Butchers Creek Gold Project Delivers High-Grade Results
Released
Released
Announcement PDF
Butchers Creek Gold Project Delivers High-Grade Results
ASX Announcement
7 November 2024
ASX:WIN
7 November 2024
Butchers Creek Gold Project Delivers HighGrade Results
Highlights
•
First results received from Butchers Creek drilling
•
Drilling delivers strong, coherent zones of gold mineralisation:
o 24BCRC002 66m @ 1.89g/t Au from 280m
Incl. 17m @ 3.10g/t Au from 311m
o 24BCRC004 10m @ 2.54g/t Au from 368m
Incl.
3m @ 5.70g/t Au from 374m
•
Drilling confirms mineralisation remains open down plunge with the potential for
significant resource growth
•
Drilling is now complete with strong news flow predicted over the coming months
WIN Metals Ltd (ASX: WIN) (“WIN” or “the Company”) is pleased to report initial drilling results,
highlighting significant gold intersections at the Butchers Creek Gold Project.
A total of 25 drillholes for 7,200m have been completed, with the program designed to increase
resource confidence and test for down dip extensions at Butchers Creek and Golden Crown in
addition to reconnaissance drilling at Mt Bradley.
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
“We are only three holes into this program and the magnitude of the resource is confirmed.”
“It’s early days and we expect many more highlights to come after the successful completion of
WIN’s first exploration program at Butchers Creek. I look forward to more results confirming the
quality of the gold endowment we are dealing with. We have embarked on an exciting new golden
era for WIN Metals.”
Discussion of Results
This release captures the results from the first three (3) completed drillholes. These drillholes were
designed to increase the level of confidence of the inferred resource at Butchers Creek. All holes
intersected the prospective syenite gold bearing horizon. The plan view of Butchers Creek below
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
1
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
illustrates the drill section lines for each drill hole outlined within this announcement. Details of
each drill intercept are found below.
Figure 1 - Plan view of Butchers Creek with related drill section lines
Hole 24BCRC002 intersected the high-grade mineralised hinge of the syenite unit returning 66m
@ 1.89g/t Au from 280m, including a higher-grade interval of 17m @ 3.10g/t Au from 311m depth
as illustrated in Figure 2. This demonstrates the broad high-grade zone of gold mineralisation in the
hinge zone of the syenite. Historic hole BCRC472 intersected both the western and eastern limb of
the syenite and display narrower zones of gold mineralisation as opposed to the thick hinge zone
of the syenite host unit. The definition of the high-grade hinge zone will be targeted in future
programs.
Hole 23BCRC003 drilled through the western limb of the syenite returning an interval of 2m @
1.65g/t Au from 321m. This intercept is located 25m from BCRD480 which intersected the highgrade hinge zone returning 25m @ 2.46g/t Au and also drilled through the eastern limb. 24BCRC003
returned gold mineralisation above the syenite unit within the overlying sediment package. Further
work is required to understand this gold deposition within the sediments outside of the syenite host
unit (refer to Figure 3).
Hole 24BCRC004 was drilled on the southern limit of the current resource envelope between two
historic drill holes that were previously interpreted to close off the mineralisation at depth. This
hole, returning an interval of 10m @ 2.54g/t Au including 3m @ 5.70g/t Au, importantly
confirms the gold mineralisation at Butchers Creek has not terminated and is likely to
continue at depth towards the Far South drill target. This result is a significant milestone early
in the WIN program (refer to Figure 4).
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
2
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Figure 2 - 24BCRC002 drill section (*denotes historic drillhole)
Figure 3 - 24BCRC003 drill section (* denotes historic drillhole)
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
3
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Figure 4 - 24BCRC004 drill section (*denotes historic drillhole)
Future Work
With the 2024 drill programme now completed, assay results for the remaining drillholes are
expected over the coming months. These results will be evaluated along with the processing of two
diamond tails from Butchers Creek Far South and one diamond hole at Golden Crown. The hole at
Golden Crown was designed to gain structural data to assist in optimising the orientation of future
drill programmes targeting high-grade structures.
WIN is taking the opportunity to reprocess all core drilled at the Butcher Creek Gold Project since
2020. All core has been re-packed and dispatched to Perth for detailed geological, structural,
geotechnical and metallurgical analysis over the 2024/2025 Kimberley wet season period.
Validation and remodelling of the data at Butchers Creek and Golden Crown will commence once
all data is received to inform new geological and mineral resource models before the 2025 field
season commences.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
4
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Butchers Creek Gold Project Mineral Resources
Table 1- Butchers Creek Gold Mineral Resource Table Summary
Indicated
Inferred
Total
Resource
Last Update
Tonnes
(Mt)
Grade
(g/t Au)
Tonnes
(Mt)
Grade
(g/t Au)
Tonnes
(Mt)
Grade
(g/t Au)
Ounces
Butchers Creek
Jun-21
1.9
2.2
3.3
1.7
5.2
1.9
319,000
Golden Crown
Jun-21
-
-
0.4
3.1
0.4
3.1
38,000
1.9
2.2
3.7
1.8
5.6
2.0
357,000
Total
Note: Figures are rounded and reported at 0.8g/t Au cut-off
1
Location and Project History
Butchers Creek is located 30km south-east of Halls Creek in the Kimberley region of Western
Australia. The project is accessible via the unsealed Duncan Road that connects the project to the
town of Halls Creek and the sealed Great Northern Highway.
Figure 5 - Location of Butchers Creek Gold Project
ASX:WIN announcement “Butchers Creek Gold Project MRE and Exploration Results - Amended” Released 11 Sep
2024
1
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
5
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
The Halls Creek region heralded Western Australia’s first gold rush in the 1890s but has been
largely limited to small scale mining and artisanal activities until the 1990s.
In 1993 Precious Metals Australia (PMA) acquired the Project and carried out extensive drilling at
Butchers Creek, completing geotechnical studies, metallurgical test work and mineral resource
calculations.
Gold production from the Butchers Creek open pit commenced in 1995 with the construction of a
500ktpa conventional carbon in pulp gold ore processing plant, a 9Mt tails storage facility, diesel
power station and a 75-person accommodation camp and offices (Figure 6).
During operation supplementary ore was trucked some 80kms from the Nicholson’s Find gold
mine located to the south of Halls Creek (recently sold by Pantoro Limited (ASX:PNR)) and
processed at Butchers Creek. Total production from Butchers Creek open pit was 761,000t @
2.09g/t Au for 52,000oz of gold produced until the operation was closed in late 1997 due to the low
gold price at the time. The Butchers Creek 500ktpa processing plant has since been
decommissioned and mine site rehabilitated.
Post closure of the mining operation in 1997 various public and private entities having held the
tenure with exploration drilling in the ensuing period carried out by Northern Star Resources in 2004
and Meteoric between 2020 and 2022.
Figure 6 - Butchers Creek gold processing plant. Circa 1996.
Figure 7 - Butchers Creek open pit May 2024
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
6
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Regional Geology
Butchers Creek is found within the north-east to south-west belt of the Halls Creek Orogen
comprised of Paleoproterozoic sediments, volcanics and intrusive rocks. Gold occurrences of the
Halls Creek Mobile Zone are found within the eastern zone of the orogen within the Butchers Gully
Member of the Olympio Formation as illustrated in Figure 8 below.
Figure 8 - Regional geology of East Kimberley
Local Geology and Mineralisation
Gold mineralisation at Butchers Creek is stratabound within tightly folded antiform hinge zones of
an intrusive syenite host. This is bound within a sedimentary package of sandstones, siltstones
and shales. The antiform hosting the mineralised syenite plunges at 20o-25o to the south-west that
is traceable over 1.4km to a vertical depth of 400m, down plunge extent limited by drilling.
Gold is strongly associated with potassic alteration and sulphide bearing quartz veins within the
syenite host unit. Several styles of quartz veining are present including saddle reefs, parallel
bedding veins and flat lying extensional veins.
About WIN Metals
WIN Metals (ASX: WIN) is a mineral exploration company holding 340km2 of granted tenure in the
Southern Goldfields and Kimberley regions of Western Australia. WIN possesses gold, nickel and
lithium resources within the Company tenure. The Mt Edwards Nickel and Faraday-Trainline
Lithium Projects are located at Widgiemooltha 80km south of the major regional centre of
Kalgoorlie-Boulder and 30km south-west of the town of Kambalda. The Mt Edwards Nickel Project
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
7
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
is a collection of twelve (12) nickel deposits with a total mineral resource reported at 13Mt @ 1.45%
Ni for 188,160t of nickel 2.
The Faraday-Trainline Lithium Project is shovel ready with an approved small mining proposal 3 and
a reported mineral resource of 1.96 Mt @ 0.69% Li2O 4.
The Butchers Creek Gold Project is located 30km south-east of Halls Creek in the Kimberley region
of Western Australia. Butchers Creek is a historic gold production centre hosting a global mineral
resource of 5.6Mt @ 2.0g/t Au for 357,000oz of gold and a series of advanced gold drill targets.
Previous production from the Butchers Creek gold mine resulted in 52,000oz of gold being
produced between 1995 and 1997.
Figure 9 - WIN Metals Project Map
Summary Information
This announcement has been prepared by WIN Metals Limited (WIN) and includes information
regarding WIN’s disclosure of results to the ASX.
ASX:WIN announcement “Munda Agreement with Auric Mining Ltd yields $1.2m+ for WIN (Updated)” Released 23 July
2024
3
ASX:WIN announcement “Faraday Mining Proposal Approved” Released 4 August 2023
4
ASX:WIN announcement “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
8
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
This announcement should also be read in conjunction with WIN’s other periodic and continuous
disclosure announcements lodged with the ASX, which are available at www.asx.com.au and also
available on WIN’s website at www.winmetals.com.au.
Table 2 - Reference documents included in this announcement
Number Announcement Date Company
1
11-Sep-24
WIN
Announcement Title
Butchers Creek Gold Project MRE and Exploration Results - Amended
Competent Person Statement – Exploration Results
The information in this announcement that relates to mineral resource estimates and exploration
results is based on information reviewed, collated and fairly represented by Mr William Stewart,
who is a full-time employee of WIN Metals Ltd. Mr Stewart is a member of the Australian Institute
of Metallurgy and Mining (member no 224335). Mr Stewart has sufficient experience that is relevant
to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stewart
consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears. Additionally, Mr Stewart confirms that the entity is not aware of any
new information or data that materially affects the information contained in the ASX releases
referred to in this report.
Compliance Statement
The Company confirms it is not aware of any new information or data that materially affects the
information included in the original market announcement(s), and in the case of estimates of
Mineral Resources that all material assumptions and technical parameters underpinning the
estimates in the relevant announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcement.
Forward Looking Statements
This announcement includes forward-looking statements that are only predictions and are subject
to known and unknown risks, uncertainties, assumptions and other important factors, many of
which are beyond the control of WIN Metals Ltd, the directors and the Company’s management.
Such forward-looking statements are not guarantees of future performance.
Examples of forward-looking statements used in this announcement include use of the words
‘may’, ‘could’, ‘believes’, ’estimates’, ‘targets’, ’expects’, or ‘intend’ and other similar words that
involve risks and uncertainties. These statements are based on an assessment of present
economic and operating conditions, and on a number of assumptions regarding future events and
actions that, as at the date of announcement, are expected to take place.
Actual values, results, interpretations or events may be materially different to those expressed or
implied in this announcement. Given these uncertainties, recipients are cautioned not to place
reliance on forward-looking statements in the announcement as they speak only at the date of
issue of this announcement. Subject to any continuing obligations under applicable law and the
ASX Listing Rules, WIN Metals Ltd does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this announcement or any changes in
events, conditions or circumstances on which any such forward-looking statement is based.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
9
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Approved by: The Board of Directors
-ENDSFor further details please contact:
Steve Norregaard
Media Enquiries
Managing Director
Fiona Marshall
WIN Metals
White Noise Communications
steve@winmetals.com.au
fiona@whitenoisecomms.com
0472 621 529
0400 512 109
Annexure A: Drillhole Details
Table 3 - Butchers Creek Infill drill hole data
Hole Type
Hole ID
Northing
(m)
Easting
(m)
RL
(m)
RC
RC
RC
RC
24BCRC001
24BCRC002
24BCRC003
24BCRC004
374354
374349
374353
374253
7970636
7970638
7970532
7970482
387
387
389
384
RC = Reverse Circulation
Co-ordinates in MGA (GDA94) Zone 52S
EOH
Depth
(m)
120
360
348
403
Azimuth
Dip
Comment
-59.4
-68.9
-76.3
-68.4
120.0
120.6
124.5
113.6
Hole terminated due to deviation
Table 4 - Butchers Creek Infill Assay Table
Hole ID
From (m)
24BCRC001
24BCRC002
including
24BCRC003
and
24BCRC004
and
including
280
311
276
321
334
368
374
To
(m)
Interval
(m)
Grade Au
(g/t)
Gram x
Metres
346
328
278
323
337
378
377
66
17
2
2
3
10
3
1.89
3.10
1.36
1.65
1.84
2.54
5.70
125
53
3
3
6
25
17
Comment
Hole terminated due to
deviation
High grade hinge position
High grade hinge position
Mineralisation in sediments
Western Limb position
Top of hinge
High grade hinge
High grade hinge
Significant intercepts above 0.5g/t Au, 2m internal dilution to allow for grade continuity.
All intervals are quoted down hole
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au 10
www.winmetals.com.au
ASX:WIN
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Annexure B: Table 1 As Per JORC Code Guidelines (2012)
Section 1 Sampling Techniques and Data - Butchers Creek
Criteria
Sampling
techniques
Commentary
All new data collected from the Butchers Creek gold project discussed in this report is
in relation to Reverse Circulation (RC) and diamond drilling (DD) completed in 2024,
unless stated otherwise.
RC samples have been by one metre sample intervals from the cone splitter mounted
cyclone of the RC drill rig. Typically, 100% recovered single metre samples returned
weights of 2.5-3kg. No duplicate QAQC samples were taken at the rig with laboratory
duplicates preferred to test laboratory repeatability. The sample reject was placed by
buckets in lines of 20 or 40 samples for geological inspection, sample quality and
recovery logging.
Samples assessed as prospective for gold mineralisation have been assayed at single
metre sample intervals. The prospective horizon is deemed by host rock (syenite),
quartz and/or sulphide content. Areas outside the known mineralisation envelope (not
within the host syenite unit or quartz veining) the rig geologist has deemed to
potentially host gold mineralisation was composite sampled into 4 metre composites
utilising industry standard process of scoop sampling the sample reject piles.
DD samples NQ2 and HQ3 size core have been acquired according to logged
lithological and mineralisation boundaries at lengths between 0.3 metres to 1.3
metres.
No other measurement tools related to sampling have been used in the holes for
sampling other than directional/orientation survey tools.
Samples have been freighted to Bureau Veritas Assay Laboratories in Canning Vale,
Western Australia. On arrival at the laboratory the samples were receipted, weighed
and dried. Sample was then crushed and pulverised with a 40g charge used by fire
assay and then analysed by Atomic Absorption Spectrometry.
Drilling
Techniques
RC drilling was carried out using a Schramm 685 truck mounted rig utilising an
auxiliary Sullair 1150 compressor and Air Research 2610 booster. Drill rods are 6
metres long and drill bit diameter is 143mm. Holes have been drilled at angle of -60° to
-80° with varying azimuth angles to orthogonally intercept the interpreted favourable
geological host unit.
The DD rig was a Boart Longyear KWL1600 truck mounted drill rig drilling NQ2 and HQ3
size core. Core was oriented using Axis Ori Champ at 6m or 3m runs dependant on the
competency of the core.
Drill Sample
Recovery
The sample recovery is logged by a geologist during drilling and recoveries have been
considered acceptable.
No relationship between sample recovery and grade has been recognised.
Logging
All RC drillholes have been geologically logged for lithology, weathering, alteration,
and mineralogy. All samples have been logged in the field at the time of drilling and
sampling (both quantitatively and qualitatively where viable) with spoil material and
sieved rock chips assessed. All RC holes have been photographed.
Sporadic pXRF analysis has been used to validate logging with multielement but
mainly Zn values used to determine the lithology.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au 11
www.winmetals.com.au
ASX:WIN
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Section 1 Sampling Techniques and Data - Butchers Creek
Criteria
Commentary
All DD holes have been geologically logged (both quantitatively and qualitatively) for
lithology, weathering, alteration and mineralogy and sampled following drilling. All DD
holes are photographed.
Sub-sampling
techniques
and sample
preparation
The sample preparation technique carried out in the field is considered industry best
standard practice completed by the geologist and field staff. Single metre samples
were collected in a numbered calico bag each weighing 2.5kg-3.0kg from the RC rigs
cone splitter by the drillers offsider and placed above the corresponding sample reject
pile. The geologist would nominate sampling zones and then assign final sequenced
pre-number calico bags to the sampling intervals. The numbered calico bag would be
placed into the final pre numbered calico bag ready in preparation for submission to
the laboratory. QAQC standards and blanks were added to the submission at this
point. All numbered calico bags that have not been nominated for assay submission
are retained on the drill site or disposed of.
DD: Samples of NQ2 and HQ3 size core at lengths between 0.3 metres to 1.3 metres
have been cut with an Almonte core saw and half core submitted for analysis. With the
remaining half core retained for future testwork.
Samples were dispatched from Halls Creek and freighted by road to Perth. Upon
arrival at the laboratory the samples are receipted, weighed then dried for 12 hours at
105oC before sample preparation commenced. Samples are then crushed by a Jaw
Crusher to sub 3mm then pulverised utilising a LM5 puck and bowl pulveriser for 3-5
minutes to achieve 90% 75um. A 150g split of pulverised material was placed in a
pulp packet in readiness for Fire Assay where 50g is used for Fire Assay and gold
determination by Atomic Absorption Spectrometry. The remainder of the pulverised
sample was bagged and retained.
Sampling preparation outlined above is considered appropriate for gold determination
and is considered standard industry practices.
Quality of
assay data
and laboratory
tests
WIN Metals has established QAQC procedures for all drilling and sampling programs
including the use of commercial Certified Reference Material (CRM) as field and
laboratory standards, field and laboratory duplicates and blanks.
Gold CRM samples have been inserted into the batches by the geologist, at a nominal
rate of 5% of the total samples.
Lab duplicates samples have been selected in mineralised zones, at a rate of 2% of
total samples.
Samples of blank material have been submitted immediately after visibly mineralised
zones at a nominal rate of 5% of the total samples.
Sample size is considered appropriate to the grain size of the material being sampled.
Assaying was completed by Bureau Veritas in Canning Vale, Western Australia with
standards and duplicates reported in the sample batches.
The samples have been analysed by firing a 40g portion of the sample. Lower sample
weights may be employed for samples with very high sulphide and metal contents.
This is the classical fire assay process and will give total separation of Gold in the
sample. Gold has been determined by Atomic Absorption Spectrometry.
Internal sample quality control analysis was then conducted on each sample and on
the batch by the laboratory.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au 12
www.winmetals.com.au
ASX:WIN
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Section 1 Sampling Techniques and Data - Butchers Creek
Criteria
Commentary
Results have been reported to WIN Metals in CSV, SIF and PDF formats.
A detailed QAQC analysis has been carried out with all results assessed for
repeatability and meeting expected values relevant to Gold and related elements. Any
failures or discrepancies are followed up as required.
There has been no cross-laboratory testing utilising an umpire laboratory at this stage
Verification of
sampling and
assaying
Assay results are provided by the laboratory to WIN Metals in CSV, SIF and PDF
formats, and then validated and entered into the database managed by internal
Database Administrator. Backups of the database are stored on a local server.
Assay, Sample ID and logging data are matched and validated using filters in the
database. The data is further visually validated by WIN Metals geologists and database
staff.
Significant results are verified by senior WIN Metals geologists. QAQC reports are run
and the performance of the laboratory is evaluated periodically by senior WIN Metals
geologists.
Location of
data points
All drill collars have been surveyed by WIN using a Trimble DGPS RTX. With accuracy
of 0.02m in horizontal and 0.1m in vertical component.
ESPG: 28352 GDA94/MGA zone 52S is the grid system used in this programme.
Data spacing
and
distribution
All RC drillholes have been sampled at 1 metre intervals down hole.
All DD drillhole have been sampled at between 0.3 and 1.3 metres
Drillholes have been designed and completed to infill and extend known
mineralisation, with a nominal drillhole spacing of recent and historical drilling of 30 to
60 metres. The drillhole spacing is considered sufficient to establish the degree of
geological and grade continuity appropriate to estimate and report an Inferred Mineral
Resource or better.
Were drill spacing and grade continuity is less appropriate inferred and exploration
targets will be considered. Exploration drilling was designed to intercept
mineralisation plane with no consideration to data spacing and distribution.
The drill spacing is considered sufficient to support exploration results.
No compositing has been applied to exploration results.
Orientation of
data in
relation to
geological
structure
No Structural data has been obtained during this RC drilling programme.
All DD holes have been orientated to gain structural measurements from features of
the drill core.
All drillholes have been planned at varying dip and azimuth angles in order to, where
possible, orthogonally intercept the interpreted mineralised syenite host unit. Due to
the antiformal nature of the host some level of bias will be introduced to sampling.
Geological information (including structural) from both historical geological mapping
as well as current geological mapping has been used during the planning of these
drillholes. Due to the orientation of the mineralised zones in some place, there will be
some exaggeration of the width of intercepts.
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au 13
www.winmetals.com.au
ASX:WIN
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Section 1 Sampling Techniques and Data - Butchers Creek
Criteria
Sample
security
Commentary
All samples were transported by road via Halls Creek to Broome then to Bureau
Veritas Laboratories in Canning Vale, WA for analysis. All samples are transported in
bulka bags and is considered to be industry standard.
All core has been transported to WIN’s processing facility in Carlisle, Perth Western
Australia. Where the core is logged and processed before being sampled and
dispatched to Bureau Veritas Laboratories in Canning Vale, WA for analysis. All
samples are transported in bulka bags and is considered to be industry standard.
Audits or
reviews
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
A review of the exploration programme was undertaken prior to the programme was
executed by WIN Metals geology management. Staff and contractors are based on site
prior to, during and on completion of the programme to ensure proper quality control
as per industry standards.
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au 14
www.winmetals.com.au
ASX:WIN
Butchers Creek Gold Project Delivers High-Grade Results
7 November 2024
Section 2 Reporting of Exploration Results - Butchers Creek
Criteria
Mineral
tenement and
land tenure
status
Commentary
Butchers Creek Gold Project is a collective of 3 granted mining leases, 5 granted
exploration licences, 3 granted prospecting licences and 2 pending prospecting
licences.
Type
Status
WIN % (To
Acquire)
Grant Date
End Date
M80/106
Mining Lease
Granted
97
24/07/1986
23/07/2028
38.8
M80/315
Mining Lease
Granted
97
22/08/1990
21/08/1932
511.6
M80/418
Mining Lease
Granted
100
6/09/1995
5/09/2037
6.8
E80/4856
Exploration Licence
Granted
100
15/09/2015
14/09/2025
3176.6
E80/4874
Exploration Licence
Granted
100
15/09/2015
14/09/2025
1135.3
E80/4976
Exploration Licence
Granted
100
7/02/2017
6/02/2027
1778.0
E80/5059
Exploration Licence
Granted
100
26/07/2017
25/07/2027
3246.2
E80/5584
Exploration Licence
Granted
100
21/02/2022
20/02/2027
112.8
P80/1839
Prospecting Licence
Share your feedback
Discover