Widgie Nickel Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
ASX:WIN
31 January 2024
December 2023 Quarterly Report
Highlights
•
•
•
•
•
375% Growth in Faraday-Trainline Lithium Mineral Resource Estimate (MRE) to 1.96Mt @ 0.69% Li2O,
including:
•
High-grade, near surface zone of 373kt @ 1.00% Li2O (0.85% Li2O cut-off)
•
Measured and Indicated Mineral Resources total 1.57Mt @ 0.71% Li2O
•
Maiden MRE for Trainline lithium deposit of 0.94Mt @ 0.68% Li2O
Trainline Lithium Prospect infill drilling returns high-grade mineralisation, including:
•
9m @ 1.15% Li2O (23MERC338)
•
9m @ 1.01% Li2O (23MERC339)
Armstrong Nickel Deposit updated MRE to 959Kt @ 1.4% Ni for 13,820 nickel tonnes, including:
•
Palladium + Platinum + Gold (3PGE) endowment with Au (0.16g/t), Pt (0.16g/t) and Pd (0.35g/t)
0.67g/t 3PGE (contained metal equating to 4,900oz Au, 5,020oz Pt and 10,710oz Pd)
•
19% increase in Indicated Resources to 13,720 nickel tonnes versus the 2022 MRE
•
99% of sulphide resource is now in the Indicated Resource Category
132N Nickel Deposit infill drilling confirmed high-grade nickel mineralisation below the historic open pit:
•
Mineralisation remains open at depth and the structure’s lower channel flank remains
unconstrained
•
Geological modelling is underway with updated Mineral Resource Estimate to be completed in
early 2024
Subsequent to the end of the Quarter three further MRE updates were released; Gillett, Widgie 3 and
Widgie Townsite
Widgie Nickel Ltd (ASX: WIN) (“Widgie” or “the Company”) is pleased to present its Quarterly Activities Report for
the period ended 31 December 2023.
Widgie Nickel Managing Director and CEO, Mr Steve Norregaard, commented:
"I am very pleased with the solid progress we made in the December Quarter as we continue to develop our
understanding and confidence in our deposits. The team has delivered two mineral resource upgrades within the
period, which is testament to the hard work being put in on site.
“We further expanded Widgie’s total lithium resource, improving confidence at Faraday and defining the maiden
resource at Trainline. There is plenty of work to be done on the ground and we are focused on positioning the
Company for value to our shareholders.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
1
December 2023 Quarterly Activities Report
31 January 2024
“At the Mt Edwards Nickel Project, we upgraded the Armstrong MRE and have subsequent to the end of the quarter
announced updates to Gillett, Widgie 3 and Widgie Townsite. These updates will inform the Scoping Study, where
we aim to demonstrate that Widgie’s resource base is able to support a standalone nickel processing operation.”
Faraday-Trainline Lithium Project
The Faraday-Trainline Lithium Project area is located on Mining Lease M15/102, 4km west north-west of the
Widgiemooltha Township. Access is via the Coolgardie-Norseman Rd, 63km south of Coolgardie. Faraday and
Trainline are central to Widgie’s Mt Edwards Project, covering a significant land holding within the “Lithium
Corridor” between Mt Marion to the north, Pioneer Dome to the south and Bald Hill to the east (Figure 1).
Figure 1: Regional Geology showing the Faraday - Trainline Lithium Project location,
and surrounding lithium projects
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
2
December 2023 Quarterly Activities Report
31 January 2024
Faraday-Trainline Lithium Project MRE Update
During the December Quarter, the Company was pleased to announce the updated Mineral Resource Estimate
(MRE) for Faraday coupled with a maiden MRE for the Trainline Lithium Deposit, reported in accordance with the
2012 JORC Code 1.
Cube Consulting completed the MRE which has been reported above a cut-off grade of 0.30% Li2O to a depth of
310mRL (65m below surface) and 0.50% Li2O below 310mRL to 250mRL (Table 1).
Table 1: Widgie Nickel Total Lithium MRE by classification and deposit (November 2023)
Deposit
Faraday
Trainline
Total
Classification
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Sub Total
Measured
Indicated
Inferred
Total
Tonnes
(t)
550,000
250,000
220,000
1,020,000
780,000
160,000
940,000
550,000
1,020,000
390,000
1,960,000
Li2O
(%)
0.75
0.66
0.61
0.70
0.69
0.63
0.68
0.75
0.68
0.62
0.69
Fe
(%)
1.24
1.73
2.22
1.57
1.59
1.66
1.60
1.24
1.62
1.98
1.59
Li2O
(t)
4,100
1,600
1,400
7,100
5,300
1,000
6,300
4,100
7,000
2,400
13,500
The November 2023 Faraday-Trainline MRE was informed by 17,277m of Reverse Circulation(RC) drilling (419 holes)
and 460m of diamond drilling (DD) (13 holes) carried out in late 2022 and 2023 (Figure 2).
Approximately 1,000kg of representative lithium-bearing diamond core was collected for variability test-work to
determine mineralogy and metallurgical characteristics across the entire deposit, seeking to confirm the ability to
produce a saleable concentrate, as previously reported 2.
A cut-off grade of 0.30% Li2O was chosen to reflect Reasonable Prospects for Eventual Economic Extraction
(RPEEE) of the MRE assuming shallow open pit mining above 310mRL. An elevated cut-off grade of 0.50% was
applied to material below 310mRl to the bottom of the mineral resource at a vertical depth of 130m to reflect
increased mining costs associated with potential underground mining or deep open pit mining. This is aligned with
cut-off grades applied for the reporting of lithium mineral resources hosted in spodumene-rich pegmatites currently
being mined elsewhere in Australia.
1
2
ASX Announcement 8 November 2023 – 375% Growth in Faraday-Trainline Lithium Mineral Resource
ASX Announcement 29 March 2023 – Maiden Resource Proves up Faraday DSO Starter Pit Opportunity
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
3
December 2023 Quarterly Activities Report
31 January 2024
Figure 2: Faraday-Trainline block model displaying Li2O % and drilling (black traces) – Oblique view looking north-east
The Company updated the maiden MRE for Faraday after assay results suggested a discrepancy between diamond
and RC results received over previous campaigns. An internal investigation concluded the initial assaying
methodology recommended by the laboratory was inappropriate for Faraday mineralisation, and a comprehensive
re-assaying program of 3,371 samples of mineralisation confirmed a positive bias using a fusion method 3.
Infill Drilling Delivers High-Grade Lithium at Trainline
During the Quarter, the Company was pleased to release results of infill reverse circulation (RC) drilling at the
Trainline Prospect immediately north of the Faraday Lithium Deposit 4.
The Trainline lithium prospect is located approximately 75m to the north of Faraday Lithium Deposit (Figure 3),
which are separated by a cross cutting east-west dolerite dyke that truncates the pegmatite bodies to the north and
south.
The stacked pegmatites are intruded into the steeply dipping mafic/ultramafic country rock. The pegmatites dip
shallowly to the west at 20o and are found to be outcropping in places but generally under a thin layer of cover with
widths varying from 1m to 15m in thickness, with greater thicknesses observed where the pegmatite exists within
an ultramafic host. The pegmatites have a combined strike length of 800m north-south and remain open at depth.
This RC infill drilling campaign was designed to reduce the drill spacing from 80m by 80m drilling to 40m by 40m
focused on the higher-grade core (Figure 3). The infill drilling confirmed the continuity of the lithium bearing
pegmatite returning high-grade results above 1% Li2O, including 9m @ 1.15% Li2O (23MERC338) and 9m @ 1.01%
Li2O (23MERC339).
3
4
ASX Announcement 26 October 2023 – Material Uplift in Faraday Lithium Grades
ASX Announcement 2 October 2023 – Drilling Delivers High-grade Lithium at Trainline
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
4
December 2023 Quarterly Activities Report
31 January 2024
A’
A
Figure 3: Plan view of recent Trainline (blue wireframe) lithium infill drilling
and Faraday Mineral resource to the south
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
5
December 2023 Quarterly Activities Report
31 January 2024
Next steps for Faraday-Trainline Lithium Project
Future exploration work will focus on defining potential stacked pegmatites at depth within the favourable
ultramafic unit below defined mineralisation in addition to extending the known mineralisation down dip to the
west.
Infill drilling to 20m x 20m at Trainline to be completed to provide increased level of confidence in the geology and
mineral resource.
Desktop studies have commenced on the wider exploration potential for Lithium within Widgie’s tenure. This will
be a major focus for the exploration team going into 2024.
Variability testing of mineralisation at both deposits to confirm overall metallurgical characteristics is underway to
provide confirmation as to the most appropriate processing route.
Mine design for an expanded operation will now be undertaken to determine ultimate pit limits and an optimised
exploitation strategy.
Active discussions with prospective offtake parties continued to advance for the Faraday-Trainline Lithium
Project 5. Given the prevailing lower lithium prices these further discussions have now paused.
5
ASX Announcement 18 December 2023 – Mt Edwards Scoping Study & Lithium Update
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
6
December 2023 Quarterly Activities Report
31 January 2024
Mt Edwards Nickel Project
Widgie controls a dominant ~240 km2 land package over the prolific nickel-producing Widgiemooltha Dome in
Western Australia. The Mt Edwards Nickel Project is positioned adjacent to key infrastructure, located just 80km
south of the major regional centre of Kalgoorlie, 30km south-west of Kambalda and along strike to the north from
Wyloo’s Cassini Nickel mine (Figure 1).
The Mt Edwards Nickel Project is comprised of 12 separate deposits with a total Mineral Resource Estimate of 11.45
Mt @ 1.5% Ni for 171,930t as at the end of the Quarter. Five of the deposits are subject to a Scoping Study
contemplating development of a standalone nickel concentrator at Mt Edwards.
During the Quarter, the Company reported that the Scoping Study completion date5 had been revised to February
2024. This will allow for inclusion of updated Mineral Resource Estimates for the Widgie 3 and Gillett Deposits in
order to increase the proportion of Indicated material in the early years of the mine plan. The Widgie 3 & Gillett
deposits at Mt Edwards have undergone extensive infill drilling since the previous estimates with these new results
initially excluded from the Scoping Study due to timing cut-offs.
The increased confidence Scoping Study is expected to provide the foundation for the Company to then move
towards completion of a Pre-feasibility Study during 2024.
Table 2: Widgie Nickel Total Nickel Mineral Resources as at 31 December 2023
Deposit
Gillett
Indicated
Tonnes (kt) Nickel (%)
915
1.6
Widgie 3
Widgie Townsite
1,183
1.7
Munda
Inferred
TOTAL Resources
Tonnes (kt)
Nickel (%)
Tonnes (kt)
Nickel (%)
Nickel Tonnes
643
1.3
626
1.5
1,558
1.5
23,400
626
1.5
9,160
1,293
1.5
2,476
1.6
39,300
508
1.9
508
1.9
9,400
Armstrong
949
1.5
10
1.0
959
1.4
13,820
132N
34
2.9
426
1.9
460
2.0
9,050
Cooke
154
1.3
154
1.3
2,000
Inco Boundary
464
1.2
464
1.2
5,590
McEwen
1,133
1.4
1,133
1.4
15,340
McEwen
Hangingwall
1,916
1.4
1,916
1.4
26,110
Mt Edwards 26N
871
1.4
871
1.4
12,400
Zabel
272
1.9
53
2.0
325
2.0
6,360
TOTAL
3,353
1.6
8,097
1.4
11,450
1.5
171,930
All Resources reported at 1.0% Ni cut-off except for Armstrong reported at 0.7%
Ni cut-off Tonnes and grades have been rounded to reflect the relative
uncertainty of the estimates
Armstrong Deposit – Mineral Resource Update
During the Quarter, the Company was pleased to announce the updated Mineral Resource Estimate of 959Kt @
1.4% Ni for 13,820 nickel tonnes for the Armstrong Deposit, reported in accordance with the 2012 JORC Code 6.
Cube Consulting completed the MRE which was reported above a cut-off grade of 0.7% Ni for in-situ sulphide and
0% Ni for historic stockpile resources (Table 3).
6
ASX Announcement 13 December 2023 - Armstrong Mineral Resource Update
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
7
December 2023 Quarterly Activities Report
31 January 2024
Table 3: Armstrong MRE by Classification and Resource type (December 2023)
Classification
Domain
Tonnes
(kt)
Ni
(%)
Nickel
(t)
Cu
(%)
Co
(%)
Fe
(%)
As
(ppm)
MgO
(%)
3PGE
(ppm)
Indicated
Massive
Disseminated
Stockpile
Sub-Total
176
744
29
949
3.37
1.01
1.14
1.45
5,910
7,480
330
13,720
0.28
0.07
0.09
0.11
0.04
0.02
0.02
0.02
11.1
7.1
7.7
7.8
990
190
410
350
21.9
31.1
26.7
29.3
1.40
0.52
0.67
Massive
Disseminated
Sub-Total
10
10
1.04
1.04
100
100
0.07
0.07
0.02
0.02
7.1
7.1
180
180
30.9
30.9
0.60
0.60
959
1.44
13,820
0.11
0.02
7.8
350
29.3
0.67
Inferred
TOTAL
Tonnes and grades have been rounded to reflect the relative uncertainty of the estimate.
Stockpile quoted at 0.0% Ni cut-off.
This included Palladium + Platinum + Gold (3PGE) endowment with Au (0.16g/t), Pt (0.16g/t) and Pd (0.35g/t) 0.67g/t
3PGE (contained metal equating to 4,900oz Au, 5,020oz Pt and 10,710oz Pd).
The upgrade represented a 19% increase in Indicated resources to 13,720 nickel tonnes versus the 2022 Mineral
Resource Estimate (MRE). Within the updated MRE 99% of theresource is in the Indicated Resource category.
132N Deposit – High-Grade Nickel Mineralisation Defined Below Open Pit
During the period, Widgie reported results from infill drilling at its 132N Nickel Deposit (123N 7). 132N is located on
Mining Lease M15/101, 6km north-west of the Widgiemooltha township. Access is via the Coolgardie-Esperance
Highway, 63km south of Coolgardie (Refer Figure 1).
The drilling program at 132N was designed to increase the level of geological confidence in the Mineral Resource
below the current open pit to aid future underground mining studies. Previous mining of the 132N deposit was
carried out by WMC and Consolidated Minerals in two phases of open pit mining in 1990 and 2008, mining a total of
63kt tonnes at 2.9% Ni.
Geological modelling is underway with updated Mineral Resource Estimate for 132N to be completed in early 2024.
The current 132N Mineral Resource Estimate (MRE) stands at 460kt at 2.0% Ni for 9,050 Ni tonnes at a 1% Ni cutoff (Table 2).
Table 2: 132N Mineral Resource Estimate (Sept 2020) published in Widgie Nickel Prospectus dated 19 Aug 2021
Deposit
132N
Indicated
Tonnes (kt)
34
Nickel (%)
2.9
Inferred
Tonnes (kt)
426
TOTAL Resource
Nickel (%)
1.9
Tonnes (kt)
460
Nickel (%)
2.0
Nickel Tonnes
9,050
Drilling confirmed high-grade massive sulphide mineralisation located on the basal contact within a broader zone
of disseminated sulphide mineralisation within the hangingwall ultramafic unit. Massive sulphide mineralisation
intersected in 23MERCD112 demonstrates the typical massive sulphide mineralisation upon the basalt contact,
grading into disseminated sulphides into the overlying ultramafic unit (Figure 4).
7
ASX Announcement 20 November 2023 – High-Grade Nickel Mineralisation Defined Below 132N Open Pit
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
8
December 2023 Quarterly Activities Report
31 January 2024
Figure 4: 23MERCD112 displaying individual Ni assay results from disseminated to massive sulphide mineralisation
Drilling highlights included:
•
23MERCD112
9.14m @ 10.44% Ni from 330.00m
Incl.
•
23MERCD111
11.33m @ 2.77% Ni from 314.53m
Incl.
•
2.61m @ 18.88% Ni from 335.44m
23MERCD104
4.51m @ 5.30% Ni from 315.33m
9.98m @ 2.61% Ni from 336.02m
Incl.
3.00m @ 5.72% Ni from 341.00m
•
23MERCD113
6.53m @ 1.79% Ni from 327.16m
•
23MERCD114
18.40m @ 0.81% Ni from 331.60m
•
23MERCD096
14.17m @ 0.88% Ni from 345.83m
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
9
December 2023 Quarterly Activities Report
31 January 2024
Figure 5 shows a long section of 132N with 2023 and historic drill pierce points against 2020 MRE wireframes and
the 132N open pit. 2023 drilling is shown as solid fill points with pre 2023 drilling represented as hollow circles.
Results are coloured by Ni% x Interval metres.
Figure 5: 132N Longsection looking East. Exisitng open pit and 2020 MRE wireframes (grey), nickel % x interval meters solid
symbol 2023 drilling, hollow symbol = historic drilling results)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
10
December 2023 Quarterly Activities Report
31 January 2024
Figure 6 highlights a high-grade pod drilled in 2023 extending approximately 150m along strike including mineralised
intercept of 23MERCD112 (9.14m @ 10.44% Ni). These results are highly encouraging in that they demonstrate the
potential to see the resource expand down dip of the mineralised trough which was previously considered to be
closed off. Figure 6 also demonstrates that 132N mineralisation remains open both at depth and up plunge of the
high-grade pod where no drilling exists. This represents a high order drill target at 132N.
Figure 6: 132N longsection looking East. 132N high-grade pod with strike extent of 150m, up plunge of high-grade pod is
untested and 132N mineralisation remains open at depth
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
11
December 2023 Quarterly Activities Report
31 January 2024
Corporate
As at 31 December 2023, Widgie held $2.59 million cash at bank. Full details regarding the Company’s cash
movements during the Quarter can be found in the attached Appendix 5B.
The Company notes the rapid deterioriation of the nickel and lithium prices and its resultant deletrious effect on
equity markets. The Company has sought to wind back expenditures which remain largely in line with existing plans
but has implemented further austerity measures to preserve existing cash reserves whilst this period of uncertainty
prevails. High cost drilling activities have been curtailed with the primary focus for the forthcoming period being on
desk top studies, metallurgical testwork and regional field exploration activities.
The Company held its Annual General Meeting on 8 November 2023. All resolutions put to the meeting were passed
on a poll, this including full refereshment of the Company’s placment capacity under ASX listing rule 7.1 and
approval for the additional 10% placment capacity under 7.1A.
Corporate information as at 31 December 2023:
ASX code:
WIN
Board of Directors:
Quoted Ordinary shares on issue:
297,945,053
Steve Norregaard – Managing Director & CEO
Restricted Ordinary shares on issue:
-
Andrew Parker – Independent Non-Executive Chairman
Unlisted Options ($0.20 to $0.40):
11,694,000
Felicity Repacholi - Independent Non-Executive Director
Unlisted Performance Rights
1,649,000
Scott Perry - Independent Non-Executive Director
Share price range since listing:
$0.087 to $0.67
Share price at end of Quarter:
$0.093
Company Secretary:
Market cap (at $0.093):
$27.7m
Graeme Scott
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
12
December 2023 Quarterly Activities Report
31 January 2024
Additional ASX Listing Rule Disclosures
ASX Listing Rule 5.3.1: Payments for exploration, evaluation and development during the Quarter totalled
$2,890,782 Details of exploration activities undertaken during the Quarter are as described above and in this
section.
ASX Listing Rule 5.3.2: The Company confirms there were no mining production and development activities
undertaken during the Quarter.
ASX Listing Rule 5.3.3: The details of the mining tenements, the location and the Company’s beneficial percentage
interest held in those Tenements at the end of the Quarter is included in the Table at the end of this as Appendix 1.
ASX Listing Rule 5.3.5: payments to related parties or associates of the Company during the Quarter totalled
$158,000. The payments were in respect of salaries and superannuation paid to the executive director and
directors’ fees payable to the non-executive directors.
Approved by: Board of Widgie Nickel Ltd
-ENDS-
For further details please contact:
Media Enquiries
Steve Norregaard
Fiona Marshall
Managing Director
White Noise Communications
Widgie Nickel
fiona@whitenoisecomms.com
steve@widgienickel.com.au
0400 512 109
0472 621 529
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
13
December 2023 Quarterly Activities Report
31 January 2024
Competent Person Statement
The information in this announcement that relates to exploration results and sampling techniques is based on and
fairly represents information and supporting documentation compiled by Mr William Stewart, who is a full-time
employee of Widgie Nickel Limited. Mr Stewart is a member of the Australian Institute of Metallurgy and Mining
(member no 224335) and Australian Institute of Geoscientists (member no 4982). Mr Stewart has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in
the report of the matters based on his information in the form and context in which it appears.
Compliance Statement
The information in this report are extracted from the ASX Announcements listed in the table below, which are also
available on the Company’s website at www.widgienickel.com.au and the ASX website www.asx.com under the
code WIN.
02/10/2023
Drilling Delivers High-Grade Lithium at Trainline
26/10/2023
Material Uplift in Faraday Lithium Grades
08/11/2023
375% Growth in Faraday-Trainline Lithium Mineral Resource
20/11/2023
High-Grade Nickel Mineralisation Defined Below 132N Open Pit
13/12/2023
Armstrong Mineral Resource Update
18/12/2023
Mt Edwards Scoping Study & Lithium Update
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the market announcements continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have not
been materially modified from the original market announcements.
Forward Looking Statement
Caution regarding Forward Looking Information. This document contains forward looking statements concerning
Widgie Nickel Limited. Forward looking statements are not statements of historical fact and actual events and
results may differ materially from those described in the forward-looking statements as a result of a variety of risks,
uncertainties, and other factors. Forward looking statements in this document are based on Widgie's beliefs,
opinions and estimates as of the dates the forward-looking statements are made, and no obligation is assumed to
update forward looking statements if these beliefs, opinions, or estimates should change or to reflect other future
developments.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
14
December 2023 Quarterly Activities Report
31 January 2024
Appendix 1 – Tenement Interests
There were no changes in the Company’s tenement interests during the Quarter. As of 31 December 2023, the Company
has an interest in the following projects and tenements in Western Australia:
Project Name
Licence Name
Beneficial Interest
Status
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
Mt Edwards
M15/87
M15/699
P15/5905
P15/5906
M15/1899
P15/6362
P15/6387
E15/1665
P15/6408
P15/6539
E15/1749
E15/1929
E15/1864
P15/6570
P15/6612
L15/0426
M15/45
M15/46
M15/48
M15/74
M15/75
M15/77
M15/78
M15/79
M15/80
M15/94
M15/96
M15/97
M15/99
M15/100
M15/101
M15/102
M15/103
M15/105
L15/102
M15/478
M15/633
M15/653
M15/693
M15/698
M15/1271
L15/254
E15/989
L15/280
E15/1505
E15/1507
E15/1576
E15/1583
P15/6092
E15/1553
100% (**)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100%
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (^)
100% (^)
100% (^)
100% (^)
100% (^)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (#)
100% (^)
100% (^)
100%
100% (^)
100% (^)
100% (#)
100% (^)
100% (#)
100% (#)
100%
100% (^)
100%
100%
100%
100% (#)
100% (#)
100% (#)
100% (#)
Live
Live
Live
Live
Pending
Live
Live
Pending
Live
Pending
Live
Pending
Pending
Live
Live
Pending
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
Live
**Lithium and Nickel Mineral rights only, ^Nickel Mineral rights only, # No gold interest
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
15
December 2023 Quarterly Activities Report
31 January 2024
Appendix 2 – RC Holes drilled during the Quarter.
Nil
Appendix 3 – DD tails completed during the Quarter.
Prospect
Tenement
Hole ID
Depth
Easting
Northing
RL
Dip
Azi
Status
Trainline
M15/102
23MEDD011
46.9
360574
6516058
369
-60.2
90.6
DD Completed
Trainline
M15/102
23MEDD012
58.7
360446
6516141
368
-59.7
90.9
DD Completed
Faraday
M15/102
23MEDD013
13.2
360577
6515576
377
-60.0
89.2
DD Completed
McEwen HW
M15/653
23MERCD139
420.6
358715
6525450
322
-60.6
81.6
DD Completed
McEwen HW
M15/653
23MERCD140
243.6
358827
6525412
321
-60.8
79.3
DD Completed
McEwen HW
M15/653
23MERCD141
357.5
358786
6525342
321
-60.9
79.0
DD Completed
McEwen HW
M15/653
23MERCD142
297.5
358861
6525279
322
-61.2
79.0
DD Completed
McEwen HW
M15/653
23MERCD144
268
358929
6525178
321
-60.5
79.6
DD Completed
McEwen
M15/653
23MERCD145
210.6
359585
6524753
318
-60.6
249.5
DD Completed
McEwen
M15/653
23MERCD146
300.5
359643
6524751
317
-59.4
249.9
DD Completed
McEwen
M15/653
23MERCD147
297.5
359606
6524671
318
-55.2
249.8
DD Completed
Widgie Townsite
M15/94
23MEDD014
8.3
364397
6513736
318
-85.0
54.2
DD Completed
Widgie Townsite
M15/94
23MEDD015
115
364335
6513692
319
-85.6
61.6
DD Completed
Widgie Townsite
M15/94
23MEDD016
47.2
364397
6513735
318
-85.0
65.7
DD Completed
Gillett
M15/94
23MEDD017
59.3
365507
6512858
324
-84.2
66.6
DD Completed
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@widgienickel.com.au
www.widgienickel.com.au
ASX:WIN
16
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
WIDGIE NICKEL LIMITED
ABN
Quarter ended (“current quarter”)
77 648 687 094
31 DECEMBER 2023
Current quarter
$A’000
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (6
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs – net of project allocations
(159)
(315)
(e) administration and corporate costs
(397)
(867)
-
-
1.3