WIN Annual Report 2024
Released
Released
Announcement PDF
ASX: WIN
winmetals.com.au
2024
A N N UA L R E P O R T
Year Ending 30 June 2024
The change of name to WIN Metals more accurately reflects the Company’s
current activities and mineral endowment including Lithium, PGEs as well
as Nickel, and its intention to diversify its portfolio by seeking other and
complementary value accretive opportunities.
Contents
4 Chairman’s Letter
Auditors
52 Independent
Report
Statement
60 Consolidated
of Changes in Equity
of
6 Review
Operations
56 Directors’ Declaration
Statement
61 Consolidated
of Cash Flows
Social
18 Environment,
and Governance
Entity
57 Consolidated
Disclosure Statement
to the Consolidated
62 Notes
Financial Statements
31 Directors’ Report
Statement
58 Consolidated
of Profit or Loss and Other
89 Additional Information
Statement
59 Consolidated
of Financial Position
97 Corporate Directory
Comprehensive Income
Independence
51 Auditors
Declaration
Chairman’s
Letter
Dear Shareholder,
As Chairman of the Company and on behalf of my fellow
Directors I am pleased to present the Annual Report for
2024, another highly active year for the Company.
During the year the Company made significant
progress
developing
the
100%
owned
Mt Edwards Lithium and Nickel Projects.
Notwithstanding this progress a substantial
downturn in commodity price performance
for both nickel and lithium made this a
challenging year for the Company. As support
for these commodities became more and
more scarce through the period, the Board and
Management team worked tirelessly against
significant market headwinds, pursuing a
strategy of preserving value in current assets
and unlocking value through diversification.
After the reporting period, in line with this
strategy, WIN announced the acquisition
of the high-grade Butchers Creek Gold
Project in the Kimberley region of Western
Australia. The Project hosts an existing
mineral resource with growth potential and
production history making it an excellent fit
for the Company given the strong gold price
performance and outlook, as well as the
recognised mine building and production
skillset embedded within the team. This
acquisition is subject to shareholder approval.
At Mt Edwards, despite the challenging nickel
price environment, the Company continued
to demonstrate the viable development
potential for the nickel project with significant
drilling activity resulting in mineral resource
4
updates on four deposits and completion of a
scoping study to assess an 800ktpa standalone
operation. The value proposition was further
demonstrated by the partial divestment of
the Munda nickel deposit, also announced
post year end generating valuable income
without sacrificing any substantial nickel value.
Building on our lithium discoveries last
year, the Company also achieved a number
of significant milestones as we executed
development initiatives for the FaradayTrainline Lithium Project. Along with significant
progress on metallurgical test work the
Company achieved an uplift of 375% in the
total lithium endowment. In addition, our
exploration team successfully extended the
lithium trend to 1.2km with four additional
high-grade prospect areas identified warranting
further evaluation when the time is right.
After successfully meeting the conditions
precedent set by the WA Government, all
mining approvals at Faraday were received
within 12 months of stepping on the ground.
While navigating the prevailing challenges
in the nickel and lithium space, we have
continued
to
diligently
execute
our
development strategy and deliver meaningful
progress towards our objectives. The scale
of our activities over the year, coupled
with protracted mineral exploration sector
headwinds, necessitated an additional funding
Annual Report 2024
initiative and we are grateful for the rights
issue support from our loyal shareholders.
Post financial year end and to enable the
acquisition of the Butchers Creek Gold Project
the Company successfully raised $3.6m from
existing and new shareholders and we welcome
those new shareholders to our register.
Shareholders are set to approve the shares and
attaching unlisted options to be issued as a
result of the capital raising at a General Meeting
to be held on 21 October 2024. Shareholders
will also be asked to approve the issue of
shares to the vendor of the project, Meteoric
Resources Limited, as part consideration for
the acquisition and we welcome Meteoric to
our register. The support of our shareholders
further validates the diversification strategy
and the prospectivity of the Project.
With exploration having commenced at the
Butchers Creek Gold Project, together with
cost optimisation initiatives now in place at
the Mt Edwards Project, WIN is well
WIN Metals Limited
positioned
to
continue
executing
the
Company’s strategy and unlock the latent
value we have built for shareholders.
Acknowledging the addition of lithium and
gold into the portfolio, the shareholders
approved a change in the company
name from Widgie Nickel Limited to WIN
Metals Limited post-financial year end.
On behalf of the Board, I’d like to thank our
management team and all our employees
for their efforts throughout the year and
to our shareholders for your continuing
support and interest in the Company.
I look forward to providing updates on
our progress throughout the year ahead.
Andrew Parker
Chairman
5
Review of
Operations
WIN Metals Ltd
Review of Operations
REVIEW OF OPERATIONS
The directors of WIN Metals Ltd (“Company” and “WIN”) present the Company’s financial report for the Company and
its controlled entities (“Consolidated Entity” and “Group”) for the year ended 30 June 2024.
WIN Metals Ltd continued to advance its dual strategy of lithium and nickel development at the Faraday-Trainline
Lithium Project, and contiguous Mt Edwards Nickel Project, a unique collection of 12 nickel sulphide deposits along
15km of strike.
At a General Meeting held on 1 July 2024, a special resolution was passed by shareholders to change the Company
name from Widgie Nickel Limited to WIN Metals Ltd 1. There was no change to the ASX ticker code (ASX: WIN).
0F
Figure 1 - WIN tenure and surrounding projects 2
1F
1
ASX Announcement 3 July 2024 – Change of Company Name
For third party Mineral Resource estimates, please refer to the following announcements:
Mineral Resources Mt Marion Lithium Operation: MIN ASX Announcements 22/09/2023:
Mineral Resources and Ore Reserve Update, 21/02/2024
Mt Marion underground Mineral Resource Update;
Develop Dome North Deposit MRE: ESS ASX Announcement 22/12/2022: Dome North Mineral Resource Estimate Upgrade;
Mineral Resources Bald Hill Lithium Mine: TAW ASX Announcement 06/06/2018: Lithium Ore Reserve Increase at Bald Hil
2
WIN Metals Limited
1
7
WIN Metals Ltd
Review of Operations
Butchers Creek (Gold) Acquisition to be added to WIN’s portfolio
Subsequent to the end of the financial year, on 28 August 2024 the Company has announced an acquisition to acquire
the high-grade gold project, Butchers Creek (formerly known as Palm Springs Gold Project). The project in the Kimberley
region of Western Australia is being acquired from Meteoric Resources NL (ASX:MEI) via a tenement sale agreement.
This exciting project addition comprises an already established high-grade mineral resource of some 357,000 oz
(5.6Mt@2.0g/t) of gold based around two resource areas, a production history of 52,000 oz produced between 1995
and 1997, and a host of advanced high order gold exploration targets from over 60 known gold occurrences on a 100
sq.km tenement package.
Figure 2: Location of Butchers Creek Project
Consideration for the transaction comprises the following:
I.
$50,000 + GST “Exclusivity Fee”;
II.
$950,000 + GST (being $1,000,000 minus the Exclusivity Fee; and
III.
WIN Consideration Shares to the value of $1,750,000 (calculated based on a deemed issue price per
WIN Share equal to the issue price applicable to the WIN capital raising). The WIN Consideration Shares
will be subject to a 12-month voluntary escrow agreement.
Consideration payable post settlement comprises:
I.
II.
$1,000,000 + GST payable to Meteoric 18 months after Settlement; and
An additional $1,250,000 + GST upon the production by the Company of 20,000 troy ounces of gold (in
aggregate) at the Project.
2
8
Annual Report 2024
WIN Metals Ltd
Review of Operations
As a condition precedent to concluding the transaction WIN will be required to complete a capital raising of not less
than $3m within 75 days of agreement signing, with the majority of the raised funds to be dedicated to the exploration
and development of Butchers Creek.
Completion of the transaction is also subject to:
•
the Company obtaining shareholder approval for the purposes of Listing Rule 7.1 to issue the WIN
Consideration Shares; and
•
the parties receiving all the regulatory and third party approvals that are required for the transaction to
proceed.
Mt Edwards Nickel Project
WIN controls a dominant ~240 km2 land package over the prolific nickel-producing Widgiemooltha Dome in Western
Australia. The Mt Edwards Nickel Project is positioned adjacent to key infrastructure, located just 80km south of the
major regional centre of Kalgoorlie and 30km south-west of Kambalda.
Figure 3: Location map of WIN's Mt Edwards Project Area
* All Resources stated at 1% Ni lower cut, other than Armstrong, Widgie Townsite, Widgie 3 and Gillett at 0.7% Ni lower cut-off
Extensive drilling campaigns throughout the year were highly successful in growing the resource base and increased
confidence resulting in four mineral resource estimate (MRE) updates across the Mt Edwards Project area, including
3
WIN Metals Limited
9
WIN Metals Ltd
Review of Operations
the Armstrong, Gillett, Widgie 3 and Widgie Townsite deposits. Subsequent to the year end, WIN announced a partial
divestment transaction for the Munda tenement that will yield $1.2m 3.
2F
The Mt Edwards Nickel Project comprises 12 separate deposits, now with a current Total Mineral Resource Estimate of
13.04Mt grading 1.45% nickel for *188,160 tonnes (*following completion of the Munda tenement divestment
transaction referred to above (Table 1)).
Table 1- Win Metals Total Nickel Mineral Resources
Indicated
Deposit
Inferred
TOTAL Resources
Tonne
Nickel
Tonne
Nickel
Tonne
Nickel
Nickel
(kt)
(%)
(kt)
(%)
(kt)
(%)
Tonnes
Gillett
2,267
1.35
871
1.16
3,138
1.30
40,770
Widgie 3
512
1.34
222
1.95
734
1.53
11,200
Widgie Townsite
1,649
1.60
853
1.38
2,502
1.53
38,260
Armstrong
949
1.45
10
1.04
959
1.44
13,820
132N
34
2.9
426
1.90
460
2.00
9,050
Munda
381
1.91
508
1.91
7,260
Cooke
154
1.30
154
1.30
2,003
Inco Boundary
464
1.20
464
1.20
5,590
McEwen
1,133
1.35
1,133
1.35
15,340
McEwen Hangingwall
1,916
1.36
1,916
1.36
26,110
Mt Edwards 26N
871
1.43
871
1.43
12,400
Zabel
272
1.9
53
2.04
325
1.96
6,360
TOTAL
5,693
1.48
7,355
1.42
13,038
1.45
188,160
* All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni cut- off. Tonnes and grade
have been rounded to reflect the relative uncertainty of the estimates.
* Munda Mineral Resource has been reported below 235mRL to reflect WIN’s proportionate ownership following the divestment.
Standalone Mt Edwards Scoping Study 4
3F
In early March 2024, the Company released a Scoping Study on the Mt Edwards Nickel Project. WIN commissioned the
Scoping Study for the purpose of carrying out a preliminary assessment of the technical and financial viability of a
standalone nickel mining and processing operation.
The Scoping Study assesses the mining and processing of 5.05Mt of mineralisation grading 1.56% Ni over an initial six
year mine production life (the “Production Target”):
•
•
•
•
•
800ktpa standalone nickel concentrator producing 103,000t of concentrate pa @ 10.1% Ni concentrate for 10,380t
of contained nickel per annum.
Scoping Study undertaken at a base case assumed US$24,000/t nickel, the approximate midpoint of the nickel
price during 2023 and in line with other recent ASX peer studies.
Scoping Study based only on the mining of Widgie Townsite (WTS), Gillett/Widgie 3 (GW3), Armstrong (ANM) and
132N with seven remaining deposits with upgrade potential that can be included in subsequent studies.
Scoping Study provides sufficient confidence to move to a Pre-Feasibility Study for the Mt Edwards Nickel Project.
Studies examining opportunities to improve viability by considering downstream options are now being pursued.
The mining plan for the Scoping Level Study evaluates Widgie Townsite, Gillett, Widgie 3, Armstrong and 132N deposits
that contain Mineral Resources of 7.79Mt at 1.45% Ni for 113,100t of contained nickel.
The proposed operation consists of four underground mines, an 800ktpa nickel concentrator, a 250 room accommodation
village, a 15.5km 33kV/11kV overhead HV powerline, site offices/workshops, a central administration office complex and
3
4
ASX Announcement 23 July 2024 – Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN (Updated)
ASX Announcement 7 March 2024 – Standalone Mt Edwards Project Scoping Study
10
4
Annual Report 2024
WIN Metals Ltd
Review of Operations
a core yard facility. The operations will mine nickel ore that will be carted to a centrally located nickel concentrator to
produce a nickel concentrate.
The underground mines were each designed with a figure 8 style capital development decline access for efficient mining
and services installation. The mine designs utilise relatively small cross section haulage declines with dimensions of
(5.2mH x 5.0mW) suitable for 40t payload ejector trucks. These smaller declines allow for faster development rates, less
blast holes, less ground support and less waste rock removal relative to the standard decline dimensions (5.8mH x
5.5mW). Mine planning has incorporated full main infrastructure engineering designs for HV power, ventilation, pumping,
water supply and secondary means of egress for each mine. The main mining method for the four underground mines can
be best described as a bottom up panel long hole stoping method with waste (WRF) or cemented rock fill (CRF).
The Production Target assessment process used the current Mineral Resource models and applied a 0.9% Ni grade cutoff during the Mine Stope Optimiser (MSO) stope selection process. This has provided a raw mining volume estimate for
each Resource. Further mining dilution and recovery factors have then been applied along with practical economics for
each individual stoping panel. This process has resulted in a Production Target of 5.05Mt grading 1.56% Ni containing
78.8kt of contained nickel metal for the Project. The Production Target comprises 77% of Resources classified as
Measured/Indicated and 23% as Inferred.
The focus of the first two (2) years of the mine plan calls for the development of the Widgie Townsite (WTS), and Gillett/
Widgie 3 (GW3) underground mines. This pre-production stage of the operational plan incorporates the construction of a
HV powerline, concrete batch plant, main administration complex, nickel concentrator and accommodation village.
Completion of the accommodation village is scheduled for month 4, energising of the main HV powerline month 5 and
commissioning of the processing plant month 16. The Armstrong underground mine is scheduled for commencement at
the start of year 5 with commencement of the 132N underground mine scheduled for the start of year 5 month 10.
Monthly performance for the Project after ramp-up averages 68kt of ore produced and 450m of jumbo development
completed. In total for the four underground mines, there is 15.2km of main haulage way development and 48.7km of total
mine development to be completed. The number of jumbo development crews peaks at 4 in year 3 averaging 2.1 jumbo
development crews over the life of the operations. During the Project, there is 2.4Mt of WRF and 0.67Mt of CRF required
to be placed in stope voids. In total, there is 19.1Mtkm of trucking material movement. The average load and haul fleet
size consists of six loaders and six trucks. The mining workforce including mobile maintenance during the Project
averages 145 persons with a peak of 193 persons in year 6.
The proposed processing flowsheet consists of a 220t/h 3 stage mobile crushing circuit producing crushed material to
minus 10mm. The crushed material is conveyed to a fine ore bin of 14hr live capacity (1,400t) before being fed into a
100t/h ball mill circuit. Material is ground to P80 53 micron in the milling circuit then proceeds into the first conditioning
tank with chemicals added prior to entering the rougher and scavenger flotation cells. Tailings are then transferred to a
tailings thickener with a thickened tails stream of 50% solid pulp density subsequently pumped to the tailings storage
facility. Sulphide minerals recovered from the rougher and scavenger float cells are fed into a second conditioning tank
prior to entering the cleaner cells to improve the nickel grade and quality of the concentrate. Cleaned concentrate collected
from the cleaner float cells is then pumped to the concentrate thickener before dewatering and washing within a pressure
filter. The filter cake of 6% moisture is discharged for storage in a shed ready for transport and shipping.
When in full production, the maximum milling rate applied is 70kt per month with average monthly concentrate production
for the Project being 8.6kt. The targeted concentrate grade for the processing plant is 10.1% nickel with an average nickel
recovery of 79%. The concentrate product will contain payable quantities of nickel, cobalt and palladium. After being
stockpiled on site the concentrate will be transported to the Esperance Port for overseas export upon sufficient product
being available ready for shipment.
The operations will utilise a fully Fly in/Fly out (FIFO) workforce with accommodation provided by the 250 room onsite
accommodation village. Transport to and from the Project has been costed utilising three (3) charter flights per week flying
from Perth to the Kambalda airport. Full manning levels for the operation averages 240 over the life of the Project with a
peak of 290 in year 5. Average non mining workers at full production is 77 comprising 41 people allocated for the
processing plant, the balance in administration or support services. Average personnel onsite for the Project is 159
persons. During the village construction period an offsite accommodation facility in Kambalda will be utilised.
The Project operations are scheduled to reach full commercial production in month 16 with the estimated pre-production
capital cost being AUD$257M. When in full production the average monthly operating costs for the operation is AUD$10M.
During this period capital costs per month average AUD$2.6M, fluctuating between AUD$409k up to AUD$8.6M. The
estimated total unit operating costs over the life of the Project is AUD$161/t milled with total capital costs of AUD$433M.
The Project is estimated to generate AUD$402M free cash over a 94 month period with a maximum negative cashflow of
AUD$269.2M in month 16 at a US$24,000/t Ni price applying an exchange rate 0.65 AUD/USD. The estimated pre-mine
gate unit operating nickel production cost is US$3.67/lb. Total past mine gate costs have been estimated at AUD$230.2M,
which includes all third-party royalties and AUD$43.5M Western Australian State royalties. The calculated NPV at an 8%
discount rate for the Project is AUD$197.4M and internal rate of return of 22.9%.
5
WIN Metals Limited
11
WIN Metals Ltd
Review of Operations
From the current defined Production Target of 5.05Mt @ 1.56% Ni, full operation mine production can be achieved for 6
years. There are seven additional defined Mineral Resources (refer Table 1) located at the Mt Edwards Nickel Project
providing substantial upside and high probability of mine life extending beyond the Scoping Study projected life.
These additional Mineral Resources will be assessed and ultimately exploited, if viable, to provide an increase to the
production cashflow and mine life of the Project.
Table 2 - Mt Edwards Nickel Project Scoping Study Key Outcomes
PARAMETER
UNIT
PROJECT TOTAL
KEY ASSUMPTIONS
Nickel Price
US$/tonne
Diesel Price
US$/litre
24,000
1.20
Exchange Rate
AUD:USD
0.65
Discount Rate
%
8.0
Concentrator Nickel Recovery (Ni)
%
79.0
%
80.0
Offtake Nickel Payability
Unit Power Cost
AUD$/kWhr
0.20
Total Concentrate Transport Costs
AUD$/wmt
110.97
Life of Mine
Months
94
Total Ore Mined
Tonnes
5,047,555
Total Jumbo Development
metres
48,734
Total Truck Material Movement
tkm
19,171,620
Total Ore Milled
dmt
5,047,555
Average Feed Grade
% Ni
1.56
Concentrate Produced
dmt
616,668
PRODUCTION
Concentrate Grade
% Ni
10.1
Contained Nickel
Tonnes
62,283
Total Operating Costs
AUD$
812,719,828
Total Capital Costs
AUD$
433,227,055
Pre Production Capex
AUD$
257,029,982
Max Negative Cashflow (Month 16)
AUD$
-269,209,468
Total Past Mine Gate Costs
AUD$
230,232,929
Total Net Revenue (Minus Past Mine Gate Costs)
AUD$
1,647,956,772
Total Cumulative Cashflow (Pre Tax)
AUD$
402,009,886
Discounted Cashflow (@ 8%) - NPV8
AUD$
197,378,393
%
22.9
Unit Operating Costs (C1)
AUD$/t milled
161.01
Unit Mining Operating Costs (Inc Power)
AUD$/t mined
97.16
Unit Milling Operating Costs (Inc Power)
AUD$/t milled
33.98
Unit All in Sustaining Costs
AUD$/t milled
195.92
FINANCIALS
(Con Transport, Offtake, Royalties)
Internal Rate of Return
UNIT COSTS
6
12
Annual Report 2024
WIN Metals Ltd
Review of Operations
PARAMETER
UNIT
PROJECT TOTAL
Unit All in Costs
AUD$/t milled
246.84
Unit Nickel Operating Production Cost
(Excluded Past Mine Gate Costs)
US$/lb in Con
3.67
AUD$/t in Con
12,432
Comparative C1 Nickel Production Cost
US$/lb Payable
5.39
Figure 4: Mt Edwards Nickel Project Conceptual Layout
7
WIN Metals Limited
13
WIN Metals Ltd
Review of Operations
Figure 5: Mt Edwards Nickel Concentrator Flowsheet Schematic
Planning for subsequent levels of feasibility was advanced with activity to be governed by prevailing commodity and
capital market sentiment which have unfortunately deteriorated markedly during the time of the study. Of note, the
decision by BHP to pause production from all Nickel West operations until a review in early 2027, announced on the 11th
of July 5 post the end of the financial year is seen as indicative of the current industry dynamics, demonstrating a need for
a change in approach to combat the structural changes implemented in competing markets, notably Indonesia.
4F
WIN is exploring opportunities to leverage off dormant infrastructure resulting from this BHP closure that may represent
a capital or operating saving to our proposed project.
Faraday-Trainline Lithium Project
The Faraday-Trainline Lithium Project area is located on Mining Lease M15/102, 4km west north-west of the
Widgiemooltha township. Access is via the Coolgardie-Norseman Rd, 63km south of Coolgardie. Faraday and Trainline
are central to Widgie’s Mt Edwards Project, covering a significant land holding within the “Lithium Corridor” between Mt
Marion lithium mine to the north and Pioneer Dome lithium deposit to the south.
Following discovery of rock chips 6 grading up to 3.70% Li2O in October 2022 the Company fast tracked its exploration
and development activities at the Faraday Lithium deposit. On 4 July 2023 WIN announced it had unearthed a new near
surface lithium prospect, named Trainline, directly to the north of the Faraday Lithium Deposit 7.
5F
6F
Drilling programs through the first half of the 2024 financial year returned high-grade lithium mineralisation at both
deposits. In addition, the Company also instigated confirmatory QAQC testwork which illustrated the assay method
utilised for a program of drilling that previously informed the Mineral Resource Estimate, as recommended by the assay
laboratory had underestimated the grade by on average 29%. WIN re-assayed a total of 2,801 samples using the
appropriate fusion assay method that resulted in an updated Mineral Resource Estimate for Faraday-Trainline with a
materially higher lithium grade 8.
7F
On 8 November 2023, the Faraday-Trainline lithium Mineral Resource Estimate (MRE) 9 was upgraded 375% to 1.96Mt
@ 0.69% Li2O (0.30% Li2O cut-off) including a high-grade, near surface zone of 373kt @ 1.00% Li2O (0.85% Li2O cutoff),
with a Measured and Indicated Mineral Resources total of 1.57Mt @ 0.71% Li2O. Further exploration activities
throughout the second half of the 2024 financial year successfully identified two additional prospects in Farson and
Gemini.
8F
5
BHP ASX Announcement 11 July 2024 - Western Australia Nickel to temporarily suspend operations
ASX Announcement 3 October 2022 – High Grade Lithium Discovery at Mt Edwards
ASX Announcement 4 July 2023 – New Lithium Discovery Positions Widgie for Resource Growth
8
ASX Announcement 27 September 2023 – Higher Grade Lithium to come on the cusp of being shovel ready at Faraday
9
ASX Announcement 8 November 2023 – 375% Growth in Faraday-Trainline Lithium Mineral Resource
6
7
14
8
Annual Report 2024
WIN Metals Ltd
Review of Operations
Figure 6: WIN Metals lithium deposits and surrounding lithium prospects
Faraday Metallurgical Testwork 10
9F
Metallurgical flotation test work was carried out on Faraday lithium samples10 with excellent results achieved. The
flowsheet development test work was carried out by ALS Metallurgy Pty Ltd located in Balcatta, Perth. A 1.01% Li2O
composite sample prepared from diamond drill core was used for flowsheet development testing and is considered
representative of the high-grade core of the Faraday mineralisation. This composite achieved an 81% lithium recovery
to produce a 6.3% Li2O concentrate. Two phases of metallurgical characterisation testing have now been undertaken
on the samples. The dominant lithium mineral identified by XRD analysis is spodumene . A flowsheet with a ball mill
grind, low intensity magnetic separation and desliming ahead of flotation has shown promise and supports further
optimisation and assessment using a range of variability samples.
Elevated grades of rubidium have been confirmed in the Faraday metallurgical samples with rubidium reporting to
potassium feldspar. Further work is required to understand the potential economic benefit of rubidium as a by-product
to the Li2O resource.
Faraday-Trainline Metallurgical testwork remains ongoing to confirm overall metallurgical recoveries across the entire
resource. Given the deterioration in the underlying commodity price, testwork outcomes have been modified to consider
potential by-product recoveries and to gain an understanding of the value that may accrue to these byproducts. Market
research currently being carried out will be taken into consideration in ongoing work.
10
ASX Announcement 2 August 2023 – Faraday Metallurgical Testwork-Excellent Flotation Response
WIN Metals Limited
9
15
WIN Metals Ltd
Review of Operations
Faraday Mining Proposal Approval
On 4 August 2023, WIN announced that the Department of Mines, Industry Regulation and Safety (DMIRS) conditionally
approved the commencement of mining operations in accordance with the plans submitted for the proposed mining
operation at the Company’s Faraday lithium deposit 11. The approval was given subject to two key conditions precedent
being met, being;
10F
1. Completing a flora survey within the disturbance envelope with the results being provided to DMIRS prior to the
commencement of any developmental or productive mining or construction activity; and
2. A clearance as prescribed under the Aboriginal Cultural Heritage Act 2021 over the proposed footprint is
obtained for the purposes of mining as opposed to exploration.
The Company has satisfied all the conditions necessary to begin mining over the proposed mining footprint area
following lodgement of the Botanical Survey and receipt of the final report on the Aboriginal Cultural Heritage Survey
carried out on M15/102 with neither survey noting any issues.
Corporate
Effective from 1 July 2024 Widgie Nickel Limited changed its name to WIN Metals Ltd following approval at the General
Meeting of Shareholders held the same day 12.
11F
As at 30 June 2024, WIN held $1.69m cash at bank.
Following extensive exploration and development activities across both the Nickel and Lithium Projects throughout the
reporting period, expenditure/activities have now slowed, in essence, to match minimum expenditure commitments on
WIN’s tenure.
On 16 April 2024, WIN announced its intention to launch a Rights Issue to raise up to $4 million 13. The Offer was for 1
fully paid ordinary share in the capital of the Company (Share) for every 2.9795 Shares held by eligible shareholders
registered at the record date, together with 1 free attaching unlisted option (New Option) for every 2 Shares subscribed
for and issued, exercisable at $0.07 each on or before 31 October 2025.
12F
The Company received applications under the Offer for 21,194,774 Shares at the issue price of $0.04 per Share (New
Shares) raising gross proceeds of $847,7913.
The Company also issued 10,597,504 New Options.
The Shortfall Offer is a separate offer made pursuant to the prospectus dated 18 April 2024 (Prospectus) and may
remain open for up to three months following the closing date of the Rights Issue (Shortfall Offer). The issue price for
each Share to be issued under the Shortfall Offer is at the same price at which New Shares have been offered under the
Offer. Successful applicants under the Shortfall Offer will also be entitled to New Options on the same terms as under
the Offer.
Subsequent to the end of the financial year under the Shortfall Offer, following receipt of shareholder approval on 1 July
2024