JUNE 2026 QUARTERLY REPORT
HIGHLIGHTS
• Radio Gold Project Mineral Resource increased 21% to 49,600 ounces1
(366,000 tonnes at 4.2 g/t Au,
JORC 2012). Resource has grown 73% since WIN acquired the Project in August 2025.
• Radio Indicated ounces increased 21% to 25,500. Repeater's Indicated tonnage rose 38% to 66,000
tonnes at 3.4 g/t Au for 7,200 ounces, sharpening the picture in the near-term mining areas.
• Underground sampling and drilling at Radio returned bonanza grades, including 0.4m at 334 g/t Au
and 0.3m at 314 g/t Au2
, both within and outside the current mine plan. "Drill for structure, develop
for grade" is holding up.
• WIN secured a six-month option over a modular gravity processing plant3
from Tungsten Mining NL
(ASX: TGN), a near as new grinding and gravity circuit well suited to WIN's proposed ~120,000tpa
Radio operation.
• Princess Royal Gold Mine acquisition completed4
. Follow-up sampling turned up more upside at Hill
End (5.59 g/t Au) and Battler West (4.61 g/t Au).
• Mine design, processing and permitting all moved forward this Quarter, keeping WIN on track for a
development decision this financial year, subject to studies, financing and approvals.
View our hub and signup to receive updates from our InvestorHub: https://investors.winmetals.com.au/
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to present its Quarterly Activities Report for the
period ended 30 June 2026.
1
ASX:WIN “WIN Increases Radio Gold Resource – 49,600 Ounces @ 4.2g/t” Released 2 June 2026
2
ASX:WIN “Radio Delivers Bonanza Gold Grades” Released 4 May 2026
3
ASX:WIN “WIN Secures Key Processing Infrastructure for Radio Gold” Released 18 June 2026
4
ASX:WIN “High-Grade Princess Royal Results Confirm Acquisition Upside” Released 26 May 2026
2
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
"The June Quarter marks another important step in our strategy to bring Radio into production.
In less than a year since acquiring the Project, WIN has delivered a transformational uplift in the Mineral
Resource, now standing at 49,600 ounces at 4.2 g/t gold, with half of the Resource classified as Indicated. Our
underground sampling program returned grades in excess of 300 g/t Au, confirming the high-grade nature of
this asset and highlighting further upside beyond the current mine design.
Securing an option over the modular gravity plant is a practical, capital-disciplined step towards production,
giving us a fit-for-purpose processing solution at a fraction of replacement cost. Together with the completion
of the Princess Royal acquisition and encouraging reconnaissance results at Hill End and Battler West, we
now have line of sight to a larger, high-grade production hub at Radio.
With mining studies, permitting and processing options well advanced, WIN remains firmly positioned to
progress towards a development decision, with a clear objective of transforming the Company into a cash-
generating gold producer."
RADIO GOLD PROJECT (100% WIN)
Southern Cross Region, Western Australia
Mineral Resource Estimate Update
The Radio Gold Project Mineral Resource increased by 21% this Quarter to 49,600 ounces at 4.2 g/t Au,
following 4,200m of drilling completed in February 2026, representing 73% resource growth since WIN
acquired the Project in August 2025.
Importantly, 25,500 ounces, or half of the updated Resource, is now classified as Indicated, reflecting
improved confidence in geological continuity and data quality. Indicated tonnage at Repeater increased by
38% to 66,000 tonnes at 3.4 g/t Au for 7,200 ounces, further de-risking the front end of the mine plan for both
Radio and Repeater.
Table 1: Radio Gold Project Mineral Resource Summary by classification
Resource Classification Tonnes
Au
g/t
Contained Gold (Oz)
Indicated 200,000 4.0 25,500
Inferred 166,000 4.5 24,100
Total 366,000 4.2 49,600
Note: Figures are rounded and reported at 0.5 g/t cut-off to 50 m below surface (open pit) and 1.0 g/t below 50 m of surface. Tonnes
and grade have been rounded to reflect the relative uncertainty of the estimates
3
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 1: Comparison of January 2026 and June 2026 MRE’s
Figure 2: Radio Grade Tonnage Curve
4
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 3: Radio Gold Project prospect location and drill traces (black traces 2026 drilling)
Drilling and Underground Sampling Results
WIN reported assay results from its 2026 drilling and underground sampling programs during the Quarter. The
programs were designed to support mine planning at Radio and Repeater, and results confirmed high-grade
gold mineralisation within the proposed underground and open pit mining areas, increasing confidence in the
current mine plan, while also identifying additional zones outside the current mine design.
Significant intersections included 1m at 23.40 g/t Au and 3m at 6.66 g/t Au within the proposed underground
mining areas at Radio, and 3m at 19.51 g/t Au along the northern margin of the proposed Repeater open pit.
Drilling also identifiedmineralisationoutside the current mine design, with2m at 16.01 g/t Au and1m at 11.09
g/t Au, representing potential upside to be assessed in future mine planning.
Underground sampling from recently developed workings on the 1315 level at Radio, accessed via the existing
decline, returned exceptionally high grades of up to 334 g/t Au and 314 g/t Au from laminated quartz veins,
with the high-grade samples taken from the current ore drive development face. A total of 46 underground
samples were collected, providing a robust dataset that confirms the nuggety nature of the mineralisation,
with these results located outside the current resource envelope and mine design.
5
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 4: Radio significant drill results against proposed mine design looking west (left) and radio mine design looking
west (right)
Figure 5: Repeater drill results (left, looking west), (right) open pit mine design) and plan view.
6
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Photo 1: 1315 East lode north ore drive face sample – outside the current mining plan
Processing: Modular Gravity Plant Option
WIN secured a six-month option to acquire a modular gravity processing plant (MGP) from Tungsten Mining
NL (ASX: TGN). This represents a significant step in advancing the Company's proposed onsite processing
strategy for Radio. The MGP comprises the key grinding and gravity recovery infrastructure required to
underpin a proposed 120,000tpa gold processing facility and complete the front-end gold recovery circuit at
Radio, including a ROM bin, conveyors, scrubber trommel, 245kW ball mill, screen, spiral, jig and lamella
thickener modules.
7
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Photo 2: Ball Mill and associated plant
The plant was constructed in 2014 to liberate a tantalite concentrate from pegmatite ore, ran for
approximately one monthbefore being decommissioned, and satidle untilitwas acquired by Tungsten Mining
in 2017. WIN's inspection found the plant in excellent condition. The ball mill size and plant design capacity
are an ideal fit for WIN's intended production rate of 120,000tpa, or 15tph at the grind size required for
maximum gold recovery. Previous metallurgical test work at Radio demonstrated gravity gold recoveries of up
to 87%.
WIN paid an option fee of $50,000 to secure the rights to acquire the complete plant within six months.
Conversion of the option requires a further payment of $250,000 in cash and the issue of $250,000 in WIN
shares priced at the 5-day VWAP at the time of conversion. Mining Engineering Services Australia Pty Ltd
(MESA) has been engaged to advance engineering, cost estimation and development planning for the
proposed processing facility and permitting activities have commenced to recommission the existing tailings
dam and process plant site.
The Company has been evaluating processing options for Radio, comparing the relative merits of ore tolling
and ore purchase agreements against building a fit-for-purpose gravity or gravity-plus-leach plant onsite. Ore
tolling and ore purchase arrangements have been assessed and based on current market conditions and
discussions to date, are considered less attractive than onsite processing alternatives.
Securing the option allowsWIN to finalise costings and integrate the plant into the Company's financial model
for the Project, explore financing options, and progress the necessary permits for the proposed mining
operation.
During the Quarter, WIN commenced preliminary scoping work with its advisers to evaluate potential
financing structures for the proposed restart of the Radio Gold Project. This work will continue during the
September 2026 Quarter; no financing arrangement has been agreed or secured, and any development
8
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
decision remains subject to completion of the relevant studies, receipt of required approvals and securing
funding on terms acceptable to WIN.
Photo 3: Modular Gravity Plant Installed and operational (as previously operated)
Site Works
While the Radio Gold Mine is in a state of care and maintenance, it is being prepped for a return to operations.
The explosive magazines have been moved to a newly constructed approved compliant location (Photo 4),
pumping commenced of the historical workings through the shaft ahead of mine development, a new Class
C waste disposal area established, rehabilitation and cleaning up of previously disturbed areas being
undertaken, and the pre-existing borefield inspected for re-equipping. Accommodation units ex Mt Edwards
Project relocated to the Radio Mine are currently being refurbished (Photo 5) and importantly an application
to establish an additional 36 room mine camp at the Company's Bullfinch tavern has been lodged with the
Yilgarn Shire. The camp facility will be established with the existing owned units and those acquired with the
Radio asset purchase - the first step in restarting the mine, to be commenced during the forthcoming quarter.
Photo 4 and 5: New magazine fencing and earthing and Widgie dongas undergoing refurbishment
9
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Photo 6 and 7: Dewatering pump being lowered into the shaft and Bore field investigations
The Bullfinch tavern has seen refurbishment works undertaken comprising replacement of evaporative air-
conditioners, replacement of septic system and preparation of the site at the rear of the facility for the new
camp. A structural assessment of the building and some remedial brickwork repairs have been completed.
Photo 8: Rear of tavern, location of new camp install to incorporate all 10 donga blocks
Various consultants have been engaged to assist with the mine restart including:
Consultant Activity
Entech Open Pit and Underground Geotech
Cube Consulting Open Pit Optimisation
MBS Environmental Permitting, Waste Rock Characterisation, Soil and
Landform Assessments, Tailings Geochemical
Characterisation
MESA Process Plant Design and Costing
GeoAnalytica Tailings Design
10
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
MWES Surface Hydrology and Bore field assessment
Zone 50 Road Realignment Survey and Design
Structerre Soil geotechnical assessment
Freo Metallurgy Metallurgical Testwork
METS Ventilation Modelling
Elite Drafting Camp Submission
Fosten Industries Camp construction
Koalaty Mechanical Equipment assessment
Mine Design and Permitting
Underground and open pit designs, production schedule and a supporting first principles cost model all
progressed during the Quarter to inform the development decision. Permitting activities required under
updated legislative frameworks remain well advanced for the proposed mining operations, with baseline
studies and data collection progressing in parallel to support the proposed processing and tailings strategy.
Various indicative quotes have been received for both open pit and underground mining, tailings dam
construction and process plant construction.
PRINCESS ROYAL GOLD MINE (100% WIN)
Southern Cross Region, Western Australia
WIN completed the acquisition of the fully permitted Princess Royal Gold Mine and surrounding tenure during
the Quarter, located approximately 80 km south-west of the Radio Gold Project. The acquisition adds a high-
grade historical gold operation with near-term drilling and development potential, with historic production of
approximately 13,900 ounces at 21 g/t Au and an Exploration Target (JORC 2012) of 26,000–40,000 tonnes at
8.0–12.0 g/t Au for 7,000–15,000 ounces5
.
Cautionary Statement – Princess Royal Exploration Target
An Exploration Target is a statement or estimate of the exploration potential of a mineral deposit in a defined geological
setting where the statement or estimate, quoted as a range of tonnes and a range of grade or quality. The potential
quantity and grade of the Princess Royal Exploration Target is conceptual in nature and, as such, there has been
insufficient exploration drilling conducted to estimate a Mineral Resource. At this stage it is uncertain if further
exploration drilling will result in the estimation of a Mineral Resource. The Exploration Target has been prepared in
accordance with the JORC Code 2012.
Preliminary mine design, scheduling and costing work has concluded on Princess Royal to guide economic
assessment and assist with drill targeting work. Revision of this will be undertaken upon drilling allowing this
resource to be considered in economic modelling.
Mineralised tails at both Princess Royal and Battler are being incorporated as part of the economic
assessment of Radio.
5
ASX:WIN “WIN Builds Scale at Radio Gold with High Grade Acquisitions” Released 31 March 2026
11
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 6: Location of Radio, Princess Royal and Stumpy Doodle Projects
Satellite Prospects Reconnaissance Results
Following completion of the acquisition, WIN carried out mapping and sampling across the wider tenement
package, focused on the western tenure where multiple historic workings are located.
At the Hill End Prospect, located approximately 2 km west of the Princess Royal Gold Mine, twelve historical
shafts of varying depths have been identified. Selective rock chip sampling, predominantly of quartz material
from shaft spoil, returned high-grade results of up to 5.59 g/t Au. Evidence of historical drilling was also
observed, with drill collars identified in the field, and a review of historical reports is underway to compile and
validate the relevant drilling data.
At the Battler West Prospect, a substantial two-compartment, timber-lined shaft was located north of Hill
End, indicative of historical underground mining activity. A rock chip sample collected from material
associated with the shaft returned 4.61 g/t Au. The shaft does not appear to have been tested by modern
drilling, and no corresponding MINDEX record has been identified, highlighting a gap in historical data
coverage.
At Great Battler, multiple historical shafts and the remains of a stamp battery were mapped, with battery
sands sampled to a depth of approximately 0.3 m across their extent. Sampling returned an average grade of
0.89 g/t Au, with individual results ranging from 0.39 g/t Au to 1.62 g/t Au. These initial results support the
potential for economic mineralisation, however further work is required to define grade distribution and
understand metallurgical characteristics, and a systematic, gridded sampling program is planned.
Drill planning is underway at Princess Royal, with a Programme of Work approved, and exploration targeting
of the satellite prospects is progressing to support future drill planning across the broader Radio project area.
12
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 7: Sampling results for West Battler, Hill End and Great Battler battery sands (Au ppm)
BUTCHERS CREEK GOLD PROJECT (100% WIN)
Kimberley Region, Western Australia
No field activities were undertaken during the Quarter, with efforts focused on ongoing stakeholder
negotiations. Key tenement applications at Butchers Creek and Golden Crown progressed, targeting the
conversion of existing exploration licences to mining leases to facilitate potential future mining activities at
the Project. Drilling is planned during the 2026 field season at Golden Crown to improve resource confidence
so that the deposit can be assessed for future mining studies at the Project.
Ongoing dialogue with the Kimberly Land Council representing the Koongie Elvire traditional owners has seen
a meeting be proposed for the forthcoming quarter to discuss the project highlighting the requirements to
make it a success with accrued benefits to all stakeholders. This meeting is welcomed by WIN.
MT EDWARDS NICKEL PROJECT (100% WIN)
Southern Goldfields, Western Australia
No work on nickel at Mt Edwards was undertaken during the Quarter.
FARADAY-TRAINLINE LITHIUM PROJECT (100% WIN)
Southern Goldfields, Western Australia
Metallurgical test work remains ongoing on Faraday/Trainline with a view to establishing a clear pathway to
liberate both Lithium and the rubidium byproduct.
Test work involving various flotation flowsheets have been evaluated to maximise recovery of the elements of
interest and depress diluents using various reagent regimes.
13
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
As at the end of the Quarter work has reached a point where preliminary downstream leaching of flotation
concentrates has liberated elemental Rubidium. Work remains incomplete but is expected to reach a stage
of being able to be reported more fully during the forthcoming quarter.
CORPORATE
As at 30 June 2026, WIN Metals reported a cash balance of $1.992 million. Detailed information regarding the
Company’s cash flows and movements for the Quarter is available in the accompanying Appendix 5B.
The Company has arranged deferral of the $1m May 2026 deferred Butchers Creek Gold Project acquisition
payment to Meteoric Resources NL until November 2026.
Table 2: Corporate information as at 30 June 2026
ASX code WIN Board of Directors & Management
Quoted Ordinary shares on issue: 857,377,350 Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue: - Andrew Parker – Independent Non-Executive Chairman
Listed Options (WINO) $0.07 78,714,253 Felicity Repacholi - Independent Non-Executive Director
Unlisted Options ($0.036 to $0.35): 139,742,849 Scott Perry - Independent Non-Executive Director
Unlisted Performance Rights 11,281,000
Share price range last 12 months: $0.016 to $0.068
Share price at end of Quarter: $0.017 Company Secretary - Graeme Scott
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled
$1,242,349 Details of exploration activities undertaken during the Quarter are as described above and in this
section.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development activities
undertaken during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial
percentage interest held in those Tenements at the end of the Quarter is included in the Table at the end of
this as Appendix 1.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter totalled
$159,499. The payments were in respect of salaries and superannuation paid to the executive director and
directors’ fees payable to the non-executive directors.
14
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
About WIN Metals
WIN Metals Limited (ASX: WIN) is an Australian mineral exploration company with a portfolio of quality gold,
nickel, and lithium assets across approximately 350 km² of granted tenure in the Southern Goldfields and
Kimberley regions of Western Australia.
The Mt Edwards Nickel and Faraday–Trainline Lithium Projects are located near Widgiemooltha,
approximately 80 km south of Kalgoorlie-Boulder and 30 km south of Kambalda.
• The Mt Edwards Nickel Project is a collection of eleven (11) nickel deposits with a combined mineral
resource of 12.7 Mt @ 1.43% Ni for 180,900 t of contained nickel6
.
• The Faraday-Trainline Lithium Project hosts a reported mineral resource of 1.96 Mt at 0.69% Li2O7
.
In the Kimberley region, the Butchers Creek Gold Project lies 30 km southeast of Halls Creek. The project is
centred on a historic gold production area and hosts a global Mineral Resource of 5.6 Mt @ 1.98 g/t Au for
359,000 ounces8
of gold. Historical mining between 1995 and 1997 produced approximately 52,000 ounces.
The Radio Gold Project, located 8 km north of Bullfinch and approximately 38 km northwest of Southern
Cross, is another cornerstone asset within WIN’s portfolio. Over its mine life, Radio produced roughly 71,000
ounces of gold at an average grade of 38 g/t Au. WIN’s 2026 global Mineral Resource Estimate for the Project
totals 366,000t @ 4.22 g/t Au for 49,600 ounces of contained gold.
WIN Metals remains focused on advancing its diversified portfolio of critical and precious metal projects
through targeted exploration and development activities aimed at building long-term shareholder value.
Table 3: WIN Metals Butchers Creek Gold Mineral Resource Estimates
Last Update Resource Classification Tonnes (Mt) Au g/t Contained Gold (Oz)
Butchers Creek Apr-25
Indicated 3.58 2.24 258,000
Inferred 1.65 1.18 63,000
Golden Crown Jun-21 Inferred 0.40 3.10 38,000
Total Indicated + Inferred 5.63 1.98 359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t Au cut-off below 150m of
surface. Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
Table 4: Radio Gold Project Mineral Resource Summary by classification
Resource Classification Tonnes Au g/t Contained Gold (Oz)
Indicated 200,000 4.0 25,500
Inferred 166,000 4.5 24,100
Total 366,000 4.2 49,600
Note: Figures are rounded and reported at 0.5 g/t cut-off to 50 m below surface (open pit) and 1.0 g/t below 50 m of surface. Tonnes and grade have
been rounded to reflect the relative uncertainty of the estimates
6
ASX:WIN “Sale of non-core assets yield $1.4M for WIN to advance gold Assets” Released 1 July 2025
7
ASX:WIN “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
8
ASX:WIN “WIN advances Butchers Creek towards development following resource update” Released 16 April 2025
15
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Table 5: WIN Metals Mt Edwards Nickel Mineral Resource Estimates
Deposit
Indicated Inferred TOTAL Resources
Tonne (Mt) Nickel (%) Tonne (Mt) Nickel (%) Tonne (Mt) Nickel (%) Nickel Tonnes
Gillett* 2.27 1.35 0.87 1.16 3.14 1.30 40,770
Widgie 3* 0.51 1.34 0.22 1.95 0.73 1.53 11,200
Widgie Townsite* 1.65 1.60 0.85 1.38 2.50 1.53 38,260
Armstrong* 0.95 1.45 0.01 1.04 0.96 1.44 13,820
132N 0.03 2.90 0.43 1.90 0.46 2.00 9,050
Cooke 0.15 1.30 0.15 1.30 2,000
Inco Boundary 0.46 1.20 0.46 1.20 5,590
McEwen 1.13 1.35 1.13 1.35 15,340
McEwen Hangingwall 1.92 1.36 1.92 1.36 26,110
Mt Edwards 26N 0.87 1.43 0.87 1.43 12,400
Zabel 0.27 1.94 0.05 2.04 0.33 1.96 6,360
TOTAL 5.68 1.48 6.97 1.39 12.66 1.43 180,900
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni cut- off. Tonnes and grade
have been rounded to reflect the relative uncertainty of the estimates.
Table 6: WIN Metals Mt Edwards Lithium Mineral Resource Estimates
Deposit
Measured Indicated Inferred TOTAL Resources
Tonne (kt) Li2O (%) Tonne (kt) Li2O (%) Tonne (kt) Li2O (%) Tonne (kt) Li2O (%) Li2O Tonnes
Faraday 550 0.75 250 0.66 220 0.61 1,020 0.7 7,100
Trainline - - 780 0.69 160 0.63 940 0.68 6,300
TOTAL 550 0.75 1,020 0.68 390 0.62 1,960 0.69 13,500
Reported above a cut-off grade of 0.30% Li2O to a depth of 310mRL (65m below surface) and 0.50% Li2O below 310mRL to 250mRL. Tonnes and grade
have been rounded to reflect the relative uncertainty of the estimates.
16
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Figure 8: WIN’s Gold, Nickel and Lithium Project Locations
17
June 2026 Quarterly Report
31 July 2026
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
Competent Person Statement – WIN Metals
The information in this announcement that relates to exploration results is based on information reviewed by Mr Chris
Hesford, who is a full-time employee of WIN Metals Ltd. Mr Hesford is a member of the Australian Institute of
Geoscientists. Mr Hesford has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hesford
consents tothe inclusion in the report of the matters based on his information in the form and context in which it appears.
Additionally, Mr Hesford confirms that the entity is not aware of any new information or data that materially affects the
information contained in the ASX releases referred to in this report.
Forward Looking Statements
This announcement containsforward-looking statements which represent expectations, intentions, or projections about
future events and performance. These statements are subject to known and unknown risks, uncertainties, and
assumptions, many of which are outside the control of WIN Metals Ltd and its directors or management. Words such as
'may', 'could', 'believes', 'estimates', 'targets', 'expects', and 'intends', and similar expressions, are intended to identify
such forward-looking statements.
Such statements are not guarantees of future results and are based on current economic, regulatory, and operating
conditions as well as assumptions regarding future events which are, at the date of this announcement, believed to be
reasonable. Actual results and developments may differ materially from those expressed or implied in these statements.
Accordingly, undue reliance should not be placed on any forward-looking statements. Except as required by law or the
ASX Listing Rules, WIN Metals Ltd does not undertake any obligation to update or revise forward-looking statements to
reflect any changes in circumstances or events that occur after the date of this announcement.
Summary Information
This announcement has been prepared by WIN and includes information regarding WIN’s disclosure of results to the
ASX.
This announcement should also be read in conjunction with WIN’s other periodic and continuous disclosure
announcements lodged with the ASX, which are available at www.asx.com.au and available on WIN’s website at
www.winmetals.com.au.
Table 7: Reference documents included in t
Share your feedback
Discover