WIN Metals Ltd
Review of Operations
1
REVIEW OF OPERATIONS
The directors of WIN Metals Ltd (“Company” and “WIN”) present the Company’s financial report for the Company and its
controlled entities (“Consolidated Entity” and “Group”) for the year ended 30 June 2026.
All $ figures are in Australian Dollars throughout this report unless otherwise stated.
The Company had a number of milestone events during the year with a busy time on gold project acquisitions adding to its
portfolio and establishing WIN with a solid presence in WA’s goldfields region initially through the acquisition of the Radio
Gold Mine Project then subsequently the acquisitions of the Princess Royal Gold Mine and securing an option over the
Stumpy Project. The Company has moved at pace at Radio, in just ten months since acquisition, having completed two
successful drill programs and Mineral Resource updates and in August 2026 concluding technical and economic studies
of a re-start of the mine featuring the construction of an on-site processing facility.
At WIN’s Butchers Creek Gold Project a scoping study was completed providing the impetus to advance the Project ahead
of planned drilling at the Golden Crown deposit aimed to bring this resource into the next iteration of development studies
for the Project.
The strategic value of WIN’s nickel and lithium interests continues to be maintained with limited work programs on
evaluation of downstream nickel processing options and optimisation of lithium testwork including investigation of valuable
by-product extraction.
Key events of the year:
• August 2025 – Placement capital raising $2.35m: shares issues at 2 cents per share was strongly oversubscribed,
with funds directed towards accelerated drilling at Radio and evaluation work at Butchers Creek.
• September 2025 - Completion of Radio Gold Mine Acquisition: acquisition of the high-grade Radio Gold Mine,
securing a comprehensive asset package including infrastructure, equipment and surface ore stockpiles, with
minimal up-front consideration and a deferred royalty structure.
• November 2025 - Completed a transformational Scoping Study at the Butchers Creek Gold Project: confirming
a 9-year Life of Mine with forecast production of approximately 200koz of gold, underpinned by strong operating
margins, high-grade feed, and a simple, conventional processing flowsheet delivering robust project economics,
based on a gold price assumption of $5,385 per ounce.
• December 2025 – Placement capital raising $5.5m: shares issued at 3.5 cents per share, strengthening the
Company’s balance sheet and funding ongoing drilling at the Radio Gold Project, advancement of the Butchers
Creek Gold Project, and general working capital.
• March 2026 - The Company completed strategic high-grade transactions: to expand the emerging Radio hub,
acquiring the Princess Royal Gold Mine and securing an exclusive option over the Stumpy Doodle Gold Mine,
thereby increasing project scale and introducing potential satellite ore sources for development.
• June 2026 - Radio Gold Project Mineral Resource increased 21% to 49,600 ounces: 366,000 tonnes at 4.2 g/t
Au, JORC 2012. Resource has grown 73% since WIN acquired the Project in August 2025.
• June 2026 - WIN secured a six-month option over a modular gravity processing plant: a near new grinding
and gravity circuit well suited to underpin WIN's proposed ~120,000tpa Radio operation.
• August 2026 - Completed the Radio Gold Project Re-Start Study: the study outlines a low- capital pathway to
gold production by developing a standalone gold operation based on an initial integrated open-pit and underground
operation while establishing a platform for potential regional growth
WIN Metals Ltd
Review of Operations
2
Figure 1: WIN Metals Project Map
WIN Metals Ltd
Review of Operations
3
Radio Gold Project (WIN 100%) - Exploration and Evaluation Activities
The Radio Gold Project, located 8 km north of Bullfinch and approximately 38 km northwest of Southern Cross, is another
cornerstone asset within WIN’s portfolio. Over its mine life, Radio produced roughly 71,000 ounces of gold at an average
grade of 38 g/t Au. WIN’s 2026 global Mineral Resource Estimate for the Project totals 366,000t @ 4.22 g/t Au for 49,600
ounces of contained gold.
Table 1: Radio Gold Project Mineral Resource Summary by classification
Resource Classification Tonnes Au g/t Contained Gold (Oz)
Indicated 200,000 4.0 25,500
Inferred 166,000 4.5 24,100
Total 366,000 4.2 49,600
Note: Figures are rounded and reported at 0.5 g/t cut-off to 50 m below surface (open pit) and 1.0 g/t below 50 m of surface. Tonnes and grade have been
rounded to reflect the relative uncertainty of the estimates
Radio Gold Mine Acquisition and Strategy
WIN completed the acquisition in September 20251
. The transaction included a total cash payment of $500,000 plus GST
and share consideration of $400,000 plus GST via the issue of 20 million shares at $0.02 per share. A deferred consideration
arrangement also applies, comprising a stepped royalty of 5% of net smelter returns up to the first 18,000 ounces produced,
followed by a trailing 1.5% royalty thereafter.
The acquisition included:
• Modern underground decline access (330m of decline and 200m of ore development)
• Existing surface ore stockpiles
• Partially constructed 500 ktpa processing facility
• Operational offices, workshop, underground mining equipment and accommodation facilities
• Mining Lease M77/633, Prospecting Licence P77/4492, and Miscellaneous Licence L77/81
WIN rapidly advanced on-ground activities, with an initial 10m x 10m RC grade control and exploration drilling program to
delineate near-surface resources and extend the resource footprint both along strike and down dip of known mineralisation
resulting in an initial updated Mineral Resource Estimate (MRE). A second phase drill program was completed in March
2026 and fed into the latest updated MRE announced in June 2026. The results and MRE feed into the current economic
mining studies in progress. In parallel, the Company aims to capitalise on prior infrastructure investment by evaluating
options for a fit-for-purpose crushing, grinding, and gravity circuit, including potential leaching of gravity tails to maximise
gold recovery.
WIN also plans to systematically evaluate historic prospects across its broader tenure and surrounds. Whilst many of these
prospects are small, high-grade occurrences that maybe lack standalone development potential, the Company sees
significant opportunity to consolidate and unlock value by advancing these assets through targeted exploration and
portfolio development. To this end WIN acquired the Princess Royal Gold Mine in May 2026 and has an option to acquire
the high-grade Stumpy Doodle Project.
Two Resource Updates at Radio
An initial MRE update in January 2026 followed completion of WIN’s maiden drill program for the Project. Following the
success of WIN’s second drill program the Resource was re-estimated to 49,600 ounces at 4.2 g/t Au2
, following 4,200m of
drilling completed in February 2026, representing 73% resource growth since WIN acquired the Project in August 2025.
Importantly, 25,500 ounces, or over half of the updated Resource, is now classified as Indicated, reflecting improved
confidence in geological continuity and data quality. Indicated tonnage at Repeater increased by 38% to 66,000 tonnes at
3.4 g/t Au for 7,200 ounces, further de-risking the front end of the mine plan for both Radio and Repeater.
1
ASX:WIN “WIN Completes Acquisition of Radio Gold Mine” Released 24 September 2025
2
ASX:WIN “WIN Increases Radio Gold Resource – 49,600 Ounces @ 4.2g/t” Released 2 June 2026
WIN Metals Ltd
Review of Operations
4
Table 2: Radio Gold Project Mineral Resource Summary by classification
Resource Classification Tonnes
Au
g/t
Contained Gold (Oz)
Indicated 200,000 4.0 25,500
Inferred 166,000 4.5 24,100
Total 366,000 4.2 49,600
Note: Figures are rounded and reported at 0.5 g/t cut-off to 50 m below surface (open pit) and 1.0 g/t below 50 m of surface. Tonnes and grade have been
rounded to reflect the relative uncertainty of the estimates
Figure 2: Comparison of January 2026 and June 2026 MRE’s
Figure 3: Radio Gold Project prospect location and drill traces (black traces 2026 drilling)
WIN Metals Ltd
Review of Operations
5
Drilling demonstrates exploration and development upside potential3
WIN’s drill programs were designed to support mine planning at Radio and Repeater, and results confirmed high-grade gold
mineralisation within the proposed underground and open pit mining areas, increasing confidence in the current mine plan,
while also identifying additional zones outside the current mine design warranting assessment.
Significant intersections included 1m at 23.40 g/t Au and 3m at 6.66 g/t Au within the proposed underground mining areas
at Radio, and 3m at 19.51 g/t Au along the northern margin of the proposed Repeater open pit. Drilling also identified
mineralisation outside the current mine design, with 2m at 16.01 g/t Au and 1m at 11.09 g/t Au, representing potential
upside to be assessed in future mine planning.
Underground sampling from recently developed workings on the 1315 level at Radio, accessed via the existing decline,
returned exceptionally high grades of up to 334 g/t Au and 314 g/t Au from laminated quartz veins, with the high-grade
samples taken from the current ore drive development face. A total of 46 underground samples were collected, providing a
robust dataset that confirms the nuggety nature of the mineralisation, with these results located outside the current
resource envelope and mine design.
Figure 4: Radio significant drill results against proposed mine design looking west (left) and radio mine design looking west
(right)
Figure 5: Repeater drill results (left, looking west), (right) open pit mine design) and plan view.
3
ASX:WIN “Radio Delivers Bonanza Gold Grades” Released 4 May 2026
WIN Metals Ltd
Review of Operations
6
Photo 1: 1315 East lode north ore drive face sample
A key piece of the Radio Gold Project Development Jigsaw Secured
WIN has been evaluating processing options for Radio, comparing the relative merits of ore tolling and ore purchase
agreements against building a fit-for-purpose gravity or gravity-plus-leach plant onsite. Ore tolling and ore purchase
arrangements have been assessed and based on current market conditions and discussions to date, are considered less
attractive than onsite processing alternatives.
In evaluating various onsite options WIN has secured a six-month option to acquire a modular gravity processing plant
(MGP)4
. This represents a significant step in advancing WIN's proposed onsite processing strategy for Radio. The MGP
comprises the key grinding and gravity recovery infrastructure required to underpin a proposed 120,000tpa gold processing
facility and complete the front-end gold recovery circuit at Radio, including a ROM bin, conveyors, scrubber trommel,
245kW ball mill, screen, spiral, jig and lamella thickener modules. Importantly this equipment will be able to be retrofitted
into the existing concrete footprint resulting in significant capital savings reinforcing the case for onsite processing.
The MGP plant was constructed in 2014 to liberate a tantalite concentrate from pegmatite ore, ran for approximately one
month before being decommissioned, and sat idle until it was acquired by Tungsten Mining in 2017. WIN's inspection found
the plant in excellent condition. The ball mill size and plant design capacity are an ideal fit for WIN's intended production
rate of 120,000tpa, or 15tph at the grind size required for maximum gold recovery.
4
ASX:WIN “WIN Secures Key Processing Infrastructure for Radio Gold” Released 18 June 2026
WIN Metals Ltd
Review of Operations
7
WIN paid an option fee of $50,000 to secure the rights to acquire the complete plant within six months. Conversion of the
option requires a further payment of $250,000 in cash and the issue of $250,000 in WIN shares priced at the 5-day VWAP at
the time of conversion. Mining Engineering Services Australia Pty Ltd (MESA) has been engaged to advance engineering,
cost estimation and development planning for the proposed processing facility and permitting activities have commenced
to recommission the existing tailings dam and process plant site.
Securing the option allows WIN to finalise costings and integrate the plant into the Company's financial model for the
Project, explore financing options, and progress the necessary permits for the proposed mining operation.
Photo 2: Modular Gravity Plant Installed and operational (as previously operated)
Early Works Priming for Rapid Radio Re-start
While the Radio Gold Mine is in a state of care and maintenance, it is being prepped for a return to operations. The explosive
magazines have been moved to a newly constructed approved compliant location (Photo 3), pumping commenced of the
historical workings through the shaft ahead of mine development, a new Class C waste disposal area established,
rehabilitation and cleaning up of previously disturbed areas being undertaken, and the pre-existing borefield inspected for
re-equipping. Accommodation units ex Mt Edwards Project relocated to the Radio Mine are currently being refurbished
(Photo 5) and importantly an application to establish an additional 36 room mine camp at the Company's Bullfinch tavern
has been lodged and approved with the Yilgarn Shire. The camp facility will be established with the existing owned units and
those acquired as part of the Radio asset purchase - the first step in restarting the mine, to be commenced during the
forthcoming quarter.
Photo 3 and 4: New magazine fencing and earthing and WIN dongas undergoing refurbishment
WIN Metals Ltd
Review of Operations
8
Photo 5 and 6: Dewatering pump being lowered into the shaft and Bore field investigations
The Bullfinch tavern has seen refurbishment works undertaken comprising replacement of evaporative air-conditioners,
replacement of septic system and preparation of the site at the rear of the facility for the new camp. A structural assessment
of the building and some remedial brickwork repairs have been completed.
Photo 7: Rear of tavern, location of new camp install to incorporate all 10 donga blocks
Various consultants have been engaged to assist with the mine restart including:
Consultant Activity
Entech Open Pit and Underground Geotech
Cube Consulting Open Pit Optimisation
MBS Environmental Permitting, Waste Rock Characterisation, Soil and
Landform Assessments, Tailings Geochemical
Characterisation
MESA Process Plant Design and Costing
GeoAnalytica Tailings Design
MWES Surface Hydrology and Bore field assessment
Zone 50 Road Realignment Survey and Design
Structerre Soil geotechnical assessment
WIN Metals Ltd
Review of Operations
9
Freo Metallurgy Metallurgical Testwork
METS Ventilation Modelling
Elite Drafting Camp Submission
Fosten Industries Camp construction
Koalaty Mechanical Equipment assessment
Underground and open pit designs, production schedule and a supporting first principles cost model are all advancing to
inform the development decision. Permitting activities required under updated legislative frameworks remain well
advanced for the proposed mining operations, with baseline studies and data collection progressing in parallel to support
the proposed processing and tailings strategy. Various quotes have been received for both open pit and underground
mining, tailings dam construction and process plant construction.
Radio Gold Project Re-Start – August 2026
Shortly after the end of the financial year WIN completed and announced the results of the Radio Gold Project Re-start
Study5
(Study). The Study outlines a low- capital pathway to gold production by developing a standalone gold operation
based on an initial integrated open-pit and underground operation while establishing a platform for potential regional
growth.
The key Study outcomes:
Key outcome Description
Integrated development concept Initial open-pit and underground operation feeding a dedicated 120ktpa CIL processing plant.
Initial production target
215kt at 3.16g/t Au for approximately 20.2koz of recovered gold over a 29-month processing
schedule.
Infrastructure advantage
Leverages existing mine development, workshops, power infrastructure, processing civils, bore
fields, tailings infrastructure and accommodation assets, materially reducing new-build scope.
Peak funding requirement
Approximately A$19 million on a pre-finance basis, rounded from the modelled maximum
cumulative cash deficit of approximately A$18.9 million.
Base-case economics
A$23 million of undiscounted pre-tax project cash flow, A$18 million pre-tax NPV8, 84% pre-tax
project IRR and 11-month payback from first gold at A$6,000/oz.
Production profile Peak annual recovered gold production of approximately 9.5koz in Year 2.
Metallurgical assumptions Plant recoveries of 95.0 % Au for Radio material and 90% Au for Princess Royal tailings.
Positive downside sensitivity
At A$5,100/oz, the Study forecasts positive pre-tax project cash flow, approximately A$3 million
pre-tax NPV8, 21% pre-tax IRR and 19-month payback.
Development pathway
Subject to outstanding approvals, financing and FID, WIN is targeting commencement of
development activities in early 2027.
Included in the Study base case
Radio underground mine
Repeater open pit
Existing Radio surface stockpiles
Princess Royal tailings Indicated Mineral
Resource
Not included in the Study economics
Extensions to Radio and Repeater
Princess Royal hard-rock mineralisation
Other WIN-owned regional deposits
Third-party feed, toll treatment or joint ventures
5
ASX:WIN “Radio Gold Project Re-Start Study” Released 24 August 2026
WIN Metals Ltd
Review of Operations
10
The Study is a preliminary technical and economic assessment of a potential restart of the Radio Gold Project. No Ore Reserve
has been estimated or declared, and the Study does not constitute a decision to mine. Further detailed engineering, regulatory
approvals, financing and a final investment decision are required before development could proceed.
The Study has an overall estimated accuracy of approximately ±20. Actual capital costs, operating costs, production outcomes
and financial results may differ materially from the Study estimates.
Adding to the Radio Hub - Princess Royal Gold Project (WIN 100%) and Stumpy Doodle
Gold Project Acquisition Option
In March 2026 WIN Metals executed two value-accretive gold transactions that materially enhanced the scale and
optionality of the broader Radio Gold Project. The Company acquired the fully permitted Princess Royal Gold Mine, located
approximately 80 km from Radio or some 5kms to the west of Westonia, and secured an exclusive 12‑month option over
the high-grade Stumpy Doodle Gold Mine, situated 10 km north of Radio, with both assets positioned on granted Mining
Leases to support a streamlined development pathway.
Figure 6: Location of Radio, Princess Royal and Stumpy Doodle Projects
Princess Royal brings an Exploration Target of 26,000–40,000 tonnes at 8.0–12.0 g/t Au for 7,000–15,000 ounces6
and is
supported by exceptional historic grades, including diamond intercepts such as 2 m at 31.47 g/t Au and 2 m at 30.47 g/t Au,
while Stumpy Doodle adds a highly prospective satellite position with historical production of ~2,300 tonnes at 11 g/t Au for
~830 ounces. Immediate work programs are being advanced, with drill planning underway at Princess Royal and exploration
scheduled to commence at Stumpy Doodle during the option period, collectively increasing the Project’s potential high-
margin ore sources and strengthening development flexibility for future processing and production scenarios.
Cautionary Statement – Princess Royal Exploration Target
An Exploration Target is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting
where the statement or estimate, quoted as a range of tonnes and a range of grade or quality. The potential quantity and grade
of the Princess Royal Exploration Target is conceptual in nature and, as such, there has been insufficient exploration drilling
conducted to estimate a Mineral Resource. At this stage it is uncertain if further exploration drilling will result in the estimation
of a Mineral Resource. The Exploration Target has been prepared in accordance with the JORC Code 2012.
6
ASX:WIN “WIN Builds Scale at Radio Gold with High Grade Acquisitions” Released 31 March 2026
WIN Metals Ltd
Review of Operations
11
Princess Royal Acquisition Terms
• Total cash payments of $500,000 (exclusive of GST).
• A royalty of $75 (exclusive of GST), payable to the vendor, per ounce of gold in respect of all refined bullion
that is the end product resulting from the gold bearing ore extracted and recovered from the Tenements
(M77/0718, P77/4702 and P77/4703).
• Assumption of another existing tiered royalty arrangement:
o 0-5000 ounces - $nil
o 5001- 13,800 ounces - $25 per ounce
o 13,801 – 15,000 ounces - $25 per ounce initially by offset against a $30,000 prior advance
payment
Stumpy Doodle Option Terms
• Non-refundable option fee of $20,000 (exclusive of GST) for an exclusive 12-month option to acquire
(Option Period) the tenement ending 23 February 2027.
• During the Option Period WIN is to conduct exploration activities on the tenement, including drilling costs
to an invoiced value of no less than $50,000.
• If at WIN’s election it exercises the option to acquire the tenement WIN will issue to the vendor fully paid
ordinary shares in WIN (Shares) calculated as the greater of:
o The number of Shares valued to $80,000 issued at the market price based upon a 15 day volume
weighted average price of Shares calculated over the 15 ASX trading days on which trades in
shares are recorded before (but not including) the satisfaction of conditions precedent for
completion of the acquisition; or
o 1,500,000 Shares.
Butchers Creek Gold Project (WIN 100%) - Exploration and Evaluation Activities
The Butchers Creek Gold Project (Butchers Creek or the Project) is located 30km south-east of Halls Creek in the
Kimberley region of Western Australia. Butchers Creek is a historic gold production centre hosting a global mineral resource
of 5.63Mt at 1.98g/t Au for 359,000oz7
of gold and a series of advanced gold drill targets. Previous production from the
Butchers Creek gold mine resulted in 52,000oz of gold produced between 1995 and 1997.
Table 3: Butchers Creek Global Mineral Resource Summary
Deposit Last Update Resource Classification Tonnes (Mt) Au g/t Contained Gold (Oz)
Butchers Creek Apr-25
Indicated 3.58 2.24 258,000
Inferred 1.65 1.18 63,000
Golden Crown Jun-21 Inferred 0.40 3.10 38,000
Total Indicated + Inferred 5.63 1.98 359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t Au cut-off below 150m of surface.
Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
7
ASX:WIN “WIN advances Butchers Creek towards development following resource update” Released 16 April 2025
WIN Metals Ltd
Review of Operations
12
Figure 7: Location of Butchers Creek Gold Project
Butchers Creek Gold Project Scoping Study – November 2025
WIN completed a Scoping Study for the Butchers Creek Gold Project8
, confirming the technical and financial viability of
developing a standalone open pit and underground gold operation with an on-site processing facility.
Key outcomes of the Scoping Study include (based on a gold price assumption of $5,385 per ounce):
• Life of Mine: 9 years
• Ore processed: 3.29Mt @ 2.0g/t Au
• Recovered gold: ~200koz
• Average production: ~33kozpa during steady state operations
• Peak production: ~37koz in Year 5
8
ASX:WIN “Butchers Creek Gold Project Delivers Robust Scoping Study” Released 12 November 2025
WIN Metals Ltd
Review of Operations
13
• Pre-production capital: $142 million
• Free cash flow: $288 million (pre-tax)
• NPV (8%): $143 million (pre-tax)
• IRR: 25% (pre-tax)
• AISC: $3,032/oz
• Payback period: Approximately 3.5 years from commencement of production
The Study was based on the existing Butchers Creek Mineral Resource only demonstrating the potential to develop a
conventional gold operation comprising open pit and underground mining supported by a 600ktpa CIL processing plant and
associated infrastructure, a simple processing flowsheet. With an initial open pit strip ratio of approximately 11.8 and a
highly mechanised underground bulk mining operation possible the robust financial outcomes reflect strong operating
margins derived from high-grade feed, with the Project generating meaningful free cash flow over the Life of Mine at a gold
price assumption of $5,385 per ounce.
The Scoping Study also confirms that the Project benefits from low technical complexity, with no requirement for novel
processing methods, and highlights opportunities to further enhance value through optimisation of mine scheduling,
potential incorporation of the nearby Golden Crown deposit, and additional resource growth from continued exploration in
a region ripe for consolidation. These opportunities will be assessed as the Project progresses to the next level of technical
evaluation.
The Company has commenced preliminary work streams to advance permitting pathways, upgrade tenure to allow mining,
stakeholder engagement and further technical studies aimed at improving confidence levels and refining development
options.
The Scoping Study is a preliminary technical and economic assessment completed to a scoping level of accuracy of
approximately ±40% and does not support the estimation of Ore Reserves. The production target is based on a combination
of Indicated (approximately 96%) and Inferred (approximately 4%) Mineral Resources. While the inclusion of Inferred
Mineral Resources is not material to the financial viability of the Project, there is no certainty that further exploration will
result in the conversion of Inferred Resources to Indicated or Measured categories.
Figure 8: Butchers Creek open pit cut back design
WIN Metals Ltd
Review of Operations
14
Figure 9: Butchers Creek underground mine design
Figure 10: Site Layout
WIN Metals Ltd
Review of Operations
15
Activities at Butchers Creek are now focused on ongoing stakeholder negotiations. Key tenement applications at Butchers
Creek and Golden Crown are being progressed, targeting the conversion of existing exploration licences to mining leases to
facilitate potential future mining activities at the Project. Drilling is planned for the Golden Crown deposit to improve
resource confidence so that the deposit can be assessed for future mining studies at the Project.
In addition, infield exploration work has identified a series of high priority exploration targets at Ruby Queen, Ganymede and
Emjay.
Mt Edwards Nickel Project (WIN 100%) - Exploration and Evaluation activities
WIN controls a dominant ~240km2
land package over the prolific nickel-producing Widgiemooltha Dome in Western
Australia. The Mt Edwards Nickel Project is positioned adjacent to key infrastructure, located just 80km south of the major
regional centre of Kalgoorlie, 30km south-west of Kambalda.
At 30 June 2026 Mt Edwards Nickel Project was comprised of 11 separate deposits with a total MRE of 12.66Mt grading
1.43% nickel for 180,900 tonnes9
.
With the ongoing subdued nickel price attributed to rapid growth in nickel output in Indonesia limited work programs were
undertaken at Mt Edwards during the year with the focus being on maintaining this highly strategic asset. Exploration for
groundwater was completed during January 2026 over the Mt Morgans aquifer, with aircore drilling successfully intersecting
thick water bearing sand units considered prospective for production bores to support future processing requirements at
Mt Edwards. Securing a reliable, high-quality water supply is a key enabling milestone for any potential development and
processing operation at the Project.
Key miscellaneous licence applications were made to facilitate connection to mains power.
WIN has carried out modelling to consider the merits of downstream processing of nickel concentrates from Mt Edwards to
produce nickel sulphate/pCAM as an alternative to simply selling a low value concentrate into world markets incurring
significant transport costs, penalties for deleterious elements and low payabilities. This study work remains ongoing as at
year end.
9
ASX:WIN “Sale of non-core assets yield $1.4M for WIN to advance gold Assets” Released 1 July 2025
WIN Metals Ltd
Review of Operations
16
Figure 11: Mt Edwards nickel and lithium resources at 30 June 2026
Faraday-Trainline Lithium Project (WIN 100%) - Exploration and Evaluation activities
The Faraday-Trainline Lithium Project is located in the “lithium corridor” between Mt Marion to the north and Pioneer Dome
to the south in Widgiemooltha, Western Australia. The project hosts the Faraday-Trainline Lithium Deposit as well as four
prospects Farson, Atomic 3, Voyager and Gemini. The Faraday-Trainline lithium Mineral Resource Estimate (MRE) amounts
to 1.96Mt @ 0.69% Li2O10
including a high-grade, near surface zone of 373kt @ 1.00% Li2O with a Measured and Indicated
Mineral Resources total of 1.57Mt @ 0.71% Li2O.
Metallurgical test work focused on critical mineral liberation via flotation are ongoing, targeting rubidium deportment within
the lithium-bearing pegmatites, with work centred on evaluating alternative process flowsheets, detailed mineralogical
mapping and research on alternative downstream refining options to support future development options for the Project.
10
ASX:WIN “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
WIN Metals Ltd
Review of Operations
17
No exploration activities