Highlights
•
Mineral Resource Estimate (MRE) for Widgie Townsite 2.50Mt @ 1.53% Ni for 38,260 nickel
tonnes.
•
Increased Confidence of resource with 69% of the nickel metal classified as Indicated
Resources for 26,460t of nickel.
•
Indicated contained nickel metal has increased 32% from 2021 MRE 1 update.
•
2024 MRE now includes Palladium + Platinum + Gold (3PGE). With Au (0.08g/t), Pt (0.10g/t) and
Pd (0.21g/t) for 0.39g/t 3PGE (equating to 6,350oz Au, 7,965oz Pt and 16,650oz Pd).
•
Mineralisation remains open at depth with prospective Eastern Limb untested.
•
71% of the 90,230t of contained nickel at the Widgie South Project Area is now classified as
Indicated Resources.
•
Total Mt Edwards Nickel Resource stands at 190,300t of contained nickel.
Widgie Nickel Managing Director and CEO, Mr Steve Norregaard, commented:
"The fourth of 6 resource revisions we have fortuitously been able to achieve prior to the Scoping Study,
represents a further success in building confidence with what was previously a 50% inferred resource.
We now have 69% of the contained nickel in the indicated category. Whilst nickel grade has marginally
reduced we are now better armed with no surprises in store with an underlying mining rationale adopted
in our Scoping Study able to accommodate all possible scenarios.”
“A modest reduction in overall contained metal is evidence of the rigour and the drilling effort we have
put into Widgie Townsite to get it right! Alongside Gillett and Widgie 3, over 90,000t of nickel metal is
now defined, which will underpin a restart of mining at Mt Edwards. We have removed ambiguity and
uncertainty which the company will otherwise be exposed to early in operational life. This outcome
highlights the importance of proper uncompromising technical work for which I am grateful to our
drilling contractors, employee’s expertise and the wise counsel from our geological consultants.”
“Widgie Townsite is now another high-quality resource in the company's portfolio, cementing the
positive prospects for the upcoming scoping study.”
“Widgie’s unique and highly strategic assemblage of 12 resources in close proximity make for a
wonderful opportunity to build a long life, high confidence, low risk mining operation in the medium
term.”
1
Neometals (ASX: NMT) - "Updated Widgie Townsite Nickel Mineral Resource at Mt Edwards" released 29 June 2021
1
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Widgie Townsite Nickel Deposit MRE Update
Widgie Nickel Ltd (ASX: WIN) (“Widgie” or “the Company”) is pleased to announce the updated MRE
for the Widgie Townsite (“WTS”) nickel deposit, reported in accordance with the 2012 JORC Code. Cube
Consulting Pty Ltd completed the MRE which has been reported above a cut-off grade of 0.7% Ni (Table
1).
Table 1: WTS 2024 MRE by Classification and Domain type
Domain
Tonnes
(kt)
Ni
(%)
Nickel
(t)
Cu
(%)
Co
(%)
Fe
(%)
As
(ppm)
MgO
(%)
3PGE
(ppm)
Massive
887
2.26
20,060
0.30
0.07
17.9
465
18.4
0.60
Disseminated
762
0.84
6,400
0.10
0.03
10.2
763
22.7
0.19
Sub-Total
1,649
1.60
26,460
0.21
0.05
14.3
603
20.4
0.41
Classification
Indicated
Massive
251
2.59
6,500
0.32
0.08
22.2
570
19.3
0.64
Disseminated
602
0.88
5,330
0.08
0.04
11.7
653
19.8
0.21
Sub-Total
853
1.38
11,800
0.15
0.05
14.8
629
19.7
0.34
TOTAL
2,502
1.53
38,260
0.19 0.05 14.5
Tonnes and grades have been rounded to reflect the relative uncertainty of the estimate.
612
20.2
0.39
Inferred
Table 2 and Figure 1 demonstrates the grade-tonnage relationship for the January 2024 WTS MRE at
varying cut-offs.
Ni %
Cut-off
0
0.4
0.5
0.6
0.7
0.8
0.9
1
1.5
2
Tonnes
(kt)
3,743
3,678
3,514
3,159
2,502
1,858
1,519
1,340
1,098
688
Ni
(%)
1.22
1.23
1.27
1.35
1.53
1.80
2.01
2.16
2.37
2.73
Cu
(%)
0.15
0.15
0.15
0.16
0.19
0.23
0.26
0.28
0.31
0.37
Co
(%)
0.04
0.04
0.04
0.05
0.05
0.06
0.07
0.07
0.08
0.09
Fe
(%)
13.0
13.1
13.3
13.7
14.5
15.8
17.0
17.7
18.9
21.2
As
(ppm)
536
543
560
588
612
631
646
627
452
428
MgO
(%)
20.9
20.8
20.6
20.4
20.2
19.5
18.9
18.6
18.7
17.5
3PGE
(ppm)
0.31
0.32
0.32
0.34
0.39
0.46
0.52
0.55
0.61
0.69
Table 2: Grade Tonnage for Combined Indicated and Inferred January 2024 WTS MRE.
Figure 1: Widgie Townsite grade-tonnage curve
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
A cut-off grade of 0.7% Ni has been chosen to reflect Reasonable Prospects for Eventual Economic
Extraction (RPEEE) of the MRE via conventional underground mining techniques.
Project Location
The WTS Nickel Deposit is located on Mining Lease M15/94, 1km south of Widgiemooltha. Access is via
the Coolgardie-Esperance Highway, with the turn-off to the mine site 63 km from Coolgardie (Figure 2).
WTS is part of the larger Widgie South Project Area at Mt Edwards which consists of Widgie 3, Gillett
and WTS nickel deposits shown in Figure 3 below. Widgie South in aggregate now contains 6.37Mt at
1.42% Ni for 90,230t of nickel over a strike length of 2.8km. Widgie holds the nickel mineral rights over
M15/94, representing a significant portion of the highly prospective Widgiemooltha Dome.
Figure 2: Regional Geology showing WTS Nickel Deposit and surrounding nickel deposits.
* Reported at 0.7% Ni cut-off. All other resources reported at 1% Ni cut-off
3
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Figure 3: Widgie South Project Area including Widgie 3, Gillett and WTS Nickel Deposits
Nickel Mineral Resources
Widgie Nickel’s total nickel MRE now stands at 13.16Mt at 1.45% Ni for 190,300t of nickel (Table 3). The
Widgie South Project Area (Widgie 3, Gillett and WTS deposits) contains 6.37Mt at 1.42% Ni for 90,230t
of nickel (Table 4) with 71% of nickel metal at Widgie South classified as Indicated resources. All
Mineral Resources except for at Widgie South and Armstrong have been reported at a 1% Ni cut-off
4
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
grade. The Mt Edwards Nickel Project Scoping Study currently underway supports a revised lower cutoff grade of 0.7% Ni which will be used for all forthcoming nickel resource estimate updates.
Table 3: Widgie Nickel’s Total Nickel Mineral Resources
Indicated
Deposit
Inferred
TOTAL Resources
Tonnes
(kt)
Nickel
(%)
Tonnes
(kt)
Nickel
(%)
Tonnes
(kt)
Nickel
(%)
Nickel
(t)
Widgie Townsite
Widgie 3
Gillett
Armstrong
132N
Munda
Cooke
Inco Boundary
McEwen
McEwen Hangingwall
Mt Edwards 26N
Zabel
1,649
512
2,267
949
34
1.60
272
1.94
853
222
871
10
426
508
154
464
1,133
1,916
871
53
1.38
1.95
1.16
1.04
1.90
1.85
1.30
1.20
1.35
1.36
1.43
2.04
2,502
734
3,138
959
460
508
154
464
1,133
1,916
871
325
1.53
1.53
1.30
1.44
2.00
1.85
1.30
1.20
1.35
1.36
1.43
1.96
38,260
11,200
40,770
13,820
9,050
9,400
2,000
5,590
15,340
26,110
12,400
6,360
TOTAL
5,683
1.48
7,480
1.42
13,164
1.45
190,300
1.34
1.35
1.45
2.90
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni cutoff.
Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
Table 4: Widgie South Project Area Nickel Mineral Resources
Indicated
Inferred
TOTAL Resources
Deposit
Tonnes
(kt)
Nickel
(%)
Tonnes
(kt)
Nickel
(%)
Tonnes
(kt)
Nickel
(%)
Nickel
(t)
Widgie Townsite
Widgie 3
Gillett
1,649
512
2,267
1.60
853
222
871
1.38
1.95
1.16
2,502
734
3,138
1.53
1.53
1.30
38,260
11,200
40,770
TOTAL
4,428
1,945
1.35
6,374
1.42
90,230
1.34
1.35
1.44
Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates
Geology and Mineralisation Interpretation
WTS is located on the northeast flank of the Widgiemooltha Dome within a sequence of intercalated
mafic and ultramafic rocks. At the deposit scale the main ultramafic formation (Widgiemooltha
Komatiite) consists of numerous flows of picritic to peridotitic composition with minor interflow cherty
sediments. The sequence generally strikes northwest southeast, faces east and dips at 70o to 80o to the
east. The footwall rocks underlying the ultramafic sequence consist of relatively undeformed Mt
Edwards Basalt. The sequence is folded with a syncline of Widgie South Fold Complex with
mineralisation found on the Western and Eastern Limbs and fold closure of the southerly plunging fold
nose as schematically illustrated in Figure 4 below.
5
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Figure 4: Schematic Geological Setting - Widgie South Fold Complex
The mineralisation comprises several lenses of massive to disseminated nickel sulphide
mineralisation occurring within the ultramafic unit generally off the basal contact (Figure 5). The
massive sulphide mineralisation is modelled as within or coincident to the disseminated domain
outlines. Six massive sulphide domains (one main and five minor) are on average 3.1m wide, but up to
10m at its widest section whilst the disseminated mineralisation domains (one main and eight minor)
are typically 7.5 m wide extending up to 17 m at its widest section.
6
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
7
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Figure 5: WTS deposit Geology and Mineralisation. Sections looking north-west
The overall nickel sulphide mineralisation strikes north-northwest for approximately 750m from a
depth of approximately 60m to 600m below surface. Mineralisation dips steeply between 70o to 80° to
the east with a moderate plunge to the south as illustrated in Figure 6 below.
Figure 6: WTS mineralisation (red) Long section looking southwest
8
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
The depth of weathering at WTS is approximately 60m with minor transported cover within situ regolith
profile potentially hosting a substantial body of oxide nickel mineralisation 2 that has not been reported
as part of this MRE update.
Drilling Techniques and Spacing
The drilling database for the WTS deposit consists of reverse circulation (RC), diamond drilling (DD) and
RC with DD tails (RC/DD). For the 2024 MRE, only RC, DD and RC/DD were used with a combined drill
spacing ranging from 20m × 20m in shallow areas out to approximately 50m × 100m at depth.
The January 2024 MRE update is supported by 79 DD holes, 72 RC holes and 28 RC/DD holes, for a total
of 50,791m of drilling. Recent drilling completed by Widgie during 2022 and 2023 at WTS includes 5 RC
holes and 28 RC/DD holes, for a total of 13,235m of drilling.
Figure 7: WTS Mineralisation (Blue wireframe disseminated, Red wireframe massive sulphide domains) and
Drilling (red trace 2022/2023) - looking southwest
2
Widgie Nickel (ASX:WIN) – “Widgie Townsite Grows Legs High Grade Nickel Hits” released 31 July 2023
9
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Sampling Techniques and Assaying Summary
RC drilling was sampled at 1m sample intervals with the sample passing through a cyclone mounted
cone splitter to provide a 2-3kg sample and the spoil collected in large plastic bags. Initial RC samples
were submitted as 4m composites comprising 4 equally sized scooped/speared sub-samples from the
large plastic bags combined into single calico sample bag which was then submitted for assay. If an
initial composite sample returned an assay >0.4% Ni, the constituent 1m calico samples were
submitted for assay and the individual results replacing the composite assay data.
Diamond core was sampled using 0.3m to 1.3m sample lengths with core halved and quartered using
an Almonte core saw. The ¼ core was bagged into calico sample bags and submitted for assay. The
remaining ¾ core was retained with ½ core submitted for metallurgical test work and remaining ¼ core
retained for reference. Submitted RC and diamond samples weighed a nominal 2kg to 3kg, some
weighing up to 5kg.
On receipt by a commercial registered laboratory the samples were initially weighed as received, then
dried in an oven at 105º C for up to 12 hours. Diamond core was initially crushed using a jaw crusher to
<2 mm particle size. Crushed core and RC samples greater than 3 kg were 50:50 riffle split, and the
excess discarded. The retained split was then placed in a LM5 mill and pulverised for 5 minutes to
achieve an 85% passing 75 µm, with 1:50 checked to ensure a suitable grind sized is achieved. A 300g
sub-sample was taken for analysis and the remainder retained.
A range of base metal certified reference material (CRM) was inserted at a rate of 1:20 into the sample
stream and blank samples introduced at a rate of 1:20 to test analytical accuracy and/or
contamination. RC field duplicates were taken at a rate of 1:50 within visibly mineralised samples to
test sample precision.
Estimation Methodology
Grade estimation included a combination of Ordinary Kriging (OK) of downhole composites within a
traditional 3D block model and OK of accumulation composites within a 2D plane block model.
The disseminated mineralisation and the largest massive sulphide domain were estimated with
downhole composites in a 3D block model given these domains exhibit sufficient width to allow some
internal selectivity across dip. Downhole composites of 1m length were extracted for Ni, Cu, Co, As,
MgO, S, Fe, Au, Pt, Pd and density. Exploratory data analysis (EDA) using a combination of methods
including spatial location, histograms, log probability plots and Coefficient of Variation (CV’s) was
conducted to determine the influence of extreme values. This influence was reduced by applying a
combination of high-grade capping and/or distance based grade cutting.
Variogram modelling was undertaken for the composited data for the main disseminated domain.
Kriging Neighbourhood Analysis (KNA) and the domain width and orientation were used to determine
the most appropriate block size. A rotated block model (toward 325° or -35° Surpac convention) with a
parent block size of 10m(Y) × 5m(X) × 10m(Z) was used for grade estimation and a sub-blocked size of
1.25m(Y) × 0.3125m(X) × 1.25m(Z) for volume resolution.
KNA was also used to determine other estimation parameters such as minimum and maximum
samples, discretisation and search distance to be used during estimation. Grade attributes (including
density) for the disseminated mineralisation were estimated by OK using dynamic anisotropy to honour
10
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
the undulating orientation. A two-pass search strategy was used with the first pass criteria including a
search radius for nickel of 70m and minimum and maximum number of samples of 6 and 18
respectively. For the single massive sulphide domain estimated in 3D, the domain was sub-divided into
north, central and deep areas to allow a south-easterly plunge to be honoured for the wider central and
deep areas and less obvious anisotropy in the narrower northern portion. The second pass strategy
used two times the primary search distance and the same minimum and maximum composites but for
nickel this represented only 1% of the total estimate.
The smaller massive sulphide mineralisation domains are typically narrow with no across dip
selectivity possible and therefore estimated by OK of accumulation variables within a 2D plane block
model. Drill-hole samples were length and density weight composited across the whole mineralised
interval creating a single composite per intersection. The intersection composite widths were
measured based on an east-west projection plane orientation. A triple accumulation variable for each
composite interval was calculated based on grade*width*density plus a double accumulation
(width*density). EDA and Quantitative Kriging Neighbourhood Analysis (QKNA) was completed for the
accumulation variables and minor grade caps were used to limit the influence of population outliers,
especially in sparsely populated areas.
Estimation by OK of the accumulation variables (triple and double) within a 2D plane block model
based on 20m(Y) × 20m(Z) parent cells was completed with minimum and maximum number of
samples required set as 4 and 8 respectively. A two-pass search strategy was used with the first pass
criteria including a search radius varying from 65m to 145m with almost 100% of the nickel estimate
completed in the first pass. The final block grade is back-calculated from the 2D kriged accumulation
with the grades then projected into the final 3D block model.
Two minor disseminated domains and two of the minor massive sulphide domains did not contain
sufficient sample data for OK estimation and were assigned the mean composite grade for each
domain.
Mineral Resource Classification
The Mineral Resource has been classified as a combination of Indicated and Inferred based on a
number of factors such as the confidence in geology, mineralogy, grade continuity, consideration of
the quality of the sampling and assay data and confidence in the grade estimation. Indicated resources
include areas where the drilling approximates 30m × 30m but does extend to 40m × 40m in some areas.
This represents the majority of modelled massive or disseminated sulphide. Inferred resources include
areas where the data density is consistently wider than a 30m × 30m spacing which is typically the
deeper areas of the deposit. The Mineral Resource classification for the massive and disseminated
mineralisation is outlined below with the drilling intersections for reference.
11
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Figure 8: WTS Classification for the Massive/Matrix Sulphide Mineralisation with Drillhole Intersections – Long
Section View looking South-West
12
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Figure 9: WTS Classification for the Disseminated Sulphide Mineralisation with Drillhole Intersections – Long
Section View looking South-West
Cut-off Grades and Reasonable Prospects of Eventual Economic Extraction (RPEEE)
The disseminated sulphide mineralisation is based on a combination of logging and the presence of
nickel typically greater than 0.5% Ni. The massive sulphide mineralisation is modelled within or
coincident to the disseminated outline and is based on a combination of criteria such as logging, nickel
typically greater than 1% Ni, sulphur typically greater than 3% or when the nickel and iron concentration
is greater than 15%.
The WTS MRE has been reported above a cut-off grade of 0.7% Ni for sulphide material only. This
reporting cut-off grade assumes medium scale underground mining to exploit the sulphide
mineralisation and is supported by a Mt Edwards Nickel Project Scoping Study being undertaken
currently.
13
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
Mining and Metallurgical Factors
The Mineral Resource mineralisation envelope uses a 0.5% Ni cut-off reflecting the on-set of sulphide
nickel mineralisation on the likelihood that the mined ore will be processed using conventional
sulphide concentration processes. There has been no historic mining at WTS however the Widgie 3
deposit (approximately 2km south of WTS) was mined via open pit and underground from 1988 to 1991.
The sulphide ore from Widgie 3 was trucked and processed at the Kambalda Nickel Concentrator
(KNC), demonstrating fresh sulphide ore from Widgie South can be successfully processed into a
sulphide concentrate using conventional flotation. Only the fresh rock zone of the WTS nickel sulphide
mineralisation has been reported in the Mineral Resource with all nickel oxide or transitional areas
excluded. Other than the assumption that future mining will be by underground mining methods
exclusively, no other mining and metallurgical factors or assumptions were used in compiling the
updated MRE.
Comparison to Previous Models
The historic 2021 WTS MRE was previously reported above a 1% Ni cut-off for a combined Indicated
and Inferred Mineral Resource of 2,476kt @ 1.60% Ni for 39,300t of nickel. For comparison purposes
the 2021 MRE includes 2,726kt @ 1.54% Ni for 41,970t of nickel when reported above a 0.7% Ni cut-off.
Above a 0.7% Ni cut-off the updated January 2024 MRE reports 2,502kt @ 1.53% Ni for 38,260t of nickel
as summarised in Table 5 below. The overall difference between the 2021 and 2024 MRE’s above a 0.7%
Ni cut-off is an 8% decrease in reported tonnes at approximately the same nickel grade for a 9%
decrease in contained nickel metal. However, while the 2021 MRE was approximately 50% Indicated,
the addition of infill drilling completed by Widgie, has increased the proportion of Indicated nickel metal
to 69%.
Table 5: Comparison of 2021 to 2024 WTS MRE (0.7% Ni cut off)
Model
Classification
2021 MRE
2024 MRE
Actual Difference
Relative Difference
Indicated
Inferred
Total
Indicated
Inferred
Total
Indicated
Inferred
Total
Total
Tonnes
(kt)
1,293
1,433
2,726
1,649
853
2,502
356
-580
-224
-8%
Ni
(%)
1.63
1.46
1.54
1.60
1.38
1.53
-0.03
-0.07
-0.01
-1%
Ni
(t)
21,100
20,870
41,970
26,460
11,800
38,260
5,360
-9,060
-3,710
-9%
As
(ppm)
575
704
643
603
629
612
28
-75
-31
-5%
There are two key factors that have contributed to the variance between the two models. These include:
1. Interpretation/Estimation - the 2024 geological models including lithology, weathering and
mineralisation interpretations were reviewed and all completed from first principals. The
overall lithology and weathering models have not changed materially between the 2021 and
2024 MRE’s, however there has been a significant improvement to the mineralisation model
which now includes the separate modelling of higher grade massive/matrix mineralisation from
the surrounding lower grade disseminated mineralisation. The grade estimation in the 2024
MRE has used hard boundaries between the two mineralisation styles resulting in a final grade
14
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
distribution which closely honours the informing drilling data and expected insitu distribution.
In comparison, the 2021 MRE was based on approximate 0.5% nickel grade envelopes
(combined massive, matrix and disseminated sulphides) to represent the mineralisation
domains. The 2021 grade estimate included mixed population data and resulted in an overly
smooth representation of the grade distribution. An example of the difference between the two
MRE’s is shown below in Figure 10.
Figure 10: Widgie Townsite Comparison between 2021 (left) and 2024 (right) MRE. Plan View at 55mRl +/- 20m
2. Infill Drilling - recent drilling completed by Widgie mostly targeted existing areas of Inferred
material contained in the 2021 MRE. In some instances, the infill drilling resulted in reductions
in volume and/or grade to areas of previously Inferred material.
Next Steps for Widgie Townsite
This MRE update will inform the pending Scoping Study for a multi-mine operation to support a
standalone nickel concentrator. Additional drilling will be required to convert any areas of outstanding
lower confidence Inferred material to Indicated. This will allow for subsequent conversion of this
material into a Mining Reserve upon confirmation of economic viability. Further drilling at depth below
existing mineralisation represents an excellent high confidence target to add additional resources.
Competent Persons Statements
The information in this report that relates to the Mineral Resource for the WTS deposit was prepared by
Mr Mark Zammit, who is a full-time employee of Cube Consulting Pty Ltd (Cube) and is a Member of the
AIG. Mr Zammit has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which is an undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Zammit consents to the inclusion in this announcement of
the matters based on his information in the form and context in which it appears.
15
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
Widgie Townsite Mineral Resource Update
29 January 2024
The information in this announcement that relates to exploration results and sampling techniques is
based on and fairly represents information and supporting documentation compiled by Mr William
Stewart, who is a full-time employee of Widgie Nickel Limited. Mr Stewart is a member of the Australian
Institute of Metallurgy and Mining (member no 224335) and Australian Institute of Geoscientists
(member no 4982). Mr Stewart has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
Forward Looking Statements
This announcement includes forward-looking statements that are only predictions and are subject to
known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of Widgie Nickel Limited, the directors and the Company’s management. Such
forward-looking statements are not guarantees of future performance.
Examples of forward-looking statements used in this announcement include use of the words ‘may’,
‘could’, ‘believes’, ’estimates’, ‘targets’, ’expects’, or ‘intend’ and other similar words that involve risks
and uncertainties. These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions that, as at the date of
announcement, are expected to take place.
Actual values, results, interpretations or events may be materially different to those expressed or
implied in this announcement. Given these uncertainties, recipients are cautioned not to place
reliance on forward-looking statements in the announcement as they speak only at the date of issue of
this announcement. Subject to any continuing obligations under applicable law and the ASX Listing
Rules, Widgie Nickel Limited does not undertake any obligation to update or revise any information or
any of the forward-looking statements in this announcement or any changes in events, conditions or
circumstances on which any such forward-looking statement is based.
This announcement has been prepared by Widgie Nickel Limited. The document contains background
Information about Widgie Nickel Limited current at the date of this announcement. The announcement
is in summary form and does not purport to be all inclusive or complete. Recipients should conduct
their own investigations and perform their own analysis in order to satisfy themselves as to the
accuracy and completeness of the information, statements and opinions contained in this
announcement.
The announcement is for information purposes only. Neither this announcement nor the information
contained in it constitutes an offer, i
Share your feedback
Discover