WIN Metals Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
ASX:WIN
31 January 2025
December 2024 Quarterly Report
Highlights
Butchers Creek Gold Project
•
Reverse Circulation (RC) and diamond drilling program completed for a total of 25 drillholes for 7,200m.
Golden Crown Deposit Exploration / Growth Drilling
•
Drilling confirmed high-grade mineralisation extends 140m below the Golden Crown resource, previously
modelled only to 100m depth. Golden Crown drilling had a 100% success rate with all 3 holes intersecting highgrade gold mineralisation. Results demonstrate potential for significant resource growth at Golden Crown.
Significant gold results returned from drilling at Golden Crown North 1, included:
•
6m @ 10.85g/t gold from 253m, incl. 3m @ 21.07g/t (24BCRC014) – 140m below current resource
•
5m @ 3.63g/t gold from 222m, incl. 2m @ 8.08g/t (24BCRC012)
•
2m @ 6.00g/t gold from 130m (24BCRC013)
Butcher Creek Deposit Resource Definition Drilling
•
Drilling at Butchers Creek continues to add definition to the thick high-grade central hinge position and eastern
limb mineralisation demonstrating resource growth potential. Significant gold results received from Butchers
Creek 2,3 include:
•
•
32m @ 2.65g/t gold from 231m, incl. 24m @ 3.37g/t (24BCRC021)
•
28m @ 2.90g/t gold from 291m, incl. 21m @ 3.54g/t (24BCRC019)
•
8m @ 4.55g/t gold from 293m (24BCRC020)
•
66m @ 1.89g/t gold from 280m, incl. 17m @ 3.10g/t (24BCRC002)
•
10m @ 2.54g/t gold from 368m, incl. 3m @ 5.70g/t (24BCRC004)
•
98m @ 1.47g/t gold from 251m, incl. 13m @ 2.99g/t (24BCRC015)
•
77m @ 1.68g/t gold from 251m, incl. 11m @ 2.51g/t (24BCRC016)
Exploration drilling targeting the down plunge extension of Butchers Creek gold system was completed during
the Quarter with assay results expected Q3 FY25.
Corporate
•
Settlement of A$3.6 million placement completed following receipt of shareholder approval for the issue of the
placement shares and options at the General Meeting of shareholders held on 21 October 2024.
•
Completion of the transaction with Meteoric Resources (ASX:MEI) to acquire the Butchers Creek Gold Project
(formerly Palm Springs) located in the Kimberley region of Western Australia via a tenement sale agreement
occurred on 21 November 2024.
•
In December WIN confirmed receipt of a Research and Development (R&D) Tax Incentive refund of $855,000
related to the 2023/2024 financial year.
1
ASX Announcement 25 November 2024 – Golden Crown North Delivers High Grades and Growth Potential
2
ASX Announcement 7 November 2024 - Butchers Creek Gold Project Delivers High-Grade Results
3
ASX Announcement 10 December 2024 – Thick High-Grade Gold Intersected in Butchers Creek Infill Drilling
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
1
December 2024 Quarterly Report
31 January 2025
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to present its Quarterly Activities Report for the
period ended 31 December 2024.
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
"We are thrilled with the exceptional results from our first drilling programs at Butchers Creek and Golden Crown,
which have confirmed resource growth potential. The high-grade broad intercepts across both projects, including
new depth extensions at Golden Crown and promising intersections at Butchers Creek, mark a pivotal step forward
in our exploration success. With continued progress in 2025, we're excited to further unlock the value of these high
value projects."
Butchers Creek Gold Project Acquisition Completed
The Butchers Creek Gold Project (“Butchers Creek” or “the Project”) is located 30km south-east of Halls Creek in
the Kimberley region of Western Australia. Butchers Creek is a historic gold production centre hosting a global
mineral resource of 5.6Mt at 2.0g/t Au for 357,000oz of gold and a series of advanced gold drill targets. Previous
production from the Butchers Creek gold mine resulted in 52,000oz of gold being produced between 1995 and 1997.
The Project consists of three mining leases, five exploration licences and three prospecting licences. All of the
tenements are in good standing with one exploration licence and one prospecting licence application pending.
Refer to the Corporate Section of this report for further details on the terms of the transaction.
Table 1: Butchers Creek Gold Resources Table Summary 4
Resource
Last
Update
Butchers Creek
Golden Crown
Total
Indicated
Inferred
Total
Tonnes
(Mt)
Grade
(g/t Au)
Tonnes
(Mt)
Grade
(g/t Au)
Tonnes
(Mt)
Grade
(g/t Au)
Ounces
Jun-21
1.9
2.2
3.3
1.7
5.2
1.9
319,000
Jun-21
-
-
0.4
3.1
0.4
3.1
38,000
1.9
2.2
3.7
1.8
5.6
2.0
357,000
Note: Figures are rounded and reported at 0.8g/t Au cut-off
4
ASX Announcement 11 September 2024 – Butchers Creek Gold Project MRE and Exploration Results - Amended
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
2
December 2024 Quarterly Report
31 January 2025
Figure 1: Location of Butchers Creek Gold Project
Exploration Activities at Butchers Creek Project
The maiden drilling program at Butchers Creek was completed in early November, comprising 25 drillholes for a total
of 7,200m drilled. The program was designed to increase resource confidence and test for down dip extensions at
Butchers Creek and Golden Crown in addition to reconnaissance drilling at Mt Bradley.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
3
December 2024 Quarterly Report
31 January 2025
Golden Crown
Results from drilling at Golden Crown were received in late November 20241. The first three (3) drillholes completed
at Golden Crown North formerly known as “Faugh-a-Ballagh”, part of the larger Golden Crown gold deposit were
designed to validate the current resource model and test down dip extensions with high-grade mineralisation
returning 6m @ 10.85g/t gold (24BCRC014) 140m below the current mineral resource which is modelled to only
100m vertical depth. This illustrates the potential for significant growth of the current 38,000oz resource at Golden
Crown4.
Results include:
•
6m @ 10.85g/t gold from 253m, incl. 3m @ 21.07g/t (24BCRC014) – 140m below current resource
•
5m @ 3.63g/t gold from 222m, incl. 2m @ 8.08g/t (24BCRC012) – 95m below current resource
•
2m @ 6.00g/t gold from 130m (24BCRC013) - 25m below mineral resource
Figure 2: Golden Crown North long section with current mineral resource envelopes
Butchers Creek
Resource definition and infill drilling continued at Butchers Creek gold deposit in the December Quarter. Exploration
drilling was complete targeting the down plunge southern extension of Butcher Creek gold system with assay results
expected in Q3 FY25.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
4
December 2024 Quarterly Report
31 January 2025
Highlights of assay results reported in the December Quarter from Butchers Creek drilling included:
•
32m @ 2.65g/t gold from 231m, incl. 24m @ 3.37g/t (24BCRC021)
•
28m @ 2.90g/t gold from 291m, incl. 21m @ 3.54g/t (24BCRC019)
•
8m @ 4.55g/t gold from 293m (24BCRC020)
•
66m @ 1.89g/t gold from 280m, incl. 17m @ 3.10g/t (24BCRC002)
•
10m @ 2.54g/t gold from 368m, incl. 3m @ 5.70g/t (24BCRC004)
•
98m @ 1.47g/t gold from 251m, incl. 13m @ 2.99g/t (24BCRC015)
•
77m @ 1.68g/t gold from 251m, incl. 11m @ 2.51g/t (24BCRC016)
Figure 3: Long Section of the Butchers Creek gold deposit looking north west. WIN’s highlighted drilling intercepts
detailed in call out boxes.
Butchers Creek Resource Stacks Up
The current mineral resource estimate (MRE) for Butchers Creek gold deposit has been interrogated via a standard
industry yard stick of ounces per vertical metre or OPVM as first pass or high-level measure of a deposits potential
viability leading to development into an economic gold operation. Industry standard for favourable project economics
is considered to be 1,000 OPVM for successful underground development. The current Butchers Creek MRE
demonstrates between the base of the open pit 40m below surface to 300m below surface averages 1,103 OPVM’s3
which is well above this industry underground mining standard (Figure 4). It should be noted the MRE is only restricted
by drilling density and a lack of deeper drilling to confirm continuation at depth. The depth of drilling to date (sub
400m depth) is shallow in comparison to many other comparative bodies of mineralisation under exploration or
development within the gold industry.
The WIN team is encouraged to progress with further drilling to support future mining studies.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
5
December 2024 Quarterly Report
31 January 2025
Figure 4: Butchers Creek MRE OPVM’s (gold bar = indicated resources, light yellow bar = inferred resources)
Future Work
With the 2024 drill programme completed, assay results for the remaining drillholes are expected over the coming
weeks. These results will be evaluated along with the processing of two diamond drill holes from Butchers Creek
southern extension and one diamond drill hole at Golden Crown South.
WIN is taking the opportunity to reprocess all core drilled at the Butchers Creek Gold Project since 2020. All core has
been re-packed in Halls Creek and has arrived in Perth with detailed geological, structural and geotechnical logging
underway. Metallurgical analysis is also planned over the 2024/2025 Kimberley wet season period. This data will be
validated and assist with the remodelling of the Butchers Creek gold deposit coupled with an updated mineral
resource estimate expected in the first half of 2025.
Regional exploration programmes and follow up drill targeting at Butchers Creek Gold Project will be ongoing in the
March quarter in preparation for the 2025 field season.
Work at Mt Edwards Nickel Project will be limited to investigate the further economic downstream processing options
from a nickel in concentrate.
No activities are planned for Faraday-Trainline Lithium Project or regional lithium exploration due to current global
lithium market conditions.
Mt Edwards Nickel Project
WIN controls a dominant ~240 km2 land package over the prolific nickel-producing Widgiemooltha Dome in Western
Australia. The Mt Edwards Nickel Project is positioned adjacent to key infrastructure, located just 80km south of the
major regional centre of Kalgoorlie, 30km south-west of Kambalda and along strike to the north from Wyloo’s Cassini
Nickel mine (Figure 5).
The Mt Edwards Nickel Project is comprised of 12 separate deposits with a total MRE of 13.04Mt grading 1.45% nickel
for 188,160 tonnes 5.
5
ASX Announcement 23 July 2024 – Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN (Updated)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
6
December 2024 Quarterly Report
31 January 2025
In March 2024, the Company released a Scoping Study on the Mt Edwards Nickel Project 6. WIN Metals commissioned
the Scoping Study for the purpose of carrying out a preliminary assessment of the technical and financial viability of
a standalone nickel mining and processing operation.
Limited further testwork is being undertaken to investigate the potential and economics of further downstream
processing options, to produce Nickel Sulphate or NCM battery precurser or pCAM.
No exploration activities at the Mt Edwards Nickel Project were reported during the December Quarter.
Table 2: WIN Metals Total Nickel Mineral Resources
Indicated
Deposit
Inferred
TOTAL Resources
Tonne (kt)
Nickel (%)
Tonne (kt)
Nickel (%)
Tonne (kt)
Nickel (%)
Nickel Tonnes
Gillett*
2,267
1.35
871
1.16
3,138
1.30
40,770
Widgie 3*
512
1.34
222
1.95
734
1.53
11,200
Widgie Townsite*
1,649
1.60
853
1.38
2,502
1.53
38,260
Armstrong*
949
1.45
10
1.04
959
1.44
13,820
132N
34
2.90
426
1.90
460
2.00
9,050
Munda
381
1.91
381
1.91
7,260
Cooke
154
1.30
154
1.30
2,000
Inco Boundary
464
1.20
464
1.20
5,590
McEwen
1,133
1.35
1,133
1.35
15,340
McEwen Hanging wall
1,916
1.36
1,916
1.36
26,110
Mt Edwards 26N
871
1.43
871
1.43
12,400
Zabel
272
1.94
53
2.04
325
1.96
6,360
TOTAL
5,683
1.48
7,354
1.42
13,037
1.45
188,160
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni cutoff. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
6
ASX Announcement 7 March 2024 – Standalone Mt Edwards Project Scoping Study
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
7
December 2024 Quarterly Report
31 January 2025
Figure 5: Location map of Mt Edwards Nickel Project
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
8
December 2024 Quarterly Report
31 January 2025
Faraday-Trainline Lithium Project
The Faraday-Trainline Lithium Project is located in the “lithium corridor” between Mt Marion to the north and Pioneer
Dome to the south in Widgiemooltha, Western Australia. The project hosts the Faraday-Trainline Lithium Deposit as
well as four prospects Farson, Atomic 3, Voyager and Gemini.
Figure 6: WIN Metals lithium deposits and surrounding lithium prospects
The Faraday-Trainline lithium Mineral Resource Estimate (MRE) amounts to 1.96Mt @ 0.69% Li2O including a highgrade, near surface zone of 373kt @ 1.00% Li2O with a Measured and Indicated Mineral Resources total of 1.57Mt @
0.71% Li2O 7.
7
ASX Announcement 8 November 2023 – 375% Growth in Faraday-Trainline Lithium Mineral Resource
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
9
December 2024 Quarterly Report
31 January 2025
Table 3 - WIN Metals Mt Edwards Lithium Mineral Resource Estimates
Measured
Deposit
Indicated
Inferred
TOTAL Resources
Tonne (kt)
Li2O (%)
Tonne (kt)
Li2O (%)
Tonne (kt)
Li2O (%)
Tonne (kt)
Li2O (%)
Li2O Tonnes
Faraday
550
0.75
250
0.66
220
0.61
1,020
0.7
7,100
Trainline
-
-
780
0.69
160
0.63
940
0.68
6,300
TOTAL
550
0.75
1,020
0.68
390
0.62
1,960
0.69
13,500
Reported above a cut-off grade of 0.30% Li2O to a depth of 310mRL (65m below surface) and 0.50% Li2O below 310mRL to
250mRL. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
No exploration activities at the Faraday-Trainline Lithium Project were reported during the December Quarter.
Corporate
As at 31 December 2024, WIN held $2.876m cash at bank. Full details regarding the Company’s cash movements
during the Quarter can be found in the attached Appendix 5B.
Corporate information as at 31 December 2024:
ASX code
WIN
Board of Directors & Management
Quoted Ordinary shares on issue:
550,058,093
Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue:
-
Andrew Parker – Independent Non-Executive Chairman
Unlisted Options ($0.036 to $0.35):
174,467,208
Felicity Repacholi - Independent Non-Executive Director
Unlisted Performance Rights
18,300,000
Scott Perry - Independent Non-Executive Director
Share price range last 12 months:
$0.017 to $0.11
Share price at end of Quarter:
$0.018
Market cap (at $0.018):
$9.9m
Company Secretary - Graeme Scott
Placement Completed
During the December quarter, WIN confirmed settlement of the $3.6 million Placement previously announced on 9
September 2024 8 9.
Settlement followed receipt of shareholder approval for the issue of the placement shares and options given at the
General Meeting of shareholders held on 21 October 2024.
A total of 144,000,000 new fully paid ordinary shares have been issued at $0.025 per share along with 71,999,989
unlisted options. The options have an exercise price of $0.044 per share and an expiry date of 30 April 2026. An
additional 12,960,000 options, on the same terms, have been issued to the Joint Lead Managers to the Placement.
During the Quarter a total of 5,577,120 new fully paid ordinary shares were also issued to Raglan Drilling at $0.025
per share in part payment for drilling services provided at Butchers Creek. This arrangement has now been
completed.
Butchers Creek Gold Project Acquisition Completed
On 21 November 2024, WIN completed all necessary documentation to bring into effect the tenement sale
agreement for the acquisition of the portfolio of tenements previously known as the Palm Springs Gold Project (now
8
9
ASX Announcement 9 September 2024 - WIN Completes Strongly Supported A$3.6 Million Placement
ASX Announcement 31 October 2024 – Settlement of $3.6m Placement
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
10
December 2024 Quarterly Report
31 January 2025
known as the Butchers Creek Project) from Meteoric Resources NL (“Meteoric”) (ASX:MEI) located 30km south-east
of Halls Creek in the Kimberley region of Western Australia (“Acquisition”) 10 11.
Consideration for the transaction at completion comprised the following:
I.
II.
$1,000,000 + GST in cash; and
WIN Shares to the value of $1,750,000 (calculated based on a deemed issue price per WIN Share of
$0.025) (“Consideration Shares”). The Consideration Shares are subject to a 12-month voluntary
escrow agreement from completion.
Consideration payable post settlement comprises:
I.
II.
$1,000,000 + GST payable to Meteoric 18 months after completion; and
An additional $1,250,000 + GST upon the production by the Company of 20,000 troy ounces of gold
(in aggregate) at the Project.
Research & Development Tax Refund
In early December 2024, WIN confirmed receipt of a Research and Development (R&D) Tax Incentive refund of
$855,000 related to the 2023/2024 financial year 12.
The R&D Tax Incentive is an Australian Government program to support Australian companies undertaking R&D
activities in Australia. Eligible companies can receive cash rebates of up to 48.5% of eligible expenditure on R&D
activities.
Recission of Divestment of Lithium Rights - Munda Gold Project
In October 2024, WIN advised that the divestment of Lithium Rights over a portion of Munda tenement, M15/87, to
Auric Mining Limited (ASX: AWJ) (Auric) has been rescinded by the mutual agreement of the parties 13. WIN has
refunded $30,000 (ex GST) to AWJ for the rescission of the Lithium Rights sale. As previously announced on 27 August
2024 14 the other divestments, including the Nickel Rights, has been completed and are unaffected. WIN received the
second consideration instalment of $300,000 (ex GST) from Auric in December with a final payment due from Auric
of $200,000 in June 2025.
As a result of the rescission there is no longer any requirement for the assignment of the royalty deed associated with
M15/87, the basis of dispute previously alleged by Estrella Resources Ltd (ASX:ESR) (Estrella).
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled $1,510,366
Details of exploration activities undertaken during the Quarter are as described above and in this section. Following
completion of the Butchers Creek drilling program in November exploration expenditure will reduce significantly
during the March 2025 quarter.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development activities
undertaken during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial percentage
interest held in those Tenements at the end of the Quarter is included in the Table at the end of this as Appendix 1.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter totalled
$137,524. The payments were in respect of salaries and superannuation paid to the executive director and directors’
fees payable to the non-executive directors.
ASX Announcement 28 August 2024 – WIN to Acquire High-Grade Gold Project
ASX Announcement 21 November 2024 – WIN Closes Acquisition of Butchers Creek Gold Project
12
ASX Announcement 9 December 2024 – WIN Receives $855k Research & Development Tax Refund
13
ASX Announcement 29 October 2024 – Rescission of divestment of Lithium Rights at Munda
14
ASX Announcement 27 August 2024 - Munda Agreement with Auric Mining Ltd concluded
10
11
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
11
December 2024 Quarterly Report
31 January 2025
Approved by: Board of WIN Metals Ltd
-ENDSFor further details please contact:
Media Enquiries:
Steve Norregaard
Fiona Marshall
Managing Director
White Noise Communications
WIN Metals Ltd
fiona@whitenoisecomms.com
steve@winmetals.com.au
0400 512 109
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
12
December 2024 Quarterly Report
31 January 2025
Competent Person Statement
The information in this announcement that relates to mineral resource estimates and exploration results is based on
information reviewed, collated and fairly represented by Mr William Stewart, who is a full-time employee of WIN
Metals Ltd. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining (member no 224335). Mr
Stewart has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears. Additionally, Mr Stewart confirms that the entity is not aware of any new information or data that materially
affects the information contained in the ASX releases referred to in this report.
Compliance Statement
The information in this report are extracted from the ASX Announcements listed in the table below, which are also
available on the Company’s website at www.winmetals.com.au and the ASX website www.asx.com under the code
WIN.
Number
Announcement Date
Company
1
25-Nov-24
WIN
Golden Crown North Delivers High Grades and Growth Potential
Announcement Title
2
7-Nov-24
WIN
Butchers Creek Gold Project Delivers High-Grade Results
3
10-Dec-24
WIN
Thick High-Grade Gold Intersected in Butchers Creek Infill Drilling
4
11-Sep-24
WIN
Butchers Creek Gold Project MRE and Exploration Results - Amended
5
23-Jul-24
WIN
Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN (Updated)
6
7-Mar-24
WIN
Standalone Mt Edwards Project Scoping Study
7
8-Nov-23
WIN
375% Growth in Faraday-Trainline Lithium Mineral Resource
8
9-Sep-24
WIN
WIN Completes Strongly Supported A$3.6 Million Placement
9
31-Oct-24
WIN
Settlement of $3.6m Placement
10
28-Aug-24
WIN
WIN to Acquire High-Grade Gold Project
11
21-Nov-24
WIN
WIN Closes Acquisition of Butchers Creek Gold Project
12
9-Dec-24
WIN
WIN Receives $855k Research & Development Tax Refund
13
29-Oct-24
WIN
Rescission of divestment of Lithium Rights at Munda
14
27-Aug-24
WIN
Munda Agreement with Auric Mining Ltd concluded
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the market announcements continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have not been
materially modified from the original market announcements.
Forward Looking Statement
Caution regarding Forward Looking Information. This document contains forward looking statements concerning
WIN Metals Ltd. Forward looking statements are not statements of historical fact and actual events and results may
differ materially from those described in the forward-looking statements as a result of a variety of risks, uncertainties,
and other factors. Forward looking statements in this document are based on WIN's beliefs, opinions and estimates
as of the dates the forward-looking statements are made, and no obligation is assumed to update forward looking
statements if these beliefs, opinions, or estimates should change or to reflect other future developments.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
13
December 2024 Quarterly Report
31 January 2025
Appendix 1 – Tenement Interests
The changes in the Company’s tenement interests during the Quarter and as at 31 December 2024 are as reflected in the
table below. The Company has an interest in the following projects and tenements in Western Australia:
Project Name
Licence Name
Beneficial Interest
Status
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
M15/87
M15/699
P15/6362
P15/6387
P15/6539
E15/1749
P15/6570
P15/6612
L15/0426
M15/45
M15/46
M15/48
M15/74
M15/75
M15/77
M15/78
M15/79
M15/80
M15/94
M15/96
M15/97
M15/99
M15/100
M15/101
M15/102
M15/103
M15/105
L15/102
M15/478
M15/633
M15/653
M15/693
M15/698
M15/1271
L15/254
E15/989
L15/280
E15/1505
E15/1507
E15/1576
E15/1583
P15/6092
E15/1553
L15/0478
E80/6085
E80/6086
E80/4856**
E80/4874**
E80/4976**
E80/5059**
E80/5584**
100% (*)
100% (#)
0% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100%
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (^)
100% (^)
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (^)
100% (^)
100%
100% (^)
100% (^)
100% (#)
100% (^)
100% (#)
100% (#)
100%
100% (^)
100%
100%
100%
100% (#)
100% (#)
100% (#)
100% (#)
100%
100%
100%
100%
100%
100%
100%
100%
Live
Live
Live
Live
Pending
Live
Live
Live
Pending
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Pending
Pending
Pending
Live
Live
Live
Live
Live
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
14
December 2024 Quarterly Report
31 January 2025
Project Name
Licence Name
Beneficial Interest
Status
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
Butchers Creek
E80/5660**
M80/0106**
M80/0315**
M80/0418**
P80/1839**
P80/1854**
P80/1855**
P80/1884**
100%
97%
97%
100%
100%
100%
100%
100%
Pending
Live
Live
Live
Live
Live
Live
Pending
*Part of Nickel and Lithium Mineral rights only, ^Nickel Mineral rights only, # No gold interest
>
new applications made during the Quarter.
** tenements acquired on the acquisition of Butchers Creek gold project from Meteoric Resources as announced on 21
November 2024.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX: WIN
15
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
WIN METALS LTD
ABN
Quarter ended (“current quarter”)
77 648 687 094
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 DECEMBER 2024
Current quarter
$A’000
Year to date (6
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs – net of project allocations
(157)
(361)
(e) administration and corporate costs
(370)
(583)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
8
16
1.5
Interest and other costs of finance paid
(1)
(2)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives –
R&D Tax incentive
856
856
1.8
Other (provide detail
Share your feedback
Discover