life of the Project
Across the LOM, average annual gold production is projected at 25koz. This includes an initial three
year ramp up as underground operations are established, after which annual output is expected to
increase to average approximately 33koz for years 4 to 7. Production is then forecast to taper in the
final year, with annual output of approximately 16koz.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
7
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Figure 3: Annual LoM processing target
Open Pit Design
The primary objective of the Butchers Creek open cutback is to enhance pit stability and establish
safe, practical locations for developing underground mine access portals. A pit optimisation study,
utilising a gold price of A$4,400 per ounce and applying geotechnical stability constraints derived
from existing pit data, resulted in a targeted cutback along the southern section of the west wall.
This design not only optimises pit resources but also allows for the construction of a new 12m wide
single lane haul ramp providing direct access to the two proposed underground portal sites (refer
Figure 4). The open pit production target is approximately 123kt at 2.0g/t Au for 8koz with 99% of the
mined ore classified as indicated resource.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
8
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Figure 4: Butchers Creek open pit cut back design
Underground Mine Design
Access to the underground orebody will be achieved via a conventional decline commencing from
the Butchers Creek open pit cutback. The underground layout incorporates two portals, one
dedicated to equipment access and the other to ventilation. The main decline follows a figure of
eight configuration and features a compact profile enabling efficient haulage and faster
development compared to typical modern declines.
Underground mining will utilise a bottom up, panel long hole stoping method, employing both waste
rock and cemented rock fill to maximise ore recovery and maintain ground stability (see Figure 5).
The underground production target was calculated using a 1.0g/t Au cut-off during the stope
optimisation process, with adjustments made for dilution, recovery, and practical mining
considerations for each stope panel. This work has defined a production target of approximately
3.2Mt at 2.0g/t Au, containing 203koz of gold.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
9
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Figure 5: Butchers Creek underground mine deign
Processing Plant Design
MACA Interquip Mintrex (MACA) has been engaged to design and quote a 600,000 tonne per annum
carbon-in-leach (CIL) processing facility for the Project. The proposed flowsheet is outlined below:
Mined ore will be delivered to a run-of-mine bin and undergo primary and secondary crushing before
being transferred to a fine ore storage bin, which regulates consistent plant feed rates. Ore from the
storage bin is then ground in a ball mill to achieve a particle size of 80% passing 75 microns. The
resulting slurry is processed through cyclones and a vibrating trash screen prior to entering the CIL
circuit.
A portion of the cyclone underflow is diverted to a Knelson gravity concentrator for gravity gold
recovery. Gravity concentrates are treated in an Acacia leach reactor, while coarse material is
recirculated to the ball mill for further grinding.
Gold recovery in the CIL circuit is conducted in six tanks, providing approximately 24 hours of
residence time for efficient cyanide leaching and gold adsorption. The circuit comprises one leach
tank followed by five adsorption tanks. Activated carbon is introduced at the final tank and pumped
counter current to the slurry, optimising gold recovery efficiency.
Loaded carbon from the first adsorption tank is processed through a pressure elution circuit using
hydrochloric acid, hot cyanide, and caustic to strip gold into solution. Gold from both the elution
and Acacia circuits is subsequently recovered via electrowinning onto stainless steel cathodes,
followed by calcining and smelting to produce gold doré bars. Plant tailings will be pumped to a
dedicated tailings storage facility.
Site Layout
The site layout, illustrated in Figure 6, has been carefully designed to efficiently support all aspects
of mining operations. Key features include integrated open pit and underground mine access, a
modern accommodation camp for up to 200 personnel, fully equipped workshops and storage
areas, administration offices, electrical infrastructure, processing plant, and run-of-mine ore (ROM)
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
10
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
pads. Existing infrastructure includes waste dumps, a tailings dam, and a dedicated mine and
process water lake.
Figure 6: Site Layout
Sensitivity Analysis
Movements in the Australian dollar gold price, primarily influenced by fluctuations in the US dollar
gold price and the AUD:USD exchange rate have a direct impact on project revenue and forecast
cash flows. Table 3 below sets out the projected effect on key financial metrics under various
Australian dollar gold price scenarios, clearly illustrating the Project’s sensitivity to changes in
market conditions. The base case scenario for this Study applies an Australian gold price of $5,385
per ounce.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
11
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Table 3: Project Financial Sensitivity Analysis
Gold Price A$/oz $ 3,846 $ 4,615 $ 5,385 $ 6,154 $ 6,923
Payback first gold production Month N/A 56 41 35 32
Max negative cashflow A$M -164 -142 -142 -142 -142
Free cash flow A$M -9 131 288 436 585
NPV 8% pre-finance, pre-tax A$M -54 45 143 241 339
IRR pre-tax % N/A 14 25 34 42
Capital Costs
Project capital costs have been determined wherever possible from recent pricing, obtained within
the last six months, from reputable suppliers and contractors experienced in the Kimberley region
of Western Australia. These estimates cover both pre-production capital outlays and sustaining
capital required for the mine’s full operational life.
Key capital costs are summarised below:
Table 4: Capital cost estimate
Pre-Production Source A$M
Processingfacilityand supportinginfrastructure MACA 71
Admin capital+G&A Inhouse/MACA 25
Underground mining In house 16
Open pit mining In house 1
Pre Production Cost In house 29
Total 142
Post Production A$M
Sustaining In house 50
Post Production Capex(Underground) In house 67
Total 117
Total LoMCapital 259
Operating Costs
Operating cost estimates for the Project have been constructed utilising recent quotations secured
within the past six months from qualified vendors and contractors experienced in the Kimberley
region of Western Australia. The cost model comprehensively addresses the core operational
components required for sustainable mine performance over the life of the project.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
12
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
The key operating cost categories are as follows:
Figure 7: Operating cost estimate
Operating Cost A$M $/t Milled A$/oz
ProcessingFacilityand SupportingInfrastructure 152 $ 46 $ 758
Admin Capital+G&A 87 $ 27 $ 437
Underground Mining 266 $ 81 $ 1,333
Open Pit Mining 13 $ 4 $ 64
C1 Cash Cost 518 $ 158 $ 2,592
Royalties 37 $ 11 $ 189
SustainingCapital 50 $ 15 $ 252
All in SustainingCost (ASIC) 606 $ 184 $ 3,032
Project Cumulative Cashflow
The financial model demonstrates that the maximum negative cashflow exposure for the Project is
A$142 million, corresponding with the pre-production capital investment phase. Over the LOM the
Project is forecast to generate a cumulative, undiscounted pre-tax cashflow of A$288 million,based
on an Australian gold price of $5,385 per ounce.
Figure 8: Project cumulative cashflow timeline (production years)
Funding
The Scoping Study estimates that total project funding of approximately A$142 million will be
required to cover capital and operating costs from the commencement of plant construction
through to the completion of commissioning and the start of gold production. WIN does not
currently have funding in place and would need to undertake further significant capital raise(s) to
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
13
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
fund the Project’s development following completion of further economic studies and once a final
investment decision is made. It is anticipated that this funding will be sourced via a combination of
debt and equity, to be secured prior to the commencement of project construction. It is also
possible that WIN could pursue other value realisation or funding strategies such as forward gold
sales, royalty streaming, gold prepay options, a sale, partial sale or joint venture of the Project. The
Company believes there is a reasonable basis to assume project funding will be available as
required, supported by the following:
• The Project’s robust technical and economic fundamentals indicate the potential for
attractive returns on capital and generation of substantial free cash flow, even at conservative
gold price assumptions, providing a strong platform for securing debt and equity funding.
• The Company has an established track record of raising equity finance to support the
exploration and evaluation of the Butchers Creek Gold Project having completed two
oversubscribed placement raisings (refer ASX announcements “WIN Completes Strongly
Supported $A3.6 Million Placement” 9 September 2024” and “WIN to Accelerate Drill Program
at Radio Following Placement” 21 August 2025) since acquisition of the Project.
However, investors are advised that there is no certainty that the Company will be able to raise the
funding when required. Typical project development financing is expected to involve a mix of debt
and equity, and it is possible that such funding may only be accessible on terms that could be
dilutive to, or otherwise impact the value of, the Company's existing shares.
Development and Production Timelines
At Scoping Study stage no timeframe for commencement of Project development has been set.
Further economic studies are required to improve the current level of accuracy of +/-40% applicable
to the Scoping Study level of accuracy which in turn will lead in to a Project development schedule.
WIN has already commenced the process of scoping the requisite development approvals from the
relevant stakeholder groups and governmental bodies. It is anticipated that these approvals will be
received over the course of WIN completing the further economic studies on the Project and before
a final investment decision is made.
The Company estimates completion of exploration lease and prospecting lease conversions to
mining leases to take up to 18 months to complete which would be the earliest a Project final
investment decision could be made.
The Company anticipates drilling its Golden Crown resource during the next field season, this
deposit contemplated as being a contributor to theoverall Project for which we anticipate economic
studies to be completed by the end of 2026.
Pricing of costs within the body of the study are based upon Q3 2025 costs. Readers should be
cautioned that escalation in costs is outside the control of the Company and may at the time of
development lead to the Project being materially different in terms of viability. Costs in subsequent
economic studies will be refined further increasing the levels of accuracy using up to date estimates
at that time.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
14
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Conclusions and Recommendations
The Butchers Creek Gold Project (BCGP) demonstrates robust potential as a standalone,
economically viable operation, based on a production target of approximately 3.3Mt at 2.0g/t Au for
211koz, with an estimated 96% of material classified as Indicated. The nearby Golden Crown
deposit (located 4km north and not included in this Study) could further enhance project economics
in future evaluations, subject to additional drilling to improve confidence levels in the currently
Inferred Mineral Resource of approximately 400kt at 3.1g/t Au for 38koz3
.
It is recommended that the Company initiate competitive tendering with mining contractors to
refine cost assumptions and optimise operational efficiency. Further opportunities to reduce
operating costs may include sourcing key consumables directly from Indonesia rather than Perth.
Given the significance of power as an operating expense, the adoption of renewable energy
solutions is expected to deliver net savings for the project.
Ongoing metallurgical testwork has the potential to enhance process design and gold recoveries,
with results expected in the coming months. While capital expenditure requirements remain
material and consistent with industry benchmarks, the evaluation of suitable dormant processing
plants, both locally and offshore, could provide pathways to lower upfront costs. Moreover,
increasing throughput by integrating additional ore from nearby deposits may further reduce capital
intensity and operating costs, enhancing the overall robustness of project economics.
Following finalisation of updated Mineral Resource estimates, the mine plan, project schedule, and
financial model should be revised to incorporate any extensions at Butchers Creek and Golden
Crown. This will support the definition of a JORC compliant Ore Reserve and reinforce the
foundation for long-term project viability.
Given the regulatory environment in Western Australia, it is strongly recommended to commence
the permitting process and establish a permitting framework as a high priority. Comprehensive
details and all supporting data are provided in the full November 2025 Scoping Study Report,
included in the appendices to this announcement.
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
15
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Approved by: The Board of Directors
-ENDS-
For further details please contact:
Steve Norregaard
Managing Director
WIN Metals Ltd
steve@winmetals.com.au
0472 621 529
Butchers Creek Gold Project Delivers Robust Scoping Study
12 November 2025
16
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
About WIN Metals
WIN Metals (ASX: WIN) is a mineral exploration company holding 350km2
of granted tenure in the
Southern Goldfields and Kimberley regions of Western Australia. WIN’s mineral endowment
includes gold, nickel and lithium resources within the Company’s extensive tenure.
The Mt Edwards Nickel and Faraday-Trainline Lithium Projects are situated near Widgiemooltha,
approximately 80km south of the regional centre of Kalgoorlie-Boulder and 30km south of
Kambalda. The Mt Edwards Nickel Project is a collection of eleven (11) nickel deposits with a total
mineral resource of 12.7Mt @ 1.43% Ni for 180,900t of contained nickel1
. The Faraday-Trainline
Lithium Project has a reported mineral resource of 1.96 Mt at 0.69% Li2O2
.
The Butchers Creek Gold Project is located 30km southeast of Halls Creek in the Kimberley region
of Western Australia. It is a historic gold production centre hosting a global mineral resource of
5.6Mt at 1.98g/t Au for 359,000oz3
of gold. Previous mining operations at Butchers Creek produced
52,000 ounces of gold between 1995 and 1997.
WIN recently acquired the Radio Gold Project in September 2025, located 8km north of Bullfinch,
approximately 38km northwest of Southern Cross and about 400km east of Perth in the Yilgarn
region of Western Australia. Over its production life, the Radio mine has produced approximately
71,000 ounces at an exceptionally high grade of 38g/t Au.
Table 5: WIN Metals Butchers Creek Gold Mineral Resource Estimates
Deposit Last Update Resource Classification Tonnes (Mt) Au g/t Contained Gold (Oz)
Butchers Creek Apr-25
Indicated 3.58 2.24 258,000
Inferred 1.65 1.18 63,000
Golden Crown Jun-21 Inferred 0.40 3.10 38,000
Total Indicated + Inferred 5.63 1.98 359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and