12 December 2025
WIN WELL FUNDED TO ADVANCE TOWARDS
GOLD PRODUCTION FOLLOWING PLACEMENT
New funds to advance high-grade Radio Gold Mine and Butchers Creek
Gold Projects towards development
• Placement at $0.035 per share: WIN Metals has received firm commitments for $5,500,000
through a heavily oversubscribed placement to strategic and existing investors
• Drilling at Radio Gold Mine: Funds will be directed to resource and exploration drilling at
Radio and preparatory works in advance of production
• Drilling at Golden Crown: Funds will support drilling at the Golden Crown deposit to
incorporate this deposit into an updated feasibility study for the Butchers Creek Project
development
• Strong near-term news flow: Results from drill programs are expected to enhance and
advance the pathway to production allowing WIN to capitalise on historically high gold
prices
WIN Metals Limited (ASX: WIN, WIN or the Company) is pleased to announce that it has received
firm commitments to raise A$5.5 million (before costs) via a share placement at an issue price of
A$0.035 per share, together with 1 free attaching option for every 2 shares issued under the
placement (Placement).
The Company received strong support for the Placement from existing and new sophisticated and
professional investors, with demand significantly in excess of total funds sought under the
Placement.
Placement proceeds will primarily be used to fund the second phase of drilling at the Radio Mine
Gold Project and drilling and evaluation work at the Butchers Creek Gold Project. Drilling at Radio is
expected to commence in the New Year following final analysis and interpretation of WIN’s maiden
drill program completed in November 2025.Drilling and resource development at the Golden Crown
deposit at the Company’s Butchers Creek Project is expected to commence following the end of the
Kimberley wet season.
The issue of the shares under the Placement will be issued under the Company’s available
placement capacity under Listing Rules 7.1 and 7.1A.
The options will be issued subject to the receipt of shareholder approval to be sought at a General
Meeting of the Company, which is expected be held in late January 2026. The Company will seek
quotation of the options subject to meeting ASX listing requirements.
GBA Capital acted as the Lead Manager to the Placement.
2
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
WIN WELL FUNDED TO ADVANCE TOWARDS GOLD
PRODUCTION FOLLOWING PLACEMENT
12 December 2025
Placement Overview
WIN has raised gross proceeds of A$5.5 million via a Placement of 157,142,857 shares at an issue
price of A$0.035 per share (Placement Price). The Placement Price of A$0.035 per share represents
a:
• 15.5% discount to the 10 day VWAP of $0.0414; and
• 15.6% discount to the 30 day VWAP of $0.0415.
The shares will be issued under the Company’s Listing Rules 7.1 and 7.1A placement capacity, with
88,216,429 shares to be issued under Listing Rule 7.1, and 68,926,428 to be issued under Listing
Rule 7.1A.
WIN will also,subject to shareholderapproval,issue one (1) attaching optionforevery two (2) shares
issued pursuant to the Placement. The options will be exercisable at $0.07 each, with an expiry date
2 years from the date of issue. The Company plans to seek shareholder approval for these issues at
a General Meeting, which is expected to be held in late January 2026.
At the same meeting, approval will also be sought for the directors to participate on the same terms
as the Placement for a further 285,714 shares and 142,857 options.
Placement proceeds will primarily be applied towards:
• Resource and exploration drilling at Radio Gold Mine Project;
• Resource and exploration drilling at the Golden Crown deposit at the Company’s Butchers
Creek Project;
• Ongoing evaluation and technical studies for development; and
• General working capital and costs of the offer.
Lead Manager
The Company has agreed to pay the Lead Manager a cash management and raising fee totalling 6%
of the amount raised by the Lead Manager under the Placement.
WIN Metals Managing Director and CEO, Mr Steve Norregaard, commented:
“On behalf of the Board of Directors, I am pleased to thank our existing investors for their ongoing
support and also welcome the new investors to the Company. These funds will allow us to rapidly
progress our plans to transition to a producer.TheWIN team are enthused by what we have achieved
at both our Butchers Creek Gold Project and the Radio Gold Mine Project in a very short time frame
since acquiring the projects. We all have much to look forward to over the coming months with gold
production now firmly in our sights”
Approved by: The Board of Directors
-ENDS-
For further details please contact:
Steve Norregaard
Managing Director
WIN Metals Ltd
steve@winmetals.com.au
0472 621 529
3
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
WIN WELL FUNDED TO ADVANCE TOWARDS GOLD
PRODUCTION FOLLOWING PLACEMENT
12 December 2025
About WIN Metals
WIN Metals (ASX: WIN) is a mineral exploration company holding 350km2
of granted tenure in the
Southern Goldfields and Kimberley regions of Western Australia. WIN’s mineral endowment
includes gold, nickel and lithium resources within the Company’s extensive tenure.
The Mt Edwards Nickel and Faraday-Trainline Lithium Projects are situated near Widgiemooltha,
approximately 80km south of the regional centre of Kalgoorlie-Boulder and 30km south of
Kambalda. The Mt Edwards Nickel Project is a collection of eleven (11) nickel deposits with a total
mineral resource of 12.7Mt @ 1.43% Ni for 180,900t of contained nickel1
. The Faraday-Trainline
Lithium Project has a reported mineral resource of 1.96 Mt at 0.69% Li2O2
.
The Butchers Creek Gold Project is located 30km southeast of Halls Creek in the Kimberley region
of Western Australia. It is a historic gold production centre hosting a global mineral resource of
5.6Mt at 1.98g/t Au for 359,000oz3
of gold. Previous mining operations at Butchers Creek produced
52,000 ounces of gold between 1995 and 1997.
WIN recently acquired the Radio Gold Project in September 2025, located 8km north of Bullfinch,
approximately 38km northwest of Southern Cross and about 400km east of Perth in the Yilgarn
region of Western Australia. Over its production life, the Radio mine has historically produced
approximately 71,000 ounces at an exceptionally high grade of 38g/t Au.
Table 1: WIN Metals Butchers Creek Gold Mineral Resource Estimates
Deposit Last Update Resource Classification Tonnes (Mt) Au g/t Contained Gold (Oz)
Butchers Creek Apr-25
Indicated 3.58 2.24 258,000
Inferred 1.65 1.18 63,000
Golden Crown Jun-21 Inferred 0.40 3.10 38,000
Total Indicated + Inferred 5.63 1.98 359,000
Note: Butchers Creek figures are rounded and reported at 0.5g/t Au cut-off to 150m below surface (open pit) and 0.8g/t Au cut-off below
150m of surface. Golden Crown figures are rounded and reported above a 0.8g/t Au cut-off.
1
ASX:WIN “Sale of non-core assets yield $1.4M for WIN to advance gold Assets” Released 1 July 2025
2
ASX:WIN “375% Growth in Faraday-Trainline Lithium Mineral Resource” Released 8 November 2023
3
ASX:WIN “WIN advances Butchers Creek towards development following resource update” Released 16 April 2025
4
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
WIN WELL FUNDED TO ADVANCE TOWARDS GOLD
PRODUCTION FOLLOWING PLACEMENT
12 December 2025
Table 2: WIN Metals Mt Edwards Nickel Mineral Resource Estimates
Deposit
Indicated Inferred TOTAL Resources
Tonne
(Mt)
Nickel
(%)
Tonne
(Mt)
Nickel
(%)
Tonne
(Mt)
Nickel
(%)
Nickel
Tonnes
Gillett* 2.27 1.35 0.87 1.16 3.14 1.30 40,770
Widgie 3* 0.51 1.34 0.22 1.95 0.73 1.53 11,200
Widgie Townsite* 1.65 1.60 0.85 1.38 2.50 1.53 38,260
Armstrong* 0.95 1.45 0.01 1.04 0.96 1.44 13,820
132N 0.03 2.90 0.43 1.90 0.46 2.00 9,050
Cooke 0.15 1.30 0.15 1.30 2,000
Inco Boundary 0.46 1.20 0.46 1.20 5,590
McEwen 1.13 1.35 1.13 1.35 15,340
McEwen
Hangingwall
1.92 1.36 1.92 1.36 26,110
Mt Edwards 26N 0.87 1.43 0.87 1.43 12,400
Zabel 0.27 1.94 0.05 2.04 0.33 1.96 6,360
TOTAL 5.68 1.48 6.97 1.39 12.66 1.43 180,900
All Resources reported at 1.0% Ni cut-off except for WTS, Widgie 3, Gillett and Armstrong which are reported at 0.7% Ni
cut- off. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
Table 3: WIN Metals Mt Edwards Lithium Mineral Resource Estimates
Deposit
Measured Indicated Inferred TOTAL Resources
Tonne
(kt)
Li2O
(%)
Tonne
(kt)
Li2O
(%)
Tonne
(kt)
Li2O
(%)
Tonne
(kt)
Li2O
(%)
Li2O
Tonnes
Faraday 550 0.75 250 0.66 220 0.61 1,020 0.7 7,100
Trainline - - 780 0.69 160 0.63 940 0.68 6,300
TOTAL 550 0.75 1,020 0.68 390 0.62 1,960 0.69 13,500
Reported above a cut-off grade of 0.30% Li2O to a depth of 310mRL (65m below surface) and 0.50% Li2O below 310mRL
to 250mRL. Tonnes and grade have been rounded to reflect the relative uncertainty of the estimates.
5
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
WIN WELL FUNDED TO ADVANCE TOWARDS GOLD
PRODUCTION FOLLOWING PLACEMENT
12 December 2025
Figure 1: WIN’s Gold, Nickel and Lithium Project Locations
Competent Person Statement – WIN Metals
The information in this announcement that relates to mineral resource estimates and exploration
results is based on information reviewed, collated and fairly represented by Mr William Stewart, who
is a full-time employee of WIN Metals Ltd. Mr Stewart is a member of the Australian Institute of Metallurgy
and Mining (Member No. 224335). Mr Stewart has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Stewart consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears. Additionally, Mr Stewart
confirms that the entity is not aware of any new information or data that materially affects the
information contained in the ASX releases referred to in this report.
Forward Looking Statements
This announcement includes forward-looking statements that are only predictions and are subject
to known and unknown risks, uncertainties, assumptions and other important factors, many of
which are beyond the control of WIN Metals Ltd, the directors and the Company’s management.
Such forward-looking statements are not guarantees of future performance.
Examplesof forward-looking statements used in this announcement include use of the words ‘may’,
‘could’, ‘believes’, ’estimates’, ‘targets’, ’expects’, or ‘intend’ and other similar words that involve
risks and uncertainties. These statements are based on an assessment of present economic and
6
ABN 77 648 687 094
Level 4, 220 St Georges Tce
Perth, WA 6000
PO BOX 7713
Cloisters Square WA 6850
T: +61 8 6381 7250
F: +61 8 6381 7299
info@winmetals.com.au
www.winmetals.com.au
ASX:WIN
WIN WELL FUNDED TO ADVANCE TOWARDS GOLD
PRODUCTION FOLLOWING PLACEMENT
12 December 2025
operating conditions, and on a number of assumptions regarding future events and actions that, as
at the date of announcement, are expected to take place.
Actual values, results, interpretations or events may be materially different to those expressed or
implied in this announcement. Given these uncertainties, recipients are cautioned not to place
reliance on forward-looking statements in the announcement as they speak only at the date of issue
of this announcement. Subject to any continuing obligations under applicable law and the ASX
Listing Rules, WIN Metals Ltd does not undertake any obligation to update or revise any information
or any of the forward-looking statements in this announcement or any changes in events, conditions
or circumstances on which any such forward-looking statement is based.
Summary Information
This announcement has been prepared by WINand includes information regarding WIN’s disclosure
of results to the ASX.
This announcement should also be read in conjunction with WIN’s other periodic and continuous
disclosure announcements lodged with the ASX, which are available at www.asx.com.au and
available on WIN’s website at www.winmetals.com.au.
Table 4: Reference documents included in this announcement
Number
Announcement
Date
Company Announcement Title
1 1-Jul-25 WIN Sale of non-core assets yield $1.4M for WIN to advance gold Assets
2 8-Nov-23 WIN 375% Growth in Faraday-Trainline Lithium Mineral Resource
3 16-Apr-25 WIN WIN advances Butchers Creek towards development following resource update
Compliance Statement
The Company confirms it is not aware of any new information or data that materially affects the
information included in the original market announcement(s), and in the case of estimates of
Mineral Resources that all material assumptions and technical parameters underpinning the
estimates in the relevant announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcement.
Share your feedback
Discover