Investor Presentation Kalgoorlie - August 2024
Released
Released
Announcement PDF
ASX: WIN
Critical Minerals
for a Cleaner Future
August 2024
WINMETALS.COM.AU
Important Notice and Disclaimer
This presentation has been prepared by WIN Metals Limited (“WIN” or the “Company”) to assist in informing interested parties about the
Company. It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to
make an offer or invitation with respect to securities in the Company. No agreement to subscribe for securities in the Company will be entered into
on the basis of this presentation.
Summary information
This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part,
for any purpose without the prior written approval of WIN Metals Limited . The material contained in this presentation is for information
purposes only. This presentation is not an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the
Company and neither this presentation nor anything contained in it shall form the basis of any contract or commitment.
This presentation may not be distributed or released in the United States. Securities may not be offered or sold in the United States unless such
securities are registered under the U.S. Securities Act of 1933, as amended (“U.S. Securities Act”) or in a transaction exempt from, or not
subject to, the registration requirements of the U.S. Securities Act and any other applicable securities laws. Each institution or person that reviews
this presentation will be deemed to represent that each such institution or person is not in the United States.
The distribution of this presentation may be restricted by law. Persons who come into possession of this presentation should seek advice and
observe any such restrictions. Any failure to comply with such restrictions may constitute a violation of applicable securities laws.
Not financial product advice
No liability
This presentation has been prepared by WIN Metals Limited based on information currently available to it. No representation or warranty, express
or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
presentation.
Recipients should carry out their own investigations and analysis of the Company and verify the accuracy, reliability and completeness of the
information contained in this presentation or any other form of communication to which the recipient is permitted access in the course of
evaluating any investment in the Company.
To the maximum extent permitted by law, none of WIN Metals Limited or its subsidiaries or affiliates or the directors, employees, agents,
representatives or advisers of any such party, nor any other person accepts any liability for any loss arising from the use of or reliance on this
presentation or its contents or otherwise arising in connection with it, including without limitation, any liability arising from fault or negligence on
the part of WIN Metals Limited or its subsidiaries or affiliates or the directors, employees, agents, representatives or advisers of any such
party.
Financial data
All figures in the presentation are Australian dollars ($ or A$) unless stated otherwise. A number of figures, amounts, percentages, estimates,
calculations of value and fractions in this presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures
may differ from the figures set out in this presentation.
Reliance should not be placed on the information or opinions contained in this presentation. This presentation is for information purposes only
and is not financial product or investment advice, nor a recommendation to acquire securities in the Company (or any interest in Company
securities). It has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making any
investment decision, prospective investors should consider the appropriateness of the information having regard to their own objectives, financial
situation and needs and seek legal and taxation advice appropriate to their jurisdiction.
Photographs and diagrams
Past performance
Compliance Statement
Past performance information given in this presentation is given for illustrative purposes only and should not be relied upon as an indication of
(and gives no guidance as to) future performance.
Forward-looking information
This presentation contains certain forward-looking statements with respect to the operations and business of the Company and certain plans and
objectives of the management of the Company. Forward looking statements include those containing such words as "anticipate",
"estimates", "forecasts", "should", "could", "may", "intends", "will", "expects", "plans" or similar expressions. Such forward-looking statements are
not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of
which are beyond the control of the Company. It is believed that the expectations reflected in these statements are reasonable but they may be
affected by a range of variables and changes in underlying assumptions which could cause actual results or trends to differ materially.
WIN Metals Limited does not make any representation or warranty as to the accuracy of such statements or assumptions.
ASX: WIN
Photographs and diagrams in the presentation are for illustration purposes only and should not be interpreted to mean that any person shown in
them endorses this presentation or its contents or that the assets shown in them are owned by WIN Metals Limited. Diagrams and maps
used in this presentation are illustrative only and may not be drawn to scale. Unless otherwise stated, all data contained in charts, graphs and
tables is based on information available as at the date of this presentation.
The information in this presentation that relates to estimates of nickel Mineral Resources for the Mt Edwards Project has been extracted from the
Company’s ASX Announcements, with the most recent statement from the announcement titled “Munda Agreement with Auric Mining Ltd yields
$1.2m+ for WIN” dated 23 July 2024.
The information in this presentation that relates to estimates of lithium Mineral Resources for the Mt Edwards Project has been extracted from the
Company’s ASX Announcement titled “375% Growth in Faraday-Trainline Lithium Mineral Resource” dated 8 November 2023.
The information in this presentation relating to the Nickel Scoping Study has been extracted from the Company’s ASX Announcement of the 7
March 2024 titled “Standalone Mt Edwards Project Scoping Study”
The information in this presentation that relates to exploration and evaluation results for the Mt Edwards Project have been extracted from the
Company’s previous ASX Announcements as referenced in this Presentation. Copies of these announcements are also available on the
Company’s website at www.widgienickel.com.au
WIN Metals Limited confirms that it is not aware of any new information or data that materially affects the information included in the ASX market
announcements, and in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the relevant ASX market announcements continue to apply and have not materially changed. WIN Metals Limited confirms that the
form and context in which the Competent Persons’ findings are presented have not been materially modified from the relevant ASX market
announcements.
2
Developing WA
Nickel and Lithium
240km2 granted mining leases covering the
highly prolific Widgiemooltha Dome, with
exposure to two critical minerals.
Mt Edwards Nickel Project
Significant resource, upgraded through
drilling now subject to Scoping Study
contemplating development of
standalone concentrator.
Faraday-Trainline Lithium Project
Shovel ready project with upside
potential. Potential to provide financial
optionality when lithium pricing recovers.
Met testing to confirm development
pathway.
Mineral Resources Mt Marion Lithium Operation: MIN ASX Announcements 22/09/2023: Mineral Resources and Ore Reserve Update, 21/02/2024 Mt
Marion underground Mineral Resource Update
Develop Dome North Deposit MRE: ESS ASX Announcement 22/12/2022: Dome North Mineral Resource Estimate Upgrade
Mineral Resources Bald Hill Lithium Mine: TAW ASX Announcement 06/06/2018: Lithium Ore Reserve Increase at Bald Hill
ASX: WIN
3
Battery Metals Outlook
Lithium and nickel long-term market balances
Current price environment
remains challenging for
both Lithium and Nickel,
however long-term market
imbalance remains
ASX: WIN
B e n c hmark M in eral In te lligence, L ith ium, N ic ke l an d Cobalt F or e casts, Q2 2 0 2 3
4
240km2 WIN Strategic Portfolio
Mt Edwards Nickel Project (100%)
• MRE: 13.04Mt @ 1.45% for 188,160 tonnes Ni
• 12 separate nickel sulphide deposits, subject to a program of
ongoing upgrades on Widgie infill drilling.
• Proven Nickel Production History.
Tenure hosts 4 historical mines that have produced 31kt of nickel from
1980 to 2008, and 12 confirmed deposits on granted mining leases
• Byproduct value to be unlocked: Cu, Co, Pd, Pt & Au.
Faraday-Trainline Lithium Project (100%)
• Lithium discovery October 2022.
• Faraday-Trainline MRE: 1.96Mt @ 0.69% Li2O
• High grade near surface zone of 373kt @1.00% Li2O
• Measured & Indicated 1.57Mt @ 0.71% Li2O
• Expansion potential: open along strike and down dip.
• Fully permitted, ready to start digging.
Mineral Resources Mt Marion Lithium Operation: MIN ASX Announcements 22/09/2023: Mineral Resources and Ore Reserve Update, 21/02/2024 Mt
Marion underground Mineral Resource Update
Develop Dome North Deposit MRE: ESS ASX Announcement 22/12/2022: Dome North Mineral Resource Estimate Upgrade
Mineral Resources Bald Hill Lithium Mine: TAW ASX Announcement 06/06/2018: Lithium Ore Reserve Increase at Bald Hill
ASX: WIN
5
Mt Edwards Nickel Project
12 Separate Nickel Deposits Positioned to Drive Value
• Unique occurrence of 12 deposits on 15 km of prospective strike.
• Strategically significant resource in a region of numerous small deposits
Mt Edwards Project
with highly fragmented ownership.
• WIN has drilled 106,000m to expand and improve resource base since listing.
Indicated
TOTAL Resources
Inferred
Deposit
Tonne
(kt)
Nickel
(%)
Tonne
(kt)
Nickel
(%)
Tonne
(kt)
Nickel
(%)
Nickel
Tonnes
Gillett
2,267
1.35
871
1.16
3,138
1.30
40,770
Widgie 3
Widgie Townsite
512
1,649
1.34
1.60
222
853
1.95
1.38
734
2,502
1.53
1.53
11,200
38,260
Armstrong
949
1.45
10
1.04
959
1.44
13,820
132N
34
2.9
426
1.90
460
2.00
9,050
Munda
381
1.91
508
1.91
7,260
Cooke
154
1.30
154
1.30
2,003
Inco Boundary
464
1.20
464
1.20
5,590
McEwen
1,133
1.35
1,133
1.35
15,340
McEwen Hangingwall
1,916
1.36
1,916
1.36
26,110
Mt Edwards 26N
871
1.43
871
1.43
12,400
Zabel
272
1.9
53
2.04
325
1.96
6,360
TOTAL
5,693
1.48
7,355
1.42
13,038
1.45
188,160
Munda
7,260t Ni
Above a 1% Ni cut-off, except Widgie 3, Gillett, Widgie Townsite and Armstrong, reported at 0.7% Ni cut-off
ASX: WIN
6
Mt Edwards Nickel Project
Standalone Nickel Concentrator
Contemplated in Scoping Study
ASX: WIN
Significant cost
efficiencies due to
economies of scale
Plant customised
to WIN Ores to
maximise value
First optional step
towards vertical
integration
Increased payability
via access to
multiple customers.
Customised product.
Minimised
owner costs
(transport, milling)
Exploration upside
potential – increase
scale and confidence
7
Mt Edwards Nickel Project
Mt Edwards Nickel Project
Scoping Study Key Outcomes
Free Cash Flow
Total Net Revenue
Total Capital Costs
$402m
$1.65bn
$433m
Unit Operating Costs (C1)
Unit All in Sustaining Costs
Pre-Production Capex
$161.01/t
$195.92/t
$257m
NPV
IRR
Production Life
$197.4m
22.9%
6 years
ASX announcement – 7/03/2024 Standalone Mt Edwards Project Scoping Study. Study assumes base case Ni price $24,000/t US @ exchange rate of 0.65USD/AUD
ASX: WIN
8
Mt Edwards Nickel Project
Mining Sequence Demonstrates
High Rates of Extraction
Bottom-up mining approach with
backfill to maximise ore extraction and
minimise dilution
Mining to occur at shallow depths, low
capex, good ground conditions and low
water ingress make for cost effective
productive mining
Production target- 5.05Mt @1.56%
Widgie 3 Deposit Stoping Sequence
Estimated production target:
536kt @ 1.55% Ni
ASX: WIN
Long Section Facing East Showing Widgie 3 Mining Sequence
North
250m
South
9
Mt Edwards Nickel Project
Flowsheet Configuration
Mt Edwards Nickel Concentrator Flowsheet - 800,000tpa producing 10,380t Ni pa over 6 years in 103,000t concentrate pa.
ASX: WIN
10
Mt Edwards Nickel Project
Mt Edwards
Nickel Project:
The Opportunity
Capital and operating cost
reduction through potential
expansion of output and/or mine
life, economies of scale and
second hand capex
ASX: WIN
Mine life extension and
Resource Growth 7 additional
deposits to consider &
mineralisation remains open
Mining Costs may be reduced
through competitive tender
process or achievement of
higher development rates
Metallurgical testwork
and process improvements
to further enhance outcomes
Product payability and offtake.
Customised concentrate
specification can attract a premium,
potential for green premium
Permitting and approvals
process to start now, to avoid
delays seen elsewhere in WA
Downstream processing to be
evaluated, potential to reduce
ex mine gate costs and further
increase payabilities
11
Faraday-Trainline Lithium Project
Faraday-Trainline Offers Development Optionality
•
Shovel ready - Mining approvals granted (located on Mining Lease M15/102)
•
Flowsheet development testwork has achieved 81.0% lithium recovery to a 6.3% Li2O
flotation concentrate*. Repeatability testing on foot.
•
PFS in progress to confirm appropriate development pathway
•
Lithium drill investment since Faraday discovery - 18,000m
Deposit
Faraday
Trainline
Total
Classification
Tonnes (t)
Li2O (%)
Fe (%)
Li2O (t)
Measured
550,000
0.75
1.24
4,100
Indicated
250,000
0.66
1.73
1,600
Inferred
220,000
0.61
2.22
1,400
Sub-total
1,020,000
0.70
1.57
7,100
Measured
-
-
-
-
Indicated
780,000
0.69
1.59
5,300
Inferred
160,000
0.63
1.66
1,000
Sub Total
940,000
0.68
1.60
6,300
Measured
550,000
0.75
1.24
4,100
Indicated
1,020,000
0.68
1.62
7,000
Inferred
390,000
0.62
1.98
2,400
Total
1,960,000
0.69
1.59
13,500
Faraday and Trainline Drill Density (red drill collars) with MRE block model
ASX announcement 8/11/2023 – 375% Mineral Resource Growth at Faraday-Trainline Lithium Project
ASX announcement – 2/08/2023 Faraday Metallurgical Testwork- Excellent Flotation Response
November 2023 Lithium MRE by classification*
ASX: WIN
12
Lithium Expansion Potential
High grade expansion potential
Farson, Gemini, Atomic 3 & Voyager
•
•
New search area (Farson)-Visible spodumene supported by high grade rock chip samples including:
•
2.52% Li2O , 1.53% Li2O, 1.31% Li2O, &1.28% Li2O
Farson
•
1.87% Li2O & 1.69% Li2O
Gemini
•
4.11% Li2O & 2.91% Li2O
Atomic 3
•
3.29% Li2O & 2.41% Li2O
Voyager
Gemini to Voyager Lithium trend is a series of lithium bearing pegmatite
dyke swarms. Potential for substantial feeder system.
Pegmatite samples from Farson showing
red-orange spodumene under UV light
ASX: WIN
Pegmatite samples from Gemini showing
Coarse green spodumene crystals
ASX Announcement – 12/02/2024 – High grade lithium discovery at Farson ASX Announcement- 27/2/2024- New Gemini Lithium Prospect Extends Lithium trend to 1.2km
13
WIN is Unlocking Significant Value
across two in-demand Critical Minerals in a
Tier 1 Mining Jurisdiction
Lithium optionality
Established shovel ready resource
on granted mining lease.
Nickel & Lithium Projects
Permitting/PFS to come, as sentiment
turns positive
Growth opportunity
Further Lithium & Nickel
Resource upside
Shareholder value is key
Preserving value in current assets,
and unlocking value through
diversification
Key Dates Ahead:
ASX: WIN
2024
Lithium exploration
Lithium Feasibility Study
2025
Downstream options
Nickel PFS
14
Corporate Summary
WIN
ASX
$0.024c
Share Price
31 July 2024
Major Shareholders
Market Cap
$1.7M
Cash
30 June 2024
44.1M
Total Options
and PRs on Issue
319.1M
Shares on Issue
Board & Management
Andrew Parker Non-Executive Chair
Steve Norregaard Managing Director & CEO
Corporate Advisory & Law
Mining Engineer
Felicity Repacholi Non-Executive Director
Scott Perry Non-Executive Director
4.35%
Exploration and Development Geologist
Process Engineer
39.36%
Graeme Scott Company Secretary & CFO
Will Stewart Geology Manager
Virtue Investments Corp
9.23%
Farjoy
4.74%
D Reed
TOP 20
ASX: WIN
$7.7M
15
Mt Edwards Nickel Project
Social
Critical Minerals Project
GHG Emissions
Eligible for Federal
government support,
Critical Minerals funding,
US reciprocity
Low Nickel tonnes intensity
Scope 1: 1.74t CO2e /t
Scope 2: 4.5 t CO2e /t
ESG CREDENTIALS
Downstream strategy is
key to reducing third
party emissions
Heritage and Native Title
Agreements in place
Regular surveys and
consultations
Zero major health and
safety incidents in FY23
Zero regulatory or compliance
breaches in FY23
Scope 3 Emissions
Environmental
Onsite processing of
nickel sulphate
Battery and solar in camp
Production of battery
precursor material NCM
No rare species or
environmentally sensitive areas
100% rehabilitation of disturbed land
ASX: WIN
16
Level 4, 220 St Georges Tce, Perth, WA 6000
+61 8 63817250
info@winmetals.com.au
ASX: WIN
WINMETALS.COM.AU
ASX: WIN
WIDGIENICKEL.COM.AU
17
Appendix: Key Nickel Scoping Study Outcomes
PARAMETER
UNIT
PROJECT TOTAL
KEY ASSUMPTIONS
PARAMETER
UNIT
PROJECT TOTAL
FINANCIALS
Nickel Price
US$/tonne
24,000
Total Operating Costs
AUD$
812,719,828
Diesel Price
US$/litre
1.20
Total Capital Costs
AUD$
433,227,055
Exchange Rate
AUD:USD
0.65
Pre Production Capex
AUD$
257,029,982
Discount Rate
%
8.0
Max Negative Cashflow (Month 16)
AUD$
-269,209,468
Concentrator Nickel Recovery (Ni)
%
79.0
Total Past Mine Gate Costs
AUD$
230,232,929
Offtake Nickel Payability
%
80.0
(Con Transport, Offtake, Royalties)
Unit Power Cost
AUD$/kWhr
0.20
Total Net Revenue (Minus Past Mine Gate Costs)
AUD$
1,647,956,772
Total Concentrate Transport Costs
AUD$/wmt
110.97
Total Cumulative Cashflow (Pre Tax)
AUD$
402,009,886
Discounted Cashflow (@ 8%) - NPV8
AUD$
197,378,393
%
22.9
Unit Operating Costs (C1)
AUD$/t milled
161.01
Unit Mining Operating Costs (Inc Power)
AUD$/t mined
97.16
Unit Milling Operating Costs (Inc Power)
AUD$/t milled
33.98
Unit All in Sustaining Costs
AUD$/t milled
195.92
Unit All in Costs
AUD$/t milled
246.84
Unit Nickel Operating Production Cost
(Excluded Past Mine Gate Costs)
US$/lb in Con
3.67
AUD$/t in Con
12,432
Comparative C1 Nickel Production Cost
US$/lb Payable
5.39
PRODUCTION
Life of Mine
Months
94
Total Ore Mined
Tonnes
5,047,555
Total Jumbo Development
metres
48,734
Total Truck Material Movement
tkm
19,171,620
Total Ore Milled
dmt
5,047,555
Average Feed Grade
% Ni
1.56
Concentrate Produced
dmt
616,668
Concentrate Grade
% Ni
10.1
Contained Nickel
Tonnes
62,283
Internal Rate of Return
UNIT COSTS
ASX announcement 07/03/2024 – Standalone Mt Edwards Project Scoping Study Highlights Nickel Potential
ASX: WIN
18