Radio Gold Project Exploration Results
Released
Released
Announcement PDF
1
ASX Announcement
ASX:WIN
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
21 January 2026
RADIO GOLD PROJECT EXPLORATION
RESULTS
Shallow mineralisation drilled at Radio South and Green Harp; surface
sampling at Repeater confirms lode projects through to surface
WIN Metals Ltd (ASX: WIN) is pleased to report the remaining assay results from its highly
successful maiden 2025 drilling programme at the Company’s 100% owned Radio Gold Project,
located 38 km north of Southern Cross in Western Australia.
The drilling has confirmed shallow gold mineralisation at the historic workings of the Radio South
and Green Harp mines and identified multiple near-surface gold intercepts and surface
mineralisation. These results further support Radio’s potential as a near-term production
opportunity for WIN, with development targeted for 2026, subject to the completion of studies and
receipt of necessary approvals.
Key outcomes from the programme include:
• Confirmation of shallow gold mineralisation at Radio South and Green Harp, with
mineralisation remaining open down-dip and along strike, beyond historical workings.
• Identification of near-surface, ore-grade gold intercepts around the historic Radio Mill area,
highlighting low-cost extractable mineralisation at surface.
• Surface sampling at Repeater confirming outcropping main lode mineralisation in the pit
floor (up to 29.6g/t Au),extending the known lode to surface where drill testing is constrained
by the existing open pit footprint.
Key drilling results from Radio South and Green Harp include:
• 3m @ 4.36 g/t Au from 15m (25RDRC127) Radio South
• 1m @ 8.03 g/t Au from 57m (25RDRC145) Radio South
• 5m @ 1.42 g/t Au from 55m (25RDRC139) Radio South
• 5m @ 1.17 g/t Au from 24m (25RDRC128) Radio South
• 1m @ 5.38 g/t Au from 65m (25RDRC154) Radio South
• 1m @ 3.22 g/t Au from 30m (25RDRC098) Green Harp
Key drilling results from Radio Mill area include:
• 2.5m @ 0.66 g/t Au from 0m (25RDRC172)
• 1.0m @ 1.25 g/t Au from 0m (25RDRC164)
• 1.5m @ 0.81 g/t Au from 0m (25RDRC207)
Radio Gold Project Exploration Results
21 January 2026
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
• 1.0m @ 1.21 g/t Au from 0m (25RDRC163)
• 0.5m @ 2.00 g/t Au from 0m (25RDRC183)
Managing Director and CEO, Mr Steve Norregaard commented:
“Radio continues to evolve as an exciting growth opportunity for WIN, with this latest set of results
adding further scale and confidence to a high-grade, multi-target gold system. Shallow
mineralisation at Radio South and Green Harp, combined with near-surface material around the
historic Radio Mill and outcropping lode mineralisation at Repeater, provides additional pathways
to advance Radio towards a restart.”
“As we move into 2026, our focus is on defining additional Mineral Resources, optimising mine
designs for both open pit and underground development scenarios that may lead to a successful
production restart”
Drill Results
Key results are summarised below with full detail of drilling results outlined in the appendices.
Figure 1: Radio South and Green Harp long section looking north west. Call outs hole ID, x m at xx g/t Au
Radio Gold Project Exploration Results
21 January 2026
3
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Figure 2: Radio Gold Project mineralisation wireframes with all drill traces shown
Radio South and Green Harp:
Radio South and the Green Harp prospects have historical production records dating back to 1911,
with 1,447 tonnes processed at an average grade of 28g/t Au for 1,313 ounces of gold produced, as
reported in the Western Australia Department of Mines’ “List of Cancelled Gold Mining Leases
1954”1
.
Recent drilling at Radio South and the adjacent Green Harp prospect has confirmed the presence
of shallow gold mineralisation immediately below and adjacent to historic workings, with several
high-grade intercepts recorded along the mineralised trend.Significant results include 3m at 4.36g/t
Au from 15m (25RDRC127), 1m at 8.03g/t Au from 57m (25RDRC145) and 1m at 5.38g/t Au from 65m
(25RDRC154).
1
Western Australia Department of Mines “List of Cancelled Gold Mining Leases 1954” page 242 Green Harp, Green Harp
New and New Green Harp Leases.
Radio Gold Project Exploration Results
21 January 2026
4
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Radio South mineralisation is now defined over approximately 100m of strike and 150m vertically,
remaining open at depth and to the south-west, while drilling at Green Harp has confirmed that the
lode continues beneath the shallow historical workings with intercepts such as 1m at 3.22g/t Au
from 30m (25RDRC098) and 2m at 4.10g/t Au from 59m in historic hole RDRC0402
. The Company’s
geological interpretation suggesting they represent the same mineralised structure that has been
structurally offset, providing a compelling target for follow up drilling.
Radio Mill:
Around the historic Radio Mill area, shallow drilling has returned multiple near-surface intercepts
commencing from surface, including 2.5m at 0.66g/t Au from 0m (25RDRC172), 1.0m at 1.25g/t Au
from 0m (25RDRC164) and 0.5m at 2.00g/t Au from 0m (25RDRC183). These results are consistent
with the interpreted thin, flat-lying veneer of gold bearing material thought to be related to historical
processing activities.
Radio Deeps:
Four drill holes were completed to test the main Radio mineralised zone at depth. Three of the four
holes intersected quartz veining at the anticipated target horizon, confirming that the structure
continues below the current resource envelope, with hole 25RDRC098 returning 1m @ 0.46g/t Au
from 218m. Further drilling and geological interpretation are planned to refine the geometry and
plunge of the mineralised shoots beneath the existing resource envelope. Two additional holes were
abandoned prior to reaching target depth due to excessive water ingress.
Repeater Surface Sampling:
A targeted surface sampling program was completed at the Repeater prospect to determine
whether the mineralised quartz lodes intersected in drilling extend to surface. Both the projected
Main and East lodes were identified within the pit floor and walls, returning assays of 29.6g/t Au and
0.23g/t Au respectively (Table 7). These results confirm that the mineralisation observed at depth
continues to surface. Due to the restricted nature of the shallow open pit, this zone could not be
effectively tested by drilling. Accordingly, the completion of in-pit sampling provides valuable
geological control for extending the mineralisation model to the current surface.
2
ASX:WIN “Radio Gold Project Historic Exploration Results” Released 21 October 2025
Radio Gold Project Exploration Results
21 January 2026
5
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Figure 3: Repeater prospect sampling locations with image showing recently completed drilling
Next Steps
• Define and prioritise resource growth opportunities across the broader Radio Gold Project
to guide 2026 drill targeting.
• Complete a maiden Mineral Resource Estimate for Repeater and update the Radio deposit
resource model to supporting mine design, scheduling and development studies destined
for completion by the end of Q1 2026.
• Evaluate extraction options for the near surface mineralisation at the Radio Mill area.
• Use these technical studies to assess near-term restart options with underground mining
envisaged as the initial focus, followed by open pit mining over largely unmined near-surface
mineralisation.
• WIN plans to complete all approvals, funding and a positive development decision by the
end of Q2 2026.
• Commence additional resource drilling in Q1 2026 to expand the resource base, improve
confidence in the current geological and resource models, and thereby de‑risk potential
mining activities.
Radio Gold Project Exploration Results
21 January 2026
6
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Location and Project History
The Radio Gold Project is situated within the Shire of Yilgarn in Western Australia, approximately
8km north of Bullfinch and 38km north of Southern Cross in the Eastern Goldfields region of Western
Australia. The site is accessed via the unsealed Mt Jackson Road, providing direct entry to the
Project area.
Figure 4: Location of Radio Gold Project
Goldmining at the RadioGold Project commenced in 1918,producing approximately 71,000 ounces
of gold at an impressive average head grade of 38g/t Au between 1918 and 1974.
Underground operationsat Radio were re‑established in 2018 using the existing shaft infrastructure,
with limited ore drive development completed from the bottom 10 level. More recently, privately
held Radio Gold Pty Ltd (NuFortune) developed a new surface portal and approximately 330 metres
of decline to the historic second level, allowing the introduction of mechanised mining and a
transition away from historic small-scale, shaft‑access methods. A shallow open pit to around 25
metres depth was also developed in the central part of the mine; however, most near‑surface
mineralisation remains unmined, as previous activities were primarily focused on the high‑grade
underground lodes, providing potential for future low‑cost open pit production alongside existing
underground targets. The Radio mine site remains intact and dewatered, with substantial
underground infrastructure and equipment in place, positioning the Project for a potential rapid
restart of mining activities.
Historic production records for Repeater, Radio South and Green Harp are limited. At Repeater,
mining has been restricted to a shallow open pit less than 5m deep and limited underground
development in the north of the prospect, serviced by a vertical haulage shaft and underlay shaft in
Radio Gold Project Exploration Results
21 January 2026
7
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
the northern part of the pit. Radio South and Green Harp have been exploited via underground
workings, with recent drilling at Radio South defining the extent of historical stoping and detailed
historical mine plans nowsourced for Green Harp to support ongoing geological and mining studies.
Regional Geology
The regional geology of the Radio Gold Project is defined by its position on the eastern margin of the
Archean Southern Cross Greenstone Belt, within the central Yilgarn Craton of Western Australia.
The Southern Cross Belt is an elongated, north-northwest trending sequence of predominantly
mafic to ultramafic volcanic rocks, interlayered with banded iron formation (BIF) and minor
sediments, intruded by voluminous granitoid domes such as the Ghooli Dome. The greenstone
succession is highly deformed, manifesting major folding, faulting, and shearing, and is
metamorphosed primarily to amphibolite facies near the granite boundaries, with lower greenschist
facies preserved in the belt core.
The structural architecture of the region is dominated by major north to northwest trending axes and
ovoid granitoid intrusions, resulting in complex dome-and-keel geometries. Gold mineralisation in
the province is typically structurally controlled, associated with late stage transpressional shear
zones and contacts between greenstones and granitoids. The Radio Gold Project lies at a key
geological interface between sheared greenstones and the Ghooli granitoid, a setting recognised as
highly prospective for high-grade, vein-hosted orogenic gold deposits.
Local Geology
The local geology of the Radio Gold Project is defined by its position along the eastern margin of the
Archean Southern Cross Greenstone Belt, near the triple junction of three granite bodies. The
immediate mine area comprises six steeply dipping, northwest-trending tectono-stratigraphic
units. The northeastern part of the tenement is underlain by sub-cropping granite containing rafts of
banded iron formation (BIF) and ultramafic–mafic schists. Adjacent to this granite is a 500–1,500m
wide zone of strongly foliated amphibolite interlayered with BIF, ultramafic rocks and rare
sediments.
The Radio Gold Mine itself is developed within the Ghooli granite dome, with quartz lodes extending
west from the main granite body. Granitic rocks at Radio display strong S2–S3 fabrics, indicative of
syn to late-tectonic granite emplacement related to regional folding and faulting. The central part of
the mine sequence is dominated by a 5km wide,northwest trending greenstone package of tholeiitic
basalt and minor dolerite dykes, generally lacking pervasive foliation.
BIFs within the greenstone sequence mark key stratigraphic horizons and are commonly associated
with mafic and ultramafic schists in the southwest part of the project. Quartz lodes hosting gold
mineralisation (Main and East lodes) exploit faulted granite contacts and adjacent amphibolite or
sericite–kaolinite–chlorite–pyrite-altered granites.
Geological Interpretation
Gold mineralisation at Radio is localised within two narrow high-grade quartz lodes, the Main
(Footwall) Lode and the East (Hanging wall) Lode hosted by sheared granite along the greenstone
belt margin. These subparallel lodes strike northeast and dip 30–60° east southeast, with continuity
mapped for 130m underground and up to 700m at surface. The lodes comprise laminated to
massive quartz veins within sericite altered granitic gneiss, typically 0.2–1m wide, with localised
thickening in dilation zones. The vein system forms en-echelon arrays and stacked mineralised
Radio Gold Project Exploration Results
21 January 2026
8
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
shoots (100–300m in length), commonly pitching obliquely to the main lode trend—reflecting a
structurally complex, brittle–ductile shear system. Gold occurs predominantly as coarse, free gold,
with accessory pyrite, galena and arsenopyrite, consistent with an orogenic quartz vein style.
Three primary mineralised zones have been delineated at the Radio Gold Project:
• Radio Main – The central and most developed zone of mineralisation comprising two closely
spaced subparallelen-echelon lodes (Main and East lodes) positioned approximately 1 – 5m
apart. These lodes represent the core of historical production and remain the principal focus
for ongoing resource definition.
• Radio Repeater – Located immediately north of Radio Main, this zone is interpreted as a
geological continuation of the main mineralised system. It is separated from the central
zone by a mafic intrusive unit that forms a barren structural partition between the two
mineralised corridors.
• Radio South/Green Harp – Situated south of the main mineralised trend, this zone consists
of multiple gold-bearing lodes that dip steeply (60°– 80°) to the southeast. The lodes display
a distinct structural orientation relative to the main Radio system, indicating a separate yet
related deformation event controlling gold deposition.
Exploration Potential and Further Work
The Radio Gold Project presents significant exploration and growth potential, supported by both
historical production data and newly updated geological models. Growth potential remains at all
prospects and will be fully evaluated in 2026 post mineral resource update.
Beyond the central prospects, numerous untested historical workings and structural trends within
WIN’s tenure provide additional exploration upside. Priority targets include the Manxman and
Queenslander lines of workings, and the along strike extensions of the Mistletoe and Two Boys line
of workings in the southwest of the tenure.
Radio Gold Project Exploration Results
21 January 2026
9
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
About WIN Metals
WIN Metals (ASX: WIN) is a mineral exploration company holding 350km2
of granted tenure in the
Southern Goldfields and Kimberley regions of Western Australia. WIN’s mineral endowment
includes gold, nickel and lithium resources within the Company’s extensive tenure.
The Mt Edwards Nickel and Faraday-Trainline Lithium Projects are situated near Widgiemooltha,
approximately 80km south of the regional centre of Kalgoorlie-Boulder and 30km south of
Kambalda. The Mt Edwards Nickel Project is a collection of eleven (11) nickel deposits with a total
mineral resource of 12.7Mt @ 1.43% Ni for 180,900t of contained nickel3
. The Faraday-Trainline
Lithium Project has a reported mineral resource of 1.96 Mt at 0.69% Li2O4
.
The Butchers Creek Gold Project is located 30km southeast of Halls Creek in the Kimberley region
of Western Australia. It is a historic gold production centre hosting a global mineral resource of
5.6Mt at 1.98g/t Au for 359,000oz5
of gold. Previous mining operations at Butchers Creek produced
52,000 ounces of gold between 1995 and 1997.
WIN recently acquired the Radio Gold Project in September 2025, located 8km north of Bullfinch,
approximately 38km northwest of Southern Cross and about 400km east of Perth in the Yilgarn
region of Western Australia. Over its production life, the Radio mine has historically produced
approximately 71,000 ounces at an exceptionally high grade of 38g/t Au.
Table 1: WIN Metals Butchers Creek Gold Mineral Resource Estimates
Deposit Last Update Resource Classification Tonnes (Mt) Au (g/t) Contained Gold (Oz)
Butchers Creek Apr-25
Indicated 3.58 2.24 258,000
Inferred 1.65 1.18 63,000
Golden Crown Jun-21 Inferred 0.40 3.10 38,000
Total Indicated + Inferred 5.63 1.98 359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t Au cut-off below
150m of surface. Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
Table 2: WIN Metals Mt Edwards Nickel Mineral Resource Estimates
Deposit
Indicated Inferred TOTAL Resources
Tonne
(Mt)
Nickel
(%)
Tonne
(Mt)
Nickel
(%)
Tonne
(Mt)
Nickel
(%)
Nickel
Tonnes
Gillett* 2.27 1.35 0.87 1.16 3.14 1.30 40,770
Widgie 3* 0.51 1.34 0.22 1.95 0.73 1.53 11,200
Widgie Townsite* 1.65 1.60 0.85 1.38 2.50 1.53 38,260
Armstrong* 0.95 1.45 0.01 1.04 0.96 1.44 13,820
132N 0.03 2.90 0.43 1.90 0.46 2.00 9,050
Cooke 0.15 1.30 0.15 1.30 2,000
Inco Boundary 0.46 1.20 0.46 1.20 5,590
McEwen 1.13 1.35 1.13 1.35 15,340
3
ASX:WIN “Sale of non-core assets yield $1.4M for WIN to advance gold Assets” Released 1 July 2025
4
ASX:WIN “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
5
ASX:WIN “WIN advances Butchers Creek towards development following resource update” Released 16 April 2025
Radio Gold Project Exploration Results
21 January 2026
10
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Deposit
Indicated Inferred TOTAL Resources
Tonne
(Mt)
Nickel
(%)
Tonne
(Mt)
Nickel
(%)
Tonne
(Mt)
Nickel
(%)
Nickel
Tonnes
McEwen
Hangingwall
1.92 1.36 1.92 1.36 26,110
Mt Edwards 26N 0.87 1.43 0.87 1.43 12,400
Zabel 0.27 1.94 0.05 2.04 0.33 1.96 6,360
TOTAL 5.68 1.48 6.97 1.39 12.66 1.43 180,900
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni
cut- off. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
Table 3: WIN Metals Mt Edwards Lithium Mineral Resource Estimates
Deposit
Measured Indicated Inferred TOTAL Resources
Tonne
(kt)
Li2O
(%)
Tonne
(kt)
Li2O
(%)
Tonne
(kt)
Li2O
(%)
Tonne
(kt)
Li2O
(%)
Li2O
Tonnes
Faraday 550 0.75 250 0.66 220 0.61 1,020 0.7 7,100
Trainline - - 780 0.69 160 0.63 940 0.68 6,300
TOTAL 550 0.75 1,020 0.68 390 0.62 1,960 0.69 13,500
Reported above a cut-off grade of 0.30% Li2O to a depth of 310mRL (65m below surface) and 0.50% Li2O below 310mRL
to 250mRL. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
Figure 5: WIN’s Gold, Nickel and Lithium Project Locations
Radio Gold Project Exploration Results
21 January 2026
11
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Competent Person Statement – WIN Metals
The information in this announcement that relates to exploration results is based on information
reviewed, collated and fairly represented by Mr William Stewart, who is a full-time employee of WIN
Metals Ltd. Mr Stewart is a member of the Australian Institute of Mining and Metallurgy (AusIMM, Member
No. 224335). Mr Stewart has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Stewart consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears. Additionally, Mr Stewart confirms that the
entity is not aware of any new information or data that materially affects the information contained
in the ASX releases referred to in this report.
Forward Looking Statements
This announcement includes forward-looking statements that are only predictions and are subject
to known and unknown risks, uncertainties, assumptions and other important factors, many of
which are beyond the control of WIN Metals Ltd, the directors and the Company’s management.
Such forward-looking statements are not guarantees of future performance.
Examplesof forward-looking statements used in this announcement include use of the words ‘may’,
‘could’, ‘believes’, ’estimates’, ‘targets’, ’expects’, or ‘intend’ and other similar words that involve
risks and uncertainties. These statements are based on an assessment of present economic and
operating conditions, and on a number of assumptions regarding future events and actions that, as
at the date of announcement, are expected to take place.
Actual values, results, interpretations or events may be materially different to those expressed or
implied in this announcement. Given these uncertainties, recipients are cautioned not to place
reliance on forward-looking statements in the announcement as they speak only at the date of issue
of this announcement. Subject to any continuing obligations under applicable law and the ASX
Listing Rules, WIN Metals Ltd does not undertake any obligation to update or revise any information
or any of the forward-looking statements in this announcement or any changes in events, conditions
or circumstances on which any such forward-looking statement is based.
Summary Information
This announcement has been prepared by WINand includes information regarding WIN’s disclosure
of results to the ASX.
This announcement should also be read in conjunction with WIN’s other periodic and continuous
disclosure announcements lodged with the ASX, which are available at www.asx.com.au and
available on WIN’s website at www.winmetals.com.au.
Table 4: Reference documents included in this announcement
Number Date Company Title
1 1954 DMPE Western Australia Department of Mines “List of Cancelled Gold Mining Leases 1954”
2 21-Oct-25 WIN Radio Gold Project Historic Exploration Results
3 1-Jul-25 WIN Sale of non-core assets yield $1.4M for WIN to advance gold Assets
4 8-Nov-23 WIN 375% Growth in Faraday-Trainline Lithium Mineral Resource
5 16-Apr-25 WIN WIN advances Butchers Creek towards development following resource update
Radio Gold Project Exploration Results
21 January 2026
12
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Compliance Statement
The Company confirms it is not aware of any new information or data that materially affects the
information included in the original market announcement(s), and in the case of estimates of
Mineral Resources that all material assumptions and technical parameters underpinning the
estimates in the relevant announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcement.
Approved by: The Board of Directors
-ENDS-
For further details please contact:
Steve Norregaard
Managing Director
WIN Metals Ltd
steve@winmetals.com.au
0472 621 529
Radio Gold Project Exploration Results
21 January 2026
13
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Appendices
Table 5: Drill Collar Data
Hole ID
Northing
(m)
Easting
(m)
Elevation
(m)
Azimuth Dip
EOH
Depth (m)
Hole
Type
25RDRC065 6577688 699159 351 324 -60 21 RC
25RDRC066 6577680 699165 351 322 -60 37 RC
25RDRC067 6577672 699171 351 320 -59 43 RC
25RDRC068 6577694 699167 351 320 -60 21 RC
25RDRC069 6577687 699173 351 320 -60 32 RC
25RDRC070 6577679 699179 351 318 -60 44 RC
25RDRC071 6577708 699168 351 318 -60 12 RC
25RDRC072 6577701 699175 351 319 -60 22 RC
25RDRC073 6577693 699181 351 319 -60 33 RC
25RDRC074 6577686 699188 351 319 -60 47 RC
25RDRC075 6577715 699176 351 322 -60 11 RC
25RDRC076 6577707 699182 351 321 -60 22 RC
25RDRC077 6577699 699189 351 320 -60 33 RC
25RDRC078 6577691 699195 350 321 -60 45 RC
25RDRC084 6577672 699256 351 339 -76 145 RC
25RDRC085 6577720 699311 350 280 -72 145 RC
25RDRC086 6577722 699359 350 301 -61 155 RC
25RDRC087 6577757 699373 349 300 -70 180 RC
25RDRC088 6577661 699315 351 302 -71 185 RC
25RDRC089 6577711 699351 350 277 -71 190 RC
25RDRC090 6577719 699378 350 292 -70 189 RC
25RDRC091 6577730 699397 350 310 -71 190 RC
25RDRC095 6578002 699371 348 303 -60 232 RC
25RDRC096 6577948 699397 347 301 -65 166 RC
25RDRC097 6577884 699366 348 300 -65 248 RC
25RDRC098 6577854 699286 349 312 -61 240 RC
25RDRC099 6577826 699313 349 294 -72 280 RC
25RDRC100 6577801 699245 350 289 -76 237 RC
25RDRC111 6577722 699185 351 302 -67 17 RC
25RDRC112 6577715 699190 351 321 -59 27 RC
25RDRC113 6577707 699197 351 320 -60 32 RC
25RDRC114 6577699 699203 350 320 -61 42 RC
25RDRC115 6577729 699193 351 316 -60 17 RC
25RDRC116 6577722 699199 350 317 -60 27 RC
25RDRC117 6577715 699205 350 317 -60 37 RC
25RDRC118 6577707 699212 350 314 -60 42 RC
Radio Gold Project Exploration Results
21 January 2026
14
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Hole ID
Northing
(m)
Easting
(m)
Elevation
(m)
Azimuth Dip
EOH
Depth (m)
Hole
Type
25RDRC119 6577701 699219 350 314 -61 57 RC
25RDRC120 6577735 699200 350 318 -60 17 RC
25RDRC121 6577728 699206 350 317 -60 27 RC
25RDRC122 6577720 699213 350 316 -59 32 RC
25RDRC123 6577713 699220 350 318 -60 47 RC
25RDRC124 6577706 699226 350 316 -65 57 RC
25RDRC125 6577742 699208 350 320 -60 17 RC
25RDRC126 6577734 699214 350 320 -61 22 RC
25RDRC127 6577727 699220 350 318 -60 32 RC
25RDRC128 6577720 699226 350 316 -60 47 RC
25RDRC129 6577693 699247 350 320 -60 77 RC
25RDRC130 6577749 699216 350 324 -60 12 RC
25RDRC131 6577741 699221 350 318 -60 22 RC
25RDRC132 6577733 699228 350 317 -60 32 RC
25RDRC133 6577725 699234 350 319 -59 32 RC
25RDRC134 6577718 699241 350 319 -60 42 RC
25RDRC135 6577747 699229 350 320 -61 22 RC
25RDRC136 6577740 699235 350 317 -61 37 RC
25RDRC137 6577732 699242 350 314 -61 47 RC
25RDRC138 6577725 699249 350 313 -60 57 RC
25RDRC139 6577708 699261 350 319 -60 77 RC
25RDRC140 6577760 699232 350 318 -61 17 RC
25RDRC141 6577754 699236 350 318 -61 32 RC
25RDRC142 6577747 699243 350 314 -61 37 RC
25RDRC143 6577739 699250 350 319 -61 47 RC
25RDRC144 6577731 699257 350 317 -61 57 RC
25RDRC145 6577717 699270 350 313 -60 77 RC
25RDRC146 6577749 699253 350 315 -60 42 RC
25RDRC147 6577744 699257 350 317 -61 52 RC
25RDRC148 6577737 699264 349 318 -60 57 RC
25RDRC149 6577723 699277 350 314 -60 77 RC
25RDRC150 6577755 699259 350 319 -59 37 RC
25RDRC151 6577750 699264 350 320 -60 47 RC
25RDRC152 6577743 699270 349 317 -61 60 RC
25RDRC153 6577749 699278 349 322 -60 60 RC
25RDRC154 6577742 699296 349 320 -60 102 RC
25RDRC155 6577944 699114 351 359 -90 5 RC
25RDRC156 6577954 699114 351 359 -90 5 RC
25RDRC157 6577949 699124 351 359 -90 5 RC
Radio Gold Project Exploration Results
21 January 2026
15
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
Hole ID
Northing
(m)
Easting
(m)
Elevation
(m)
Azimuth Dip
EOH
Depth (m)
Hole
Type
25RDRC158 6577981 699183 350 359 -90 5 RC
25RDRC159 6577984 699174 350 359 -90 5 RC
25RDRC160 6577989 699184 350 359 -90 5 RC
25RDRC161 6577984 6
Share your feedback
Discover